Hampton to Rochester to La Crosse 345kV and 161kV Transmission Line
Project Docket
Docket No | E002/TL-09-1448 |
Project name | Hampton to Rochester to La Crosse 345kV and 161kV Transmission Line |
Applicant | Xcel Energy |
Description | Xcel Energy Application to construct a new 345 kV and a new 161kV transmission line from the Hampton Substation, through Rochester, to a proposed substation in La Crosse, Wis |
Location | Dakota County, Goodhue County, Olmsted County, Wabasha County |
Contact | David Birkholz david.birkholz@state.mn.us |
Status |
View All...
|
eDockets | 09-1448 |
Project Summary
Project Segment |
Construction Planned |
Completed/Energized |
North Rochester to Northern Hills 161 kV | Jan. 2013 - May 2013 | May 2014 |
North Rochester to Mississippi River 345 kV | June 2013 - July 2014 | September 2015 |
North Rochester to Chester 161 kV | Nov. 2014 - May 2015 | January 2016 |
Hampton to North Rochester | Dec. 2014 - Oct. 2015 | September 2016 |
Xcel Energy has submitted a Route Permit application to construct and operate a new 345 kV and a new 161kV transmission line between the existing Hampton Substation and a new substation near La Crosse, Wis.
Within Minnesota, the proposed 345kV transmission line would be 80 to 90 miles in length. The proposed 161kV transmission line would be approximately 15 miles in length. The proposal also includes construction of a new North Rochester Substation between Pine Island and Zumbrota, Minn., and improvements to the Hampton and Northern Hills Substations. The proposed project would be located in Dakota, Goodhue, Olmsted and Wabasha counties.
(On May 22, 2009, the Commission issued an Order granting a Certificate of Need (CN) for the CapX 2020 projects. The CN record can be reviewed by entering year "06" and number "1115" at https://www.edockets.state.mn.us/EFiling/search.jsp . OES environmental analysis for the CN record can be viewed at http://mn.gov/commerce/energyfacilities/Docket.html?Id=19120.)
Key Project Documents
Date | Title | Description |
---|---|---|
05/30/2012 | Commission Order Granting a Route Permit for the CapX Hampton-Rochester-La Crosse Transmission Line | The Public Utilities Commission has issued a route permit for the CapX Hampton-Rochester-La Crosse transmission line project in Dakota, Goodhue, Olmsted and Wabasha counties. Findings of Fact, the Permit, and Route Maps are included in the Order issued May 30, 2012 |
08/31/2011 | Final Environmental Impact Statement for the CapX Hampton-Rochester-La Crosse 345 KV and 161 kV Transmission Lines Project | The final environmental impact statement (final EIS) provides an overview of the proposed project and its alternatives, the regulatory framework, and an analysis of the potential impacts and mitigative measures which may minimize the impacts of the project. The final EIS responds to public comments received on the draft EIS |
01/20/2010 | Route Permit Application | Route Permit Application for the proposed 345kV and 161kV transmission lines from Hampton, Minn. to La Crosse, WI |