Title: Lineman
Alternate Title:
Description: Minnesota Department of Labor and Industry (DLI)
Subject: Electricians
Creation Date: 9/11/2008 2:14:28 PM
Modification Date: 8/16/2024 4:30:27 PM
Agency Name: Labor and Industry (DLI), Minnesota Department of
Agency URL: http://www.dli.mn.gov
Agency Description:
The agency oversees the state's programs for apprenticeship, construction codes and licensing, dual-training (PIPELINE Program), occupational safety and health, wage and hour standards, workers' compensation and youth skills training programs. The Office of Combative Sports, within the Department of Labor & Industry, ensures Minnesota's combative sporting events are conducted in a manner that minimizes injuries and ensures fair competition.
Agency Phone: 651-284-5005
Agency Fax: Agency URL: http://www.dli.mn.gov
Agency Address:
443 Lafayette Road N.
St. Paul
MN 55155
Division Name: Construction Codes and Licensing Division (CCLD)
Division URL: http://www.dli.mn.gov/about-department/our-areas-service/construction-codes-and-licensing
Division Description:
Division Phone: Division Fax: Division URL: http://www.dli.mn.gov/about-department/our-areas-service/construction-codes-and-licensing
Unit Name: Licensing and Certification Services
Unit URL:
Unit Description:
Unit Phone: 651-284-5034
Unit Fax: Contact person(s): dli.license@state.mn.us
Unit URL:
Audience: Hold
Application URL: https://www.dli.mn.gov/ims
Renewal URL: https://www.dli.mn.gov/ims
Versa URL:
Requirements:
Personal license experience and education requirements
Lineman, the minimum total is 48 months, including:
- planning for the installation of wiring, apparatus, and equipment for light, heat, and power: minimum experience of zero months, maximum credit allowance of zero months;
- laying out for the installation of wiring, apparatus, and equipment for light, heat, and power: minimum experience of zero months, maximum credit allowance of zero months;
- supervising the installation of wiring, apparatus, and equipment for light, heat, and power: minimum experience of zero months, maximum credit allowance of zero months;
- wiring for and installing electrical wiring, apparatus, and equipment: minimum experience of zero months, maximum credit allowance of 12 months;
- maintaining and repairing electrical wiring, apparatus, and equipment: minimum experience of zero months, maximum credit allowance of 12 months;
- line work: minimum experience of 24 months, maximum credit allowance of 48 months;
- installing elevators: minimum experience of zero months, maximum credit allowance of three months;
- wiring and maintaining technology circuits or systems: minimum experience of zero months, maximum credit allowance of six months; and
- wiring and maintaining process control circuits or systems: minimum experience of zero months, maximum credit allowance of zero months.
Continuing Education - Electrical
Rules: 3800.3500
3800.3510
3800.3520
Statutes: 326.242
Forms:
Fees: Go to
Payment Center
Period of Issuance:
Two years, expiring on the anniversary date of initial
issue.
Length of Determination: Two years, expiring on the anniversary date of initial issue.
Other Info:
Activity: Electricians
License Detail URL:
Electricians and Electrical Installers
License and Registration Lookup
Permits

