Scheduling Old Forest Interior Space and Timber Production: Three Large-Scale Test Cases Using the DPspace Model to Integrate Economic and Ecological Objectives
UMN
LT-1203E
Last Modified: 12/1/2003 Size: 0 Author: Categories: Reports, Tags: Research Reports,