| 25-214 | | Xcel Energy proposes to construct and operate a battery energy storage system with a nominal power rating of up to 135.5 megawatts (MW) alternating current with approximately 542 megawatt-hours of energy capacity on a site consisting of approximately 70 acres adjacent to Xcel Energy's existing Blue Lake Peaking Plant in the City of Shakopee, Scott County, Minnesota | 06/09/2025 01:57 PM | |
| 25-205 | | Lake Charlotte, LLC proposes to construct the 150 MW Lake Charlotte Solar Facility and 150 MW / 600-megawatt hour (MWh) Battery Energy Storage System (BESS) in Rutland Township, Martin County, Minnesota. | 06/05/2025 05:30 PM | |
| 24-349 | | Wisconsin Power and Light Company is proposing to construct the Bent Tree North Wind Farm, an up to 153 megawatt (MW) wind farm in Freeborn, Waseca, and Steele County.
| 05/13/2025 03:39 PM | |
| 25-145 | | Northern States Power Company, a Minnesota corporation doing business as Xcel Energy, has submitted a Combined Application to the Minnesota Public Utilities Commission (Commission) for the proposed Lyon County Generating Station Project. This application seeks multiple approvals, including a Certificate of Need, Site Permit, Transmission Line Route Permit, and Pipeline Routing Permit, as well as a Partial Exemption for routing the pipeline. | 05/13/2025 03:26 PM | |
| 24-406 | | Crane Energy Storage LLC and Sandhill Energy Storage LLC propose to construct and operate two 200 MW/800 MWh battery energy storage systems (BESS) and ancillary support infrastructure in Olmsted County, Minnesota. | 03/13/2025 06:39 PM | |
| 25-123 | | North Star Energy Storage, LLC, proposes to construct the North Star Battery Energy Storage Project in the City of North Branch in Chisago County, MN. | 03/04/2025 03:39 PM | |
| 25-88 | | Summit Lake proposes to construct the Summit Lake Solar Facility and Battery Energy Storage System, collectively the Project, in Summit Lake and Elk Townships, Nobles County, Minnesota. The Solar Facility is proposed as a solar energy conversion facility with a 200-megawatt (MW) alternating current (AC) nameplate capacity. The associated BESS will consist of a stand-alone structure with a 200 MW / 800-megawatt hour (MWh) nameplate capacity and ancillary support infrastructure. The BESS will be constructed directly adjacent to the collector substation for the Solar Facility. | 01/29/2025 06:34 PM |
View All...
-
2025-01-29: Docket is open
|
| 24-267 | | Castle Rock Solar, LLC is proposing to construct an up to 150-megawatt solar energy generating facility in Dakota County, Minnesota. | 01/22/2025 06:56 PM | |
| 24-425 | | Minnesota Power proposes to construct and operate an up to 85-megawatt (MW) photovoltaic (PV) solar energy generating facility and an associated 2.45 mile 230 kilovolt (kV) transmission line (Gen-Tie Line) in Itasca County, Minnesota. | 01/16/2025 05:15 PM | |
| 24-263 | | The applicants propose to upgrade and construct approximately 29 miles of 115 kV transmission line in Swift County, Minnesota. | 01/13/2025 08:22 PM | |
| 24-294 | | Midwater BESS, LLC, a subsidiary of Spearmint Renewable Development Company, LLC, plans to build and operate a 150-megawatt battery energy storage system (BESS) and a 2,668-foot long 161 kV high voltage transmission line (HVTL) in Shell Rock Township, Freeborn County, Minnesota. The project, called the Midwater Energy Storage Project, will interconnect the BESS to the grid. Construction is expected to start in the first quarter of 2027, with commercial operations set for the end of 2027. | 12/03/2024 09:21 PM | |
| 24-309 | | Otter Tail Power Company is proposing to construct an up to 66 megawatt photovoltaic solar energy generating facility in Beltrami County, Minnesota. | 10/24/2024 03:24 PM |
View All...
-
2024-10-11: Docket is open
|
| 24-279 | | Snowshoe BESS, LLC proposes to construct and operate a battery energy storage system (BESS) with a nominal power rating of up to 150 megawatts (MW) alternating current (AC) with approximately 600 megawatt-hours (MWh) of energy capacity on a site of approximately 28 acres in Kalmar Township, Olmsted County, Minnesota. | 10/22/2024 03:59 PM |
View All...
-
2024-10-07: Docket is open
|
| 23-160 | | The Applicants propose to construct over 90 miles of new transmission line from Big Stone South, South Dakota to Alexandria, Minnesota along portions of Big Stone, Swift, Stevens, Pope, and Douglas Counties.
New transmission lines will be required to connect the existing substations in Big Stone South and Alexandria. Both of the existing substations would also require minor expansions. A new fiber optic Regeneration Station would also be needed within the central segment of the project on 0.23 acres of land. | 10/17/2024 07:25 PM |
View All...
-
2024-12-03: Application accepted
-
2025-04-10: Routes accepted for consideration
-
:
|
| 24-232 | | The Forks-Rost project will include construction of the new Forks Switching Station southwest of the City of Lakefield, in Jackson County, Minnesota, and a new, approximately 8.5 mile long, 161 kV high voltage transmission line. ITC indicates this project is needed to mitigate existing system low voltage issues and to help ensure long term area reliability when considering existing load and potential future area load growth. | 10/02/2024 04:06 PM | |
| 24-95 | | Dairyland Power Cooperative (Dairyland) is proposing to construct an approximately 3.5 mile 161 kilovolt (kV) high voltage transmission line and associated facilities on a new right-of-way in York Township in Fillmore County, Minnesota. | 09/04/2024 04:27 PM | |
| 22-57 | | Proposed 150 megawatt (MW) solar energy generation facility and 50 MW energy storage facility in Faribault County, Minnesota. | 08/30/2024 06:39 PM |
View All...
-
2024-08-14: Docket is open
-
2024-09-17: Application accepted
|
| | | 08/28/2024 08:13 PM | |
| 24-215 | | Coneflower Energy, LLC is proposing to construct an up to 235-megawatt solar energy generating facility in Lyon County, Minnesota. | 08/20/2024 05:30 PM | |
| 23-423 | | Benton Solar, LLC proposes to construct a 100 megawatt (MW) solar energy generating facility, a 100 MW battery energy storage system, and a 0.4 mile long, 115 kilovolt high voltage transmission line within Minden Township, Benton County, Minnesota. | 08/02/2024 04:53 PM |
View All...
-
2023-09-20: Docket is open
|
| 23-477 | | Birch Coulee Solar, LLC is proposing to construct an up to 125-megawatt photovoltaic solar energy generating facility in Renville County, Minnesota.
| 07/18/2024 06:05 PM | |
| 24-132 | | Great River Energy proposes to construct a new 4.3 mile long 115 kV transmission line in Laketown and Dahlgren Townships in Carver County. | 07/16/2024 07:26 PM |
View All...
-
2024-07-16: Docket is open
-
2024-10-01: Application accepted
|
| 23-157 | | Proposed construction and operation of approximately 130 miles of 345 kV transmission line from the Wilmarth Substation in Mankato, MN to the Mississippi River near Kellogg, MN. The project will also include the construction of new 161 kV transmission line, approximately 20 miles long from the existing North Rochester Substation near Pine Island, Minnesota to a connection point with an existing 161 kV Chester transmission line northeast of Rochester, Minnesota. | 04/22/2024 07:28 PM | |
| 23-388 | | Dairyland Power Cooperative has submitted a joint Certificate of Need and Route Permit Application to the Minnesota Public Utilities Commission to relocate approximately 13.3 miles of 161-kilovolt (kV) high voltage transmission line (HVTL) and construct a new substation in Wabasha County, Minnesota. | 03/28/2024 09:08 PM | |
| 24-106 | | Gopher State Solar, LLC is proposing to construct and operate a 200 MW solar energy generating facility in Renville County, Minnesota. | 03/14/2024 03:38 PM | |
| 23-414 | | Iron Pine Solar Power, LLC is proposing an up to 325 megawatt photovoltaic solar energy generating system and a 230 kilovolt high voltage transmission line in Kettle River Township, Pine County, Minnesota. | 03/11/2024 05:24 PM | |
| 24-68 | | Xcel Energy is proposing additional dry cask storage of spent nuclear fuel at the Prairie Island nuclear plant. The additional storage would allow continued operation of the plant until 2054. | 03/08/2024 09:01 PM |
View All...
-
2024-04-09: Environmental document available
-
2024-04-18: Application accepted
-
2024-10-31: Draft EIS available
-
2025-02-07: Final EIS available
-
2025-03-25: Hearing
|
| 22-451 | | Enbridge Solar (Plummer), LLC is proposing to construct an up to 130 MW solar energy generating system located in Emardville Township in Red Lake County, Minnesota. | 02/16/2024 09:25 PM | |
| 23-410 | | The Commission issued a route permit to Great River Energy to rebuild an existing 69 kV transmission line in Eagan and Burnsville as 115 kV transmission line. | 12/11/2023 05:57 PM | |
| 23-392 | | Dooley's Natural Gas II, LLC (Dooley's) is proposing to construct approximately 28 miles of 4-inch and 2-inch pipeline in Chippewa, Swift, and Kandiyohi Counties | 10/06/2023 02:36 PM | |
| 22-415 | | Minnesota Power and Great River Energy propose to construct approximately 140 miles of new double-circuit 345 kV transmission line and to replace approximately 40 miles of existing transmission line with double-circuit 345 kV transmission line. The project would connect the existing Iron Range substation, near Grand Rapids, Minn., to a new Big Oaks substation near Monticello, Minn. | 08/02/2023 07:25 PM | |
| 23-159 | | Xcel Energy proposes to string approximately 105-108 miles of new transmission line on existing double-circuit capable structures running from the existing Alexandria Substation in Alexandria, Minnesota to Becker, Minnesota, where new transmission lines would be needed to cross the Mississippi River and facilitate the new Big Oaks Substation. | 07/17/2023 07:29 PM |
View All...
-
2024-10-03: Permit issued
-
2024-08-29: ALJ report issued
-
2023-09-29: Docket is open
|
| 23-217 | | Xcel Energy proposes to construct a new 250 MW solar energy project in Sherburne County, Minnesota | 07/03/2023 07:43 PM |
View All...
-
2023-06-16: Docket is open
-
2024-07-31: Permit issued
|
| 23-170 | | Great River Energy proposes to construct a new 6.3 mile long 115 kV transmission line in Rice County and Scott County. | 06/27/2023 05:47 PM |
View All...
-
2023-05-03: Docket is open
|
| 22-611 | | To modernize the Minnesota terminal of the existing Square Butte high voltage direct current (HVDC) line that runs from North Dakota to Northeast Minnesota, a new terminal, new substation, and three high voltage transmission lines are proposed on a new site near the existing Arrowhead Substation in St. Louis County, Minnesota. | 06/02/2023 07:09 PM |
View All...
-
2024-08-01: Permit issued
-
2023-08-29: Public meeting
-
2023-08-08: Application accepted
|
| 23-109 | | The Magellan Pipeline Company proposes to relocate approximately 0.74 miles of an existing petroleum pipeline in Pipestone County.
| 04/13/2023 01:58 PM | |
| 22-132 | | Xcel Energy has applied for a certificate of need and a route permit to construct an approximately 180-mile double-circuit 345 kilovolt transmission line and associated facilities connecting the Sherburne County Generation Station Substation (Sherco Substation) in Becker, Minnesota, and a new substation in Lyon County, Minnesota. The project is in Sherburne, Stearns, Kandiyohi, Wright, Meeker, Chippewa, Yellow Medicine, Renville, Redwood, and Lyon counties. | 03/30/2023 08:31 PM |
View All...
-
2024-01-16: Application accepted
-
2024-01-31: Public meeting
-
2024-05-13: Scoping decision
-
2024-10-08: Draft EIS available
-
: Hearing
-
: Final EIS available
-
: ALJ report issued
-
: Permit Decision
-
: Docket closed
|
| 22-122 | | The project would replace existing natural gas burners with dual-fuel burners and install associated facilities to allow ULSD fuel oil combustion during periods of natural gas curtailment. The project is expected to protect GRE customers from extremely high energy prices. | 03/30/2023 06:40 PM | |
| 23-43 | | Heartland Corn Products proposes to construct an approximately 7.78-mile long, 6.625-inch outside diameter natural gas pipeline in Sibley County, Minnesota. The pipeline will originate near 595th Avenue, north of Highway MN- 19 (west of the City of Winthrop) and tie into the Hutchinson Utilities Commission pipeline at a new interconnect station. | 03/20/2023 04:02 PM |
View All...
-
2023-03-20: Docket is open
-
:
|
| 21-792 | | Lake Wilson Solar Energy proposes to construct and operate Lake Wilson Solar Energy Center, an up to 150 megawatt alternating current photovoltaic solar energy generating facility with 95 megawatts of battery storage in Leeds Township, Murray County, Minnesota. | 11/29/2022 05:14 PM |
View All...
-
2023-04-04: Application accepted
-
2023-05-10: Public meeting
-
2023-08-04: Scoping decision
-
2023-10-18: Environmental document available
-
2024-03-21: Permit issued
|
| 22-422 | | Summit Carbon Solutions, LLC, proposes to construct about 30 miles of carbon dioxide pipeline through Otter Tail and Wilkin Counties. | 10/27/2022 03:04 PM | |
| 22-235 | | Great River Energy proposes to replace and upgrade 3.2 miles of existing 69-kV transmission line with 115-kV transmission line in St. Joseph, MN. Two existing substations along the route will be modified to accommodate the upgrade. | 08/05/2022 09:19 AM |
View All...
-
2022-11-21: Application accepted
-
2022-12-07: Public meeting
-
2023-05-01: Environmental document available
-
2023-10-23: Permit issued
|
| 09-1197 | | The proposed repowering of the Pleasant Valley Wind Project will consist of upgrading the existing 100 Vestas V100 turbines with Vestas V110, 2.2 MW turbines. Existing wind turbine towers will remain in place and be used for the installation of the new Vestas V110 turbines. Repowering of 86 of 100 existing turbines will involve the replacement of some components of the existing turbine nacelles and installing rotors with longer blades. The remaining 14 turbines will be repowered by replacing the entire turbine nacelle and a rotor with longer blades. New, larger turbine blades, coupled with upgraded generators will result in an increase of nominal production capacity of the Pleasant Valley Wind Project from 200 MW to 220 MW. | 06/21/2022 01:35 AM | |
| 21-266 | | BP Midwest Product Pipelines Holding, LLC (BPMW) is proposing to reroute a section of pipeline near the Rochester International Airport in Olmsted County, Minnesota. | 03/31/2022 11:57 AM | |
| 21-643 | | The Rose Wind Project is currently operating and consists of 11 turbines that were previously permitted by Mower County, under seven separate limited liability companies. The Rose Wind Project will be repowered, renamed the Rose Creek Wind Project and operate under one company. Once repowered, the Rose Creek Wind Project will consist of six or seven wind turbines, and have a nameplate capacity of 17.4 MW. | 02/16/2022 10:56 PM | |
| 21-141 | | On October 21, 2021, Minnesota Power (Applicant) submitted a Certificate of Need (CN) Application and a high voltage transmission line (HVTL) Route Permit Application (RPA) to the Minnesota Public Utilities Commission (Commission). The RPA is submitted under the alternative review process (Minnesota Statute 216E.04; Minnesota Rule 7850.2800-3900). | 10/25/2021 10:21 AM |
View All...
|
| 21-668 | | Xcel Energy is proposing additional dry cask storage of spent nuclear fuel at the Monticello nuclear plant. The additional storage would allow continued operation of the plant until 2040. | 09/15/2021 02:51 PM |
View All...
-
2022-02-15: Application accepted
-
2022-01-25: Public meeting
-
2022-03-02: Scoping decision
-
2022-10-04: Environmental document available
-
2022-10-26: Public meeting
-
2023-03-29: Public hearing
-
2023-06-29: ALJ report issued
-
2023-10-17: Certificate of Need Issued
-
: Project built
|
| 20-763 | | Byron Solar, LLC is proposing to build a 200 MW solar project in Dodge County Minnesota. The Byron Solar Project would connect to the electrical grid via approximately three to four and one-half miles of newly constructed 345 kV transmission line.
| 08/19/2021 02:12 PM | |
| 21-113 | | Hayward Solar, LLC is proposing to build and operate a 150 MW solar farm in Freeborn County. | 04/28/2021 04:28 PM |
View All...
-
2021-06-29: Application accepted
-
2021-08-11: Public meeting
-
2021-11-30: Scoping decision
-
2022-03-01: Environmental document available
-
2022-03-29: Public hearing
-
2022-06-06: ALJ report issued
-
: Permit issued
-
: Project built
-
: Docket closed
|
| 21-189 | | Northern States Power Company, doing business as Xcel Energy is proposing to construct an up to 460-megawatt solar project and two 345 kilovolt transmission lines to interconnect the Solar Project to the
grid. As proposed, the West high voltage transmission line (HVTL) is approximately 3.2 miles long and the East HVTL line is approximately 1.7 miles long; both HVTL lines connect the Solar Project to the existing
Sherburne County Substation. The Solar Project will partially replace energy production of the Sherco Generating Plant Unit 2, currently a coal-powered facility, which will cease operations in 2023. | 04/21/2021 09:20 AM |
View All...
|
| 20-872 | | Petroleum Fuels Company (PFC) is proposing to construct a 5,600 foot long natural gas pipeline in Dakota County. The pipeline will transport natural gas from a processing facility near the Pine Bend landfill to an interconnection with the Northern States Power gas system. | 12/31/2020 12:59 PM |
View All...
-
2021-02-23: Application accepted
-
2021-03-25: Public meeting
-
2021-07-07: Permit issued
-
: Project built
-
: Docket closed
|
| 19-621 | | Big Bend Wind, LLC has proposed the construction and operation of an 18 mile long 161 kilovolt (kV) high voltage transmission line (HVTL) to be located in Cottonwood, Martin, and Watonwan Counties, Minnesota. The proposed 161 kV HVTL is proposed to begin at the Big Bend Wind Project substation, and extend 18 miles to a proposed step-up substation to be located less than 1,500 feet of the Crandell Switching Station. | 11/19/2020 03:40 PM | |
| 19-620 | | Red Rock Solar, LLC, a subsidiary of Apex Clean Energy, LLC, has proposed to construct and operate the Red Rock Solar Project in Cottonwood County, Minnesota. The proposed Red Rock Solar Project would generate up to 60 megawatts (MWs), and the anticipated project size is 483 acres. | 11/19/2020 03:00 PM | |
| 19-619 | | Big Bend Wind, LLC, a subsidiary of Apex Clean Energy, Inc., is proposing the Big Bend Wind Project located within portions of Cottonwood and Watonwan counties, Minnesota. The Big Bend Wind Project is proposing to constructed and operate 47 Nordex N-163 (5.7 MW), 48 Vestas V162 (5.6 MW), or 49 GE-158 (5.5 MW) turbines, which will have a total generation capability of up to 308 megawatts (MWs).
| 11/18/2020 12:10 PM |
View All...
|
| 18-700 | | Plum Creek Wind Farm, LLC proposes to construct a 414 megawatt (MW) wind farm and associated 345 kV transmission line in Cottonwood, Murray, and Redwood County, Minnesota. | 04/28/2020 03:56 PM |
View All...
-
2020-01-30: Application accepted
-
2020-06-16: Public meeting
-
2020-11-03: Scoping decision
-
2021-01-11: Draft EIS available
-
2021-02-01: Public meeting
-
2021-02-16: Public hearing
-
: Final EIS available
-
: ALJ report issued
-
: Permit issued
-
: Project closed
|
| 18-701 | | Plum Creek Wind Farm, LLC proposes to construct a 414 megawatt (MW) wind farm and associated transmission line in Cottonwood, Murray, and Redwood County, Minnesota. The transmission line is proposed to be a 345 kilovolt (kV) line, with a length of approximately 31 miles. | 12/02/2019 12:33 PM |
View All...
|
| 19-576 | | Three Waters Wind Farm, LLC is proposing the 201 MW Three Waters Wind Farm in Jackson County, Minnesota. The proposed project area also extends into Osceola and Dickinson Counties, Iowa. The proposed project is primarily planned to be located within Jackson County, Minnesota, but project areas within Osceola and/or Dickinson Counties, Iowa may be utilized as alternative locations should they be necessary.
Three Waters Wind Farm, LLC has also applied for a Certificate of Need (CN), which can be found under docket #IP-7002/CN-19-154. | 10/11/2019 12:14 PM |
View All...
-
2019-12-23: Application accepted
-
2020-02-20: Public meeting
-
:
|
| 19-495 | | On September 16, 2019, Geronimo Energy submitted a site permit application to the Minnesota Public Utilities Commission (Commission) under the alternative review process (Minnesota Statute 216E.04; Minnesota Rule 7850.2800-3900) for an 80 megawatt (MW) solar energy conversion facility on approximately 681 acres. The Commission issued a site permit on December 31, 2020. On June 2, 2023, Elk Creek Solar requested a permit amendment to increase the nameplate capacity to 160 MW, and to increase the area upon which the project to be built to approximately 1,161 acres. On June 11, 2024, the Commission issued an Amended Site Permit. The project is planned in Vienna and Magnolia Townships, Rock County, Minnesota. | 09/23/2019 10:25 AM |
View All...
-
2019-12-23: Application accepted
-
2020-01-13: Public meeting
-
2020-02-06: Scoping decision
-
2020-06-16: Environmental document available
-
2020-07-23: Public hearing
-
: Permit issued
-
: Project built
-
: Docket closed
|
| 19-395 | | Regal Solar, LLC was granted a site permit to construct the 100 MW Regal Solar Project in Benton County. | 07/22/2019 12:46 PM |
View All...
-
2019-10-11: Application accepted
-
2019-11-13: Public meeting
-
2019-12-04: Scoping decision
-
2020-11-06: Environmental document available
-
2020-12-01: Public hearing
-
2021-04-26: Permit Decision
-
: Project built
|
| 18-752 | | Enbridge Energy, Limited Partnership has applied for a Pipeline Route Permit and Partial Exemption for the Fond du Lac Line 4 Project on the Fond du Lac Band of Lake Superior Chippewa Reservation. The Project will relocate approximately 10 miles of the existing Line 4 pipeline from the center to the outer edge of the existing Enbridge Mainline Corridor within the Fond du Lac Band Reservation. | 03/04/2019 11:22 AM |
View All...
-
2019-02-25: Docket is open
-
2019-04-11: Application accepted
-
2019-05-22: Public meeting
-
2019-06-28: ALJ report issued
-
: Permit Decision
-
: Project built
-
: Project Closed
|
| 20-867 | | Dodge County Wind proposes to construct approximately 27 miles of 161 kV transmission line in Dodge and Mower counties in Minnesota. | 07/09/2018 12:42 PM |
View All...
-
2018-10-04: Application accepted
-
2018-10-25: Public meeting
-
Upcoming: Scoping decision
|
| 20-866 | | Dodge County Wind, LLC (DCW or applicant), a subsidiary of NextEra Energy Resources, LLC, proposes to construct and operate a 259-megawatt (MW) wind farm in Dodge and Steele Counties and an associated 161 kV transmission line in Dodge and Mower counties. The Commission issued site and route permits for the project in June 2024.
| 06/25/2018 04:35 PM |
View All...
-
2018-06-29: Docket is open
-
2018-10-04: Application accepted
-
2018-10-25: Public meeting
-
2019-04-18: Scoping decision
-
2019-07-29: Draft EIS available
|
| 17-700 | | Blazing Star 2 Wind Project is a 200 MW LWECS planned for construction in Lincoln County | 11/21/2017 12:00 AM |
View All...
-
2018-01-29: Application accepted
-
2018-02-20: Public meeting
-
2018-05-11: Draft permit issued
-
2018-11-06: Permit issued
-
Upcoming: Project built
-
Upcoming: Docket closed
|
| 17-410 | | Freeborn Wind Energy, LLC, an affiliate of Invenergy, LLC, has proposed to construct and operate the 200 MW Freeborn Wind Farm in Freeborn County, Minnesota and Worth County, Iowa | 06/14/2017 12:00 AM |
View All...
-
2017-08-31: Application accepted
-
2017-09-20: Public meeting
-
2018-01-30: Draft permit issued
-
2018-02-20: Public hearing
-
2018-05-14: ALJ report issued
-
2018-12-19: Permit issued
-
Upcoming: Project built
-
Upcoming: Docket closed
|
| 15-858 | | Minnesota Energy Resources Corporation is proposing to install approximately 13.1 miles of new natural gas pipeline west and south of the city of Rochester in Olmsted County, Minnesota | 11/03/2015 12:00 AM |
View All...
-
2016-02-03: Application accepted
-
2016-02-29: Public meeting
-
2016-07-26: Routes accepted for consideration
-
2016-09-16: Environmental document available
-
Upcoming: Public hearing
-
Upcoming: Permit issued
-
Upcoming: Project built
-
Upcoming: Docket closed
|
| 15-137 | | Enbridge Energy proposes to replace 337 miles of the Line 3 Pipeline in Minnesota. Line 3 originates in Canada, continues through North Dakota, enters Minnesota in Kittson County, and terminates in Superior, Wiscsonsin. | 02/23/2015 12:00 AM |
View All...
-
2015-07-01: Application accepted
-
2016-04-25: Public meeting
-
2016-12-05: Scoping decision
-
2017-05-15: Draft EIS available
-
2017-09-26: Public hearing
-
2018-02-02: Final EIS available
-
2018-04-24: ALJ report issued
-
2018-10-26: Permit issued
-
: Project built
-
Upcoming: Docket closed
|
| 10-1307 | | The Savanna HVTL Project is a proposal by Great River Energy and Minnesota Power for new switching station and rebiuld of an existing 69 kV line to a 115 kV HVTL in St. Louis and Carlton Counties | 01/24/2011 12:00 AM |
View All...
-
Upcoming: Application accepted
-
Upcoming: Public meeting
-
Upcoming: Scoping decision
-
Upcoming: Environmental document available
-
Upcoming: Public hearing
-
Upcoming: Permit issued
-
Upcoming: Project built
-
Upcoming: Docket closed
|
| 08-1474 | | A 237-mile 345 kilovolt (kV) transmission line and associated facilities running from Brookings County, South Dakota, to Hampton, Minnesota. The project began operation in 2015. | 12/29/2008 12:00 AM |
View All...
-
2009-01-27: Application accepted
-
2009-03-30: Public meeting
-
2009-06-30: Scoping decision
-
2009-10-20: Draft EIS available
-
2009-11-12: Public meeting
-
2009-11-30: Public hearing
-
2010-01-26: Final EIS available
-
2010-09-14: Permit Decision
-
2015-03-26: Project built
-
Upcoming: Docket closed
-
2023-11-15: Docket is open
|
| 08-510 | | Xcel Energy is proposing a change in spent fuel storage technology at the Prairie Island ISFSI. | 05/27/2008 12:00 AM |
View All...
-
2008-08-18: Application accepted
-
2008-09-10: Public meeting
-
2008-11-14: Scoping decision
-
2009-03-17: Draft EIS available
-
2009-04-21: Public meeting
-
2009-05-14: Public hearing
-
2009-07-31: Final EIS available
-
2009-12-18: Permit issued
-
Upcoming: Project built
-
Upcoming: Docket closed
|