Project Database

Project type:
Project status: help icon ALJ report issued:
Application accepted: Projects for which an application has been submitted and accepted.
Docket closed: Projects that have been completed and are no longer under the permitting authority of the Public Utilities Commission.
Environmental document available: Projects for which an environmental document has been completed.
Open projects: All projects currently in the permitting process and all rulemaking processes open for comment.
Permit denied: Projects where a site or route permit has been denied by the PUC.
Permit issued: Projects where a site or route permit has been issued by the PUC
Project built: Projects that have been built.
Project closed: Rulemaking processes and certificate of need processes that have concluded.
Project not built: Projects for which a permit was issued but for some reason the project was not built.
Public hearing: Projects for which a public hearing has been held.
Public meeting: Projects for which a public meeting has been held.
Scoping decision: Projects for which a scoping decision has been issued.
Location:
Records: 281
Docket Number Project Name Description Applicant Status
17-322
Freeborn Wind Energy LLC proposes to construct an approximately seven-mile long 161 kilovolt high voltage transmission line to interconnect the proposed Freeborn Wind Farm with the existing Glenworth Substation southeast of Glenville, Minnesota in Freeborn County
Freeborn Wind Energy LLC • Upcoming: Application accepted
more
17-597
Nobles 2 Wind Project is a 260 MW LWECS planned for construction in Nobles County, with the purpose of delivering renewable energy to Minnesota Power customers.
Nobles 2 Power Partners, LLC • Upcoming: Application accepted
more
17-410
Freeborn Wind Energy, LLC, an affiliate of Invenergy, LLC, has proposed to construct and operate the 200 MW Freeborn Wind Farm in Freeborn County, Minnesota and Worth County, Iowa
Invenergy, LLC • 2017-08-31: Application accepted
more
17-265
Palmer's Creek Wind Farm, LLC has applied for a Site Permit to construct and operate a 44.6 MW Large Wind Energy Conversion System (LWECS) in Chippewa County
• 2017-09-11: Public hearing
more
16-685
Great Plains seeks a Route Permit to construct an approximately 3- mile long, 8.625-inch-outside-diameter, high pressure natural gas transmission pipeline from its Fergus Falls Town Border Station (TBS) to its Green Plains Ethanol valve site in Otter Tail County
Great Plains Natural Gas • Upcoming: Application accepted
more
16-618
The proposed Red Pine Wind Project will produce up to 200.1 megawatts (MW) of energy, and is located in Lincoln County, Minnesota
EDF Renewable Energy, Inc. • 2017-03-06: Public hearing
more
16-686
Blazing Star Wind Farm, LLC proposes to construct and operate, the up to 200 MW Blazing Star Wind Project in Lincoln County, Minnesota
Geronimo Wind Energy, LLC • 2017-02-27: Draft permit issued
more
16-656
Northern States Power Company (Xcel Energy) is proposing to construct an approximately 11,300 foot long, 16-inch outside-diameter, high pressure (650 psig) natural gas pipeline from the Northern Natural Gas Company Cedar Station in Eagan to Northern States Power Companys Black Dog Generating Plant in Burnsville, Minnesota
Xcel Energy • Upcoming: Application accepted
more
16-327
Minnkota Power Cooperative proposes to build an approximately 9.4-mile 115 kilovolt high voltage transmission line and a new 115/4.16 kV distribution substation. This project, referred to as the MPL-Laporte 115 kV Transmission Line Project, will serve an industrial load for a new pumping station to be constructed and operated by Minnesota Pipeline Company, LLC
Minnkota Power Cooperative
15-858
Minnesota Energy Resources Corporation is proposing to install approximately 13.1 miles of new natural gas pipeline west and south of the city of Rochester in Olmsted County, Minnesota
Minnesota Energy Resources Corporation • 2016-09-16: Environmental document available
more
15-834
Xcel Energy proposes to construct a 215 MW peaking natural gas-fired combustion turbine at its existing Black Dog Generating Plant in the city of Burnsville in Dakota County
Xcel Energy • 2016-09-26: Permit issued
more
15-423
Great River Energy proposes to construct approximately 13 miles of new 115 kilovolt transmission line and a new 115 kV breaker station, in Aitkin County, northeast of the city of Aitkin
Great River Energy • 2016-05-05: Public hearing
more
15-628
Great River Energy proposes to construct approximately 2.5 miles of new 115 kV electric transmission line near the city of Backus in Cass County
Great River Energy • 2016-03-30: Public hearing
more
15-620
Mankato Energy Center II, LLC proposes to construct a 345 MW expansion of the Mankato Energy Center in the city of Mankato, Blue Earth County
Calpine; Mankato Energy Center II, LLC • 2016-06-23: Permit issued
more
15-204
Great River Energy (GRE) and Minnesota Power (MP) are proposing to construct the Motley Area 115 kV Project, a 115 kilovolt (kV) high voltage transmission line (HVTL) and associated facilities near the city of Motley in Morrison, Cass and Todd counties.
Great River Energy; Minnesota Power • 2016-03-23: Permit issued
more
14-1052
Site permit application for a 62.25 megawatt (MW) solar energy facility in Lyon County
Marshall Solar, LLC • 2016-05-05: Permit issued
more
15-137
Enbridge Energy proposes to replace 337 miles of the Line 3 Pipeline in Minnesota. Line 3 originates in Canada, continues through North Dakota, enters Minnesota in Kittson County, and terminates in Superior, Wiscsonsin.
Enbridge, LLP • 2016-12-05: Scoping decision
more
15-33
North Star Solar PV, LLC is filing a Joint Application for a 100 MW solar generating plant site permit and connecting 115 kV transmission line route permit in Chisago County
North Star Solar PV, LLC • 2016-12-08: Project built
more
14-977
Minnesota Power's proposed 16 Line Reroute project is an approximately three-mile-long 115 kilovolt HVTL located in St. Louis County, Minnesota
Minnesota Power • 2016-01-22: Permit issued
more
14-797
Great River Energy and Minnesota Power propose to construct a new 115 kV transmission line and to construct and modify substations near the city of Menahga in Hubbard, Wadena, and Becker County
Great River Energy; Minnesota Power • 2016-03-14: Permit issued
more
14-320
A Comparative Environmental Review of the Proposed Minnesota Pipe Line Reliability Project and the Alternatives Identified in the Certificate of Need Application
Minnesota Pipeline Company, LLC • 2015-08-31: Project closed
more
14-665
Minnkota Power is planning a new 115 kV transmission line and new 115/4.16 substation in Clearwater County
Minnkota Power Cooperative, Inc. • 2016-09-13: Application withdrawn
more
14-515
Aurora Distributed Solar, LLC (Aurora) proposes to construct distributed photovoltaic (PV) solar generation systems and associted facilities totaling 100 MW (alternating current nameplate capacity), to be located at up to 24 locations in Minnesota.
Aurora Distributed Solar, LLC • 2015-06-30: Permit issued
more
14-21
Minnesota Power, in partnership with Manitoba Hydro, proposes to construct a 500 kV high voltage transmission line (HVTL) from the International border that would terminate at the Blackberry Substation in Itasca County
Minnesota Power
13-591
Odell Wind Farm, LLC is proposing to construct 9.5 miles of 115 kV transmission line to transmit energy generated at the planned 200 MW Odell Wind Farm to the Woad Hill Substation
Geronimo Wind Energy, LLC; Odell Wind Farm, LLC • 2014-10-29: Permit issued
more
13-978
Minnesota Power is proposing to construct an approximate 5,900-foot-long, 10.75-inch-outside diamter, high pressure natural gas pipeline from a Northern Natural Gas pipeline to its Laskin Energy Center in Hoyt Lakes in St. Louis County
Minnesota Power • 2014-05-12: Permit issued
more
13-474
North Dakota Pipeline Company LLC (NDPC) is proposing to develop a new crude oil pipeline and associated facilities known as the Sandpiper Project to increase crude oil transportation services from North Dakota to refineries in the the U.S. Midwest and eastern Canada. The Sandpiper Project route would extend from NDPC's Beaver Lodge Station south of Tioga, North Dakota, to the Superior Terminal in Superior, Wisconsin.
Enbridge Energy • 2016-04-25: Public meeting
more
12-1163
Minnesota Power hereby applies to the Minnesota Public Utilities Commission for a Certificate of Need to construct the Great Northern Transmission Line
Minnesota Power • 2015-03-16: ALJ report issued
more
13-843
Odell Wind Farm, LLC has applied for a Large Wind Energy Conversation System Site Permit for the 200 MW Odell Wind Farm in Cottonwood, Jackson, Martin, and Watonwan counties
Geronimo Wind Energy, LLC • 2014-07-17: Permit issued
more
13-805
Minnesota Power proposes to construct two, approximately five-mile, 115 kV HVTLs and a substation near Coleraine, Minnesota. The two transmission lines, each 5.2 miles in length, would be constructed parallel to one another with an overlapping ROW of 160 feet.
Minnesota Power • 2014-11-12: Project built
more
12-1240
The Commission has initiated a Competitive Resource Acquisition Process (RAP) through which it will select resources to meet the need identified in Xcel Energy's 2010 Integrated Resource Plan (IRP). In its review the Commission will consider alternative proposals from Xcel Energy, Calpine Corporation, Invenergy, Geronimo Energy, and Great River Energy
Calpine; Geronimo Wind Energy, LLC; Great River Energy; Northern States Power dba Xcel Energy; Invenergy • 2015-02-05: Project closed
more
13-68
Minnesota Power proposes to construct approximately one mile of new 115 kV transmission line, approximately 0.3 miles of new 230 kV transmission line, and a replacement substation east of the city of Deer River in Itasca County. The Deer River Transmission Project would also rebuild approximately 0.9 miles of an existing 115 kV transmission line, and remove approximately 7.5 miles of existing 115 kV transmission line
Minnesota Power • 2015-12-14: Project built
more
13-216
EDF Renewable Energy is applying for an LWECS permit in Pipestone and Murray counties through its Stoneray Power Partners, LLC subsidiary
Stoneray Power Partners, LLC • 2016-07-21: Permit Amended
more
12-1337
ITC Midwest, LLC (ITCM) proposes to construct a new 345 kV transmission line in Jackson, Martin, and Faribault County; to reroute several existing 161 kV lines; and to construct a new substation near the cities of Winnebago and Blue Earth.
ITC Midwest LLC • 2014-11-25: Permit issued
more
12-1151
Xcel Energy proposes to replace an existing 115 kV transmission line with a new, double circuit 115 kV transmission line and to modify two existing substations in northeast Ramsey County
Northern States Power dba Xcel Energy • 2015-05-20: Docket closed
more
12-1245
Great River Energy proposes to rebuild a portion of the existing 69 kV transmission system and construct a new double-circuit 115 kV transmission line in Scott and Rice counties
Great River Energy • 2016-08-25: Project built
more
12-1123
Minnesota Power proposes to construct a new, approximately 2.8-mile-long 115 kV HVTL from MP's existing 39 line in the city of Eveleth to MP's existing 37 line northwest of the city of Leonidas
Minnesota Power • 2014-06-10: Project built
more
12-401
Xcel Energy proposes to upgrade the Chaska Area 69 kV transmission line to 115 kV capacity in in eastern Carver County and northern Scott County near and within the City of Chaska, and through Laketown, Dahlgren, and Jackson townships
Great River Energy; Northern States Power dba Xcel Energy • 2015-09-09: Project built
more
12-113
The proposed project is intended to meet electrical needs in the Plymouth and Medina area. The proposal involves constructing a new substation, expanding another substation, and connecting the two substations with a 115 kilovolt transmission line.
Xcel Energy and Great River Energy • 2013-11-07: Public hearing
more
11-948
Xcel Energy proposes to upgrade the Scott-County-Bluff Creek-Westgate 69 kV transmission line to 115 kV capacity near the cities of Chanhassen, Shorewood, Excelsior, Deephaven, Greenwood, Minnetonka and Eden Prairie,
Northern States Power dba Xcel Energy • 2016-11-15: Project built
more
12-126
High Prairie Pipeline, LLC proposes to construct an underground crude oil pipeline from McKenzie County, North Dakota, to Clearbook, Minnesota, and associated facilities. Approximately 65 miles of the project are proposed to be located in Minnesota and the project is proposed to cross the Red River near Bygland, Minnesota
High Prairie Pipeline, LLC • Upcoming: Application accepted
more
11-795
Xcel Energy proposes to replace approximately 4.6 miles of 115 kV transmission line between the Black Dog substation and Savage substation in Burnsville, Minnesota
Xcel Energy • 2014-05-15: Project built
more
11-471
Black Oak Wind, LLC, and Getty Wind, LLC, have jointly submitted a Certificate of Need Application for the proposed Black Oak Wind Farm and Getty Wind Project in Stearns County. The two projects are adjacent to one another and are located near Sauk Centre. The proposed Black Oak Wind Farm is a 42 MW project located in Ashley and Raymond townships . The Getty Wind Project is a 40 MW project located in Getty and Sauk Centre townships.
Geronimo Wind Energy, LLC; Getty Wind Company, LLC; Geronimo Wind Energy, LLCBlack Oak Wind. LLC • 2012-06-26: Public hearing
more
11-867
Great River Energy proposes to replace approximately 2.1 miles of existing 41.6 kV transmission line with 115 kV line and to update the existing Parkers Prairie substation in Otter Tail County, near the city of Parkers Prairie
Great River Energy • 2013-06-17: Project built
more
11-863
CWS application for a site permit for a 30 MW LWECS in Nobles County, south of Wilmont
Community Wind South, LLC • 2012-12-15: Project built
more
11-608
Ellerth Wind, LLC site permit application for the 98.9 MW for the Ellerth Windpark in Marshall County
TCI Renewables • 2011-12-07: Application accepted
more
11-831
Getty Wind Company, LLC, proposes to develop a 40 MW wind farm in Getty and Sauk Centre townships in Stearns County.
Getty Wind Company, LLC • 2013-01-28: Permit issued
more
11-915
Great River Energy and Minnesota Municipal Power Agency propose to construct a new 5.8-mile 115-kilovolt (kV) transmission line to serve Anoka Municipal Utilities� existing Enterprise Park Substation. The Project will also require modifications to Xcel Energy�s existing Crooked Lake Substation and the addition of a 115-kV transformer at AMU�s Enterprise Park Substation.
Great River Energy • 2014-12-02: Project built
more
11-152
Xcel Energy and Great River Energy (GRE) propose removing approximately eight miles of an existing GRE-owned 69 kilovolt (kV) overhead transmission line and constructing a new 115 kV overhead transmission in its place, constructing an additional eight-tenths of a mile of new 115 kV overhead transmission line, constructing a new substation, and modifying associated transmission facilities in the cities of Medina and Plymouth, Hennepin County, Minnesota
Xcel Energy • 2012-07-31: Scoping decision
more
11-318
Great River Energy and Minnesota Power propose to construct a new 3.8 mile 115 kV transmission line in Morrison County east of the city of Little Falls. The Project would also modify Minnesota Power's Little Falls Substation within the existing fenced area and expand Crow Wing Power's existing 34.5 kV Little Falls Substation by approximately 0.1 acres to accommodate the new 115 kV source.
Great River Energy; Minnesota Power • 2013-12-03: Docket closed
more
11-223
Xcel Energy Proposes to replace the existing 69 kV Orono Substation and construct approximately 0.6 miles of new 115 kV transmission line in the city of Orono in Hennepin County
Xcel Energy • 2013-12-04: Docket closed
more
11-307
Xcel Energy's proposed Black Dog Repowering Project to install natural gas-fired combined cycle electric generating technology to replace two existing units currently fueled by low-sulfur western coal
Xcel Energy • 2012-12-10: Docket closed
more
11-195
Proposed 44 megawatt Large Wind Energy Conversion System in Freeborn County
Minnesota Municipal Power Agency (MMPA); Shell Rock Wind Farm, LLC • 2013-11-12: Project not built
more
10-1026
Proposed 115 kV transmission line to be located in the northern part of the city of Sauk Rapids and the Townships of Minden and Sauk Rapids in Benton County, Minnesota
Xcel Energy • 2013-03-01: Project not built
more
10-1307
The Savanna HVTL Project is a proposal by Great River Energy and Minnesota Power for new switching station and rebiuld of an existing 69 kV line to a 115 kV HVTL in St. Louis and Carlton Counties
Great River Energy; Minnesota Power • Upcoming: Application accepted
more
10-438
Prairie Wind Energy, LLC is applying for a site permit and a certificate of need for an 100 MW LWECS near Parkers Prairie
Prairie Wind Energy, LLC • 2014-07-11: Docket closed
more
10-1238
Proposed 36 megawatt Large Wind Energy Conversion System in Faribault County
Big Blue Wind Farm, LLC; Exergy Development Group of Idaho, LLC • 2012-12-15: Project built
more
10-1240
40 MW Wind Farm in Stearns County proposed by Black Oak Wind, LLC, a wholly-owned subsidiary of Geronimo Wind Energy
Geronimo Wind Energy, LLC; Geronimo Wind Energy, LLCBlack Oak Wind. LLC • 2013-01-28: Permit issued
more
09-1390
Certificate of Need: Approximately 2.8 miles of new 115 kilovolt (kV) transmission line and upgrade approximately 20.2 miles of 69 kV transmission line to 115 kV capacity (approximately 23 miles total) near the cities of Glencoe, Plato, Norwood Young America and Waconia located southwest of the Twin Cities metro area
NSP, dba Xcel Energy • 2011-11-14: Certificate of Need issued
more
10-694
The Hiawatha Project was designed to address the distribution system problems that exist in south Minneapolis. The Project consists of two new 115/13.8 kV distribution substations equipped with smart substation technologies, two 115 kV transmission lines and two new taps of the existing Elliot Park Southtown 115 kV transmission line
Xcel Energy • 2012-02-10: Certificate of Need issued
more
10-798
Lake Country Wind Energy is applying for a site permit for an 41 MW LWECS in Kandiyohi and Meeker counties
Lake Country Wind Energy, LLC • 2013-06-03: Permit Amended
more
10-249
A route permit application to be reviewed under the alternate permitting process. The proposed project measures approximately 24.5 miles in length and primarily follows an existing 69 kV transmission corridor from a newly proposed East Glencoe Substation and ending at a transmission structure located approximately 1.25 miles west of the existing Augusta Substation
Xcel Energy
10-134
Prairie Rose is applying for a 115 kV HVTL in association with its application for the Prairie Rose Wind Project in Rock County
Geronimo Wind Energy, LLC • 2013-04-25: Docket closed
more
10-425
Geronimo Wind Energy applied for a site permit for 200 MW LWECS in Rock and Pipestone counties
Geronimo Wind Energy, LLC • 2012-12-24: Project built
more
10-249
Approximately 2.8 miles of new 115 kilovolt (kV) transmission line and upgrade approximately 20.2 miles of 69 kV transmission line to 115 kV capacity (approximately 23 miles total) near the cities of Glencoe, Plato, Norwood Young America and Waconia located southwest of the Twin Cities metro area
Xcel Energy • 2013-12-23: Project built
more
10-86
A new 7.25-mile 115 kV transmission line and substation in Park Rapids, Minnesota
Great River Energy • 2012-08-30: Project built
more
10-119
Proposed 44 MW wind farm with up to 29 wind turbines in Steele Co. in southeastern Minn
Minnesota Municipal Power Agency (MMPA); Minnesota Municipal Power Agency (MMPA) • 2011-10-27: Project built
more
10-49
Proposed 95 megawatt Large Wind Energy Conversion System in Stearns County
Geronimo Wind Energy, LLC; Paynesville Wind, LLC • 2015-07-07: Project not built
more
09-1448
Xcel Energy Application to construct a new 345 kV and a new 161kV transmission line from the Hampton Substation, through Rochester, to a proposed substation in La Crosse, Wis
Xcel Energy • 2016-09-12: Project built
more
09-1197
Proposed 301 MW Large Wind Energy Conversion System in Dodge and Mower Counties
Pleasant Valley Wind, LLC; Renewable Energy Systems Americas Inc. • 2015-10-30: Project built
more
09-1239
Proposed 205 Megawatt Large Wind Energy Conversion System (LWECS) in Jackson County.
Lakefield Wind Project, LLC • 2011-09-28: Project built
more
09-1315
Xcel Energy application to build an 18.3-mile, 161kV transmission line in Dodge, Olmsted and Mower counties
Northern States Power • 2012-03-09: Project built
more
08-1233
Proposed 78 Megawatt Large Wind Energy Conversion System in Goodhue County.
Goodhue Wind, LLC • 2011-08-23: Permit issued
more
08-1448
Buffalo Ridge Power Partners, LLC, Proposed 138 Megawatt Large Wind Energy Conversion System
Buffalo Ridge Power Partners, LLC • 2013-05-02: Docket closed
more
09-1056
Xcel Energy and GRE Application to construct a new 345 kV HVTL between the new Quarry Substation near St. Cloud and a proposed Bison Substation in North Dakota
Great River Energy; Xcel Energy • 2015-03-08: Project built
more
09-830
Site permit application for a 20 megawatt Large Wind Energy Conversion System (LWECS) in Stevens County, Minnesota
West Stevens Wind, LLC • 2015-07-07: Project not built
more
09-601
EcoEnergy proposes an 8-mile, 161kV HVTL and associated facilities in Bristol and Harmony Townships, Fillmore County to convey energy from the EcoHarmony West Wind Project
EcoEnergy; EcoHarmony West Wind, LLC • 2010-06-09: Permit issued
more
09-722
Sparks Energy, LLC, and Medin Renewable Energy, LLC, submitted an application for a site permit for a proposed 11 MW LWECS in Dakota County on July 21, 2009. On August 31, 2010, the applicants informed the Commission of the withdrawal of their application for the proposed Greenvale Wind Farm
Sparks Energy, LLC; Medin Renewable Energy, LLC • 2010-09-09: Docket closed
more
09-584
Site Permit Application for a proposed 201 megawatt (MW) Large Wind Energy Converison System in Nobles County.
enXco • 2010-12-21: Project built
more
09-512
NPUC proposes to construct four 230 kV transmission lines and two 230 kV substations to supply electric power to the Essar Steel Minnesota project
• 2010-08-03: Permit issued
more
09-178
New Ulm Public Utilities Commission Site Permit Application for a (10.5 Megawatt) Large Wind Energy Conversion System in Nicollet County, MN
New Ulm Public Utilities Commission • 2010-10-03: Docket closed
more
09-341
Juhl Wind submitted an LWECS Site Permit Application on behalf of Grant County Wind, LLC for a 20 MW wind farm approximately five miles west of Hoffman, MN
• 2010-08-09: Project built
more
09-360
Site permit application for a 31.5 megawatt Large Wind Energy Conversion System (LWECS) in Brown and Redwood Counties
Morgan Wind Acquisition Group • 2015-07-07: Project not built
more
09-553
Heartland Wind, LLC, LWECS Site Permit Application for a 150 MW Wind Farm in Jackson and Martin Counties
• 2011-02-01: Project built
more
09-38
The Hiawatha Project was designed to address the distribution system problems that exist in south Minneapolis. The Project consists of two new 115/13.8 kV distribution substations equipped with smart substation technologies, two 115 kV transmission lines and two new taps of the existing Elliot Park Southtown 115 kV transmission line
09-246
Xcel Energy and GRE Application to construct and operate a new 345 kV HVTL between the existing Monticello Substation and a new Quarry Substation west of St. Cloud
• 2011-12-20: Project built
more
08-973
Proposed 280 Megawatt Large Wind Energy Conversion System in Fillmore County.
EcoEnergy; EcoHarmony West Wind, LLC • 2015-07-07: Project not built
more
08-1494
Site Permit Application for a 30 Megawatt Large Wind Energy Conversion System in Lincoln County
Community Wind North, LLC • 2009-04-30: Permit issued
more
08-1449
Site Permit Application for the 60 Megawatt Lakes Wind Power Plant
Project Resources Corporation • 2011-09-06: Permit Amended more
08-1474
Proposed 345 kilovolt (kV) transmission line and associated facilities running from Brookings County, South Dakota, to Hampton, Minnesota
• 2015-03-26: Project built
more
08-1120
Application to alternative permitting process for a proposed 10-mile 161 kilovolt transmission line and associated facilities in Jackson County, Minnesota
Northstar Transmission, LLC • 2009-08-24: Permit issued
more
08-1134
Site Application for a 201 MW LWECS in Clay County
Noble Flat Hill Windpark I, LLC • 2016-06-06: Permit expired
more
08-956
Application to alternative permitting process for a proposed 115 kilovolt (kV) high voltage transmission line and new breaker station in Nicollet and Brown counties
Xcel Energy • 2010-09-15: Project built
more
08-573
Proposed 400 MW Large Wind Energy Conversion System in Freeborn County
• 2011-01-31: Project built
more
08-988
Route Permit Application for the Noble Flat Hill Windpark I associated 230 kV Transmission Line Project
Noble Flat Hill Windpark I, LLC • 2016-06-06: Permit expired
more
08-734
Application to Alternative Permitting Process for a proposed rebuild of a 69 kV transmission line to a 115 kV transmission line and two new substations near Mankato
Xcel Energy and Great River Energy • 2010-04-23: Docket closed
more
08-712
Application to alternative permitting process for a proposed 115 kilovolt (kV) high voltage transmission line and new breaker station in Cross and Crow Wing counties
Great River Energy; Minnesota Power • 2012-12-03: Docket closed
more
08-586
Application to the Minnesota Public Utilities for a Natural Gas Pipeline Permit and Partial Exemption of Pipeline Route Selection Procedures
Minnesota Power • 2008-12-29: Project built
more
08-690
The proposed project consists of two parts: 1) A 164 megawatt (MWe) increase in the electrical generating capacity of the Prairie Island Nuclear Generating Plant, and 2) A 35-cask expansion of the existing Independent Spent Fuel Storage Installation (ISFSI) at Prairie Island
Xcel Energy • 2009-12-18: Permit issued
more
08-208
20 MW wind project located west of Winthrop, Minnesota
08-185
The proposed project is a 71 megawatt (MWe) increase in the electrical generating capacity of the Monticello Nuclear Generating Plant
Xcel Energy • 2008-12-23: Permit issued
more
07-1626
Proposed 115 kV Transmission Line in Lincoln County
Xcel Energy • 2009-12-02: Project built
more
07-1407
Proposed 115 kV Transmission Line in Lyon County
• 2009-07-08: Project built
more
07-1366
Proposed Seven-mile 161 kV Transmission Line Project in Olmsted County
Rochester Public Utility • 2011-02-15: Project built
more
07-1365
Proposed 115 kV Transmission Project in Wright County
Xcel Energy • 2013-04-15: Project closed
more
07-1233
Propsed 21 Mile, 115 kV Transmission Line in Murray and Nobles Counties
Xcel Energy • 2009-06-30: Project built
more
07-1327
The proposed project is a 68-mile, 230 kilovolt (kV) transmission line from Bemidji to Grand Rapids, MN
Ottertail Power; Minnesota Power: Minnkota Power Cooperative • 2010-11-05: Permit issued
more
07-1102
In the Matter of Establishment of General Permit Standards for the Siting of Wind Generation Projects Less than 25 Megawatts
• 2008-01-11: Project closed
more
07-1073
20 MW Large Wind Energy Converstion System in Pope County
Glacial Ridge Wind Project, LLC • 2011-06-01: Permit Amended
more
07-318
31.5 MW LWECS in Brown and Cottonwood Counties
Comfrey Wind Energy, LLC
07-839
200.5 Megwatt Large Wind Energy Conversion System proposed by enXco Development Corporaton
enXco Development Corporation • 2008-12-31: Project built
more
07-361
Enbridge Pipelines L.L.C. proposes to construct 285 miles of 36-inch-diameter underground petroleum pipeline in the Minnesota counties of Kittson, Marshall, Pennington, Red Lake, Clearwater, Hubbard, Cass, Itasca, Aitkin, St. Louis and Carlton. The Alberta Clipper Pipeline will terminate at the Enbridge terminal facility in Superior, Wisconsin. The Southern Lights Diluent Project will be co-constructed with the Alberta Clipper Project from Superior, Wisconsin to Clearbrook, Minnesota. The Southern Lights Diluent Project will require construction of 188 miles of new 20-inch-diameter underground pipeline generally on or adjacent to the Enbridge right-of-way
Enbridge Energy • 2010-04-01: Project built
more
07-388
100 MW Large Wind Energy Conversion System in Jackson and Martin counties
PPM Energy • 2009-07-01: Project built
more
07-715
The proposed project consists of a single simple-cycle dual fuel (Natural gas & Fuel Oil) combustion turbine with a capacity of 175 MW
Great River Energy • 2008-04-23: Permit issued
more
07-472
4.5 mile-long natural gas pipeline in Martin County, Minnesota
• 2008-09-01: Docket closed
more
07-676
25 MW Large Wind Energy Conversion System (LWECS) in St. Louis County
Minnesota Power & Light • 2009-08-20: Docket closed
more
07-297
47.5 Megawatt Wind Energy Project in Todd and Otter Tail counties
• 2011-09-28: Permit Amended
more
06-1115
The Department of Commerce Energy Facility Permitting Unit prepares an Environmental Review for Certificate of Need proceedings before the Public Utilities Commission. This site is intended for users to be able to monitor the environmental review process.
Great River Energy; Xcel Energy • 2009-08-10: Docket closed
more
07-360
Enbridge Pipelines L.L.C. proposes to construct approximately 108 miles of 20-inch pipeline through the Minnesota counties of Kittson, Marshall, Pennington, Red Lake, Polk, and Clearwater. The proposed pipeline would terminate at the Enbridge existing tank farm and terminal facility near Clearbrook, MN
Enbridge Pipelines (Southern Lights) LLC; Enbridge Pipelines (Southern Lights) LLC • 2008-10-31: Project built
more
07-389
Up to a 49.9 MW Large Wind Energy Conversion System in Pipestone and Murray Counties
• 2009-01-01: Project built
more
06-1481
Nashwauk Public Utilities Commission Nashwauk - Blackberry Natural Gas Pipeline Project
Nashwauk Public Utilities Commission • 2008-04-16: Permit issued
more
07-76
MP will construct and own the new Pine River 115 kilovolt (kV) Substation and the new 115 kV transmission line between the Pequot Lakes, Pine River and Badoura substations (approximately 30 miles). GRE will construct and own the new 115 kV transmission line between the Badoura Substation and the Birch Lake Substation, and between the Badoura Substation and the Long Lake Substation (approximately 33 miles). Equipment modifications will be made at the Pequot Lakes, Badoura, Birch Lake and Long Lake substations to accommodate the new 115 kV transmission line.
• 2010-10-14: Project built
more
06-1677
Upgrade of an existing 69 kV transmission line to a 115/161 kV transmission line
NSP, dba Xcel Energy; Dairyland Power Cooperative • 2011-03-15: Project built
more
06-1445
18.9 MW Large Wind Energy Conversion System in Goodhue County
• 2011-02-25: Docket closed
more
06-1624
MP and GRE propose to construct approximately 14 miles of 115 kilovolt (kV) transmission line, a 115/69/46 kV substation located near the City of Tower and a 115 kV switching station
Great River Energy; Minnesota Power • 2011-10-08: Project built
more
06-154
Application for three 115 kV transmission lines in southwestern Minnesota
Xcel Energy • 2007-10-01: Project closed
more
06-1520
100.65 MW LWECS in Mower County
High Prairie Wind Farm II, LLC • 2007-12-01: Project built
more
06-1327
27 MW Large Wind Energy Conversion System in Pipestone and Murray Counties
• 2011-01-02: Project built
more
06-980
Application for transmission line Certificate of Need and Route permit
Great River Energy • 2010-02-01: Docket closed
more
06-931
Greater Minnesota Transmission, LLC (GMT) is proposing to install a 13.0 mile, 16-inch diameter high-pressure natural gas pipeline in central Dakota County. The proposed pipeline route originates at a new Northern Natural Gas (NNG) town border station (TBS) south of Coates and terminates at the proposed Cannon Falls Energy Center Power Plant on the northwest edge of Cannon Falls in Goodhue County
Greater Minnesota Transmission, LLC • 2006-10-27: Permit issued
more
06-677
41.6 kV to 115 kV Transmission Line Upgrade between the Appleton Substation in Swift County and the Canby Substation in Yellow Medicine County. The project also includes changes to the substations at Canby, Dawson, Louisburg Junction, and Appleton.
Otter Tail Power • 2009-06-16: Docket closed
more
06-459
Xcel Energy proposes to construct and operate a HVTL. The facility (i.e., Cannon Falls Transmission Project) for which the permit is requested is a 0.98 mile (5,170 ft) double circuit 115 kV/115 kV transmission line, 1.3 miles (6,945 ft) of two single circuit 115 kV transmission lines, a new substation (Colvill) and the expansion of the Cannon Falls Transmission Substation
Xcel Energy • 2008-06-01: Docket closed
more
06-426
Application for a Pipeline Routing Permit and Partial Exemption from Pipeline Route Selection Procedures
CenterPoint Energy • 2009-01-01: Project built
more
06-468
Substation and Transmission Line Upgrade in Hubbard County, MN
Great River Energy • 2007-06-05: Project built
more
06-91
98.9 MW LWECS in Mower County, MN
• 2008-05-01: Project built
more
06-157
Site Permit Application for a 100 MW Wind Energy Conversion System in Lincoln County
PPM Energy • 2007-12-01: Project built
more
05-2003
Proposed 295-mile between Clearbrook, MN in Clearwater County and the Flint Hills Resources refinery in Rosemont, MN in Dakota County
Minnesota Pipe Line Company • 2008-09-30: Project built
more
05-1707
205.5 Megawatt Large Wind Energy Conversion System
Fenton Power Partners, LLC • 2007-12-01: Project built
more
05-1275
A route permit application by seven regional utilities to build and upgrade lines to accommodate the Big Stone II Plant in South Dakota
Otter Tail Power • 2009-03-17: Permit issued
more
Natural Gas Pipeline for High Bridge Generating Plant Conversion Project
• 2008-07-01: Docket closed
more
05-867
Tower-Badoura 115 kV High Voltage Transmission Line
Great River Energy; Minnesota Power • 2006-08-01: Docket closed
more
05-1220
A 50 megawatt (MW) wind farm in Cottonwood County, Minn
Summit Wind, LLC; Jeffers Wind 20, LLC • 2012-05-10: Permit Amended
more
Xcel Energy new 115/115 kV transmission line from Summit-Loon Lake 115 kV tap to the Eastwood Substation
NSP, dba Xcel Energy • 2006-01-04: Permit issued
more
Proposal to construct a high voltage power line in the area of Baudette
• 2008-07-01: Docket closed
more
-668
Excelsior Energy, Inc. proposes to construct a ~1,200 MW Integrated Gasification Combined Cycle (IGCC) large electric power generating plant (LEPGP) on the Iron Range tax relief area
• 2010-03-12: Permit issued
more
105 Megawatt Large Wind Energy Conversion System in Pipestone and Murray Counties
enXco Development Corporation on behalf of Stoneray Power Partners, LLC • 2007-01-01: Project not built
more
GRE proposes to install an approximately 170 MW CT at the Camdridge Station, which currently has a 22 MW CT.
Great River Energy • 2008-05-01: Docket closed
more
The High Bridge power plant project consists of replacing the existing coal fired power plant with a natural gas combines cycle power plant
Xcel energy • 2008-06-01: Docket closed
more
Xcel Energy is asking the PUC to approve a dry-cask storage facility for spent nuclear fuel at its Monticello Generating Plant
• 2006-10-23: Permit issued
more
Amendment to the rules
• 2008-09-01: Docket closed
more
Northern States Power Company, d/b/a Xcel Energy, proposes to construct a 115 kV transmission line and associated facilities connecting the Buffalo Ridge Substation in Lincoln County, Minnesota and the White Substation in Brookings County, South Dakota. Xcel Energy also proposes to construct a new 115 kV Yankee Substation midway along the ne Buffalo Ridge to White transmission line.
Xcel Energy • 2007-12-18: Project built
more
This project consists of 3 high voltage transmission lines to connect the proposed Calpine Mankato Energy Center to the Xcel Energy Wilmarth substation
Xcel Energy • 2008-04-24: Docket closed
more
Invenergy Cannon Falls, LLC proposes to construct and operate a 357 MW, simple cycle LEPGP in Cannon Falls, Minnesota.
• 2008-05-01: Docket closed
more
Large wind energy conversion system up to 18.2 megawatts
G. McNeilus • 2004-09-16: Permit issued
more
New 345 kV and 115 kV High-Voltage Lines and Connecting Substation In Southwest Minnesota Related to Wind Energy Development.
Xcel Energy • 2005-06-22: Permit issued
more
Xcel Proposes to install a natural gas pipeline
Xcel Energy • 2008-06-01: Docket closed
more
GRE/Xcel Air Lake-Empire 115 kV Transmission Line and Vermillion River 115 kV Substation in Dakota County
Great River Energy; Xcel Energy • 2006-10-02: Docket closed
more
A 400 foot 115 kV transmission line in Rice County
• 2008-06-01: Project closed
more
A 1,200 foot, 400 psi Natural Gas pipeline in Rice County
Faribault Energy Park, LLC • 2008-06-01: Project closed
more
Minor Alterations to Transmission Lines or Large Electric Power Generating Plants
Site Permit Application for two 320 MW natural gas fueled combustion turbines
Calpine • 2007-08-06: Project Closed
more
Route Permit Application for a natural gas pipeline to supply new power plant turbines
Calpine • 2007-08-06: Project closed
more
The CON application for the addition of two simple cycle natural gas fueled combustion turbine generators to the Blue Lake Generating Plant in Shakopee, Minnesota
Xcel Energy • 2004-06-17: Project Closed
more
The Site Permit application for the addition of two simple cycle natural gas fueled combustion turbine generators to the Blue Lake Generating Plant in Shakopee, Minnesota
Xcel Energy • 2008-06-01: Project closed
more
13-258
Site Permit Application for a 100 MW Wind Energy Conversion System in Martin & Jackson Counties
Trimont Wind I, LLC • 2004-10-21: Permit Amended
more
Xcel's Request to Relocate Portions of the 115 kV Transmission Line at the Sherco Power Plant near Becker, Minnesota
Xcel Energy • 2004-02-23: Project Closed
more
The proposed Rushford plant would consist of three 2000 kilowatt (kW), fuel-oil engines generating a total of 6-megawatts (MW) of electricity.
City of Rushford • 2003-12-10: Project Closed
more
NGPP Minnesota Biomass, LLC proposes to build, own and operate a closed loop biomass-fueled 38.5 MW power plant.
NGPP Minnesota Biomass, LLC • 2003-12-29: Project Closed
more
New 115 kV Circuit Between Parkers Lake and Elm Creek Substations in Plymouth and Maple Grove in Northwest Twin Cities Metropolitan Area. Approximately 14 miles of line
Great River Energy • 2007-08-06: Project closed
more
A utility seeking a route permit for a transmission line that meets certain qualifications may elect to seek approval from a local unit of government. If local review is elected, a permit from the Public Utilities Commission is not required. This docket contains local review projects
A new 161 kV transmission line between Lakefield Junction and Fox Lake Substations in Southwest Minnesota
Xcel Energy • 2007-12-01: Docket closed
more
Information Booklet for exempt pipeline placement in Brown County.
Public Utilities Commission of New Ulm • 2004-06-00: Project closed
more
Pipeline Routing Permit and Partial Exemption for Six-mile pipeline from the Northern Natural Pipeline Near Brewster to the new MnSP Processing Plant
Great Plains Natural Gas • 2004-06-00: Project closed
more
Faribault Energy Park, LLC proposes to build, own and operate a 250 MW combined-cycle, natural gas fired, LEPGP
Faribault Energy Park, LLC • 2004-06-22: Project closed
more
enXco, Inc., has proposed a 24 MW LWECS and 16 turbines development in Murray County
enXco • 2002-12-19: Project closed
more
Amendments to the environmental review rules pertaining to environmental review required at the certificate of need stage
Not Applicable • 2006-04-24: Project closed
more
The proposed Waterville plant is a 46-megawatt, combined-cycle , natural gas electric generating plant near Waterville, Minnesota.
Simon Entergy I, LLC • 2002-09-19: EAW negative declaration
more
Two 115 kV transmission lines to connect the Otter Tail Power Solway generating plant to an existing 115 kV transmission line
Otter Tail Power • 2002-09-12: Project closed
more
Upgrade of St. Bonifacius peaking station from 50 to 74MW
Great River Energy • 2002-08-15: Permit issued
more
Seeks partial exemption from procedures for 89 miles of new 12 and 16 inch pipeline
Hutchinson Utilities Commission • 2003-12-18: Project closed
more
Proposed 49 MW natural gas and fuel oil facility in St. Paul
Prairie Gen • 2002-06-20: EAW negative declaration
more
The EQB is to monitor the federal high-level radioactive waste program under the Nuclear Waste Policy Act, United States Code, title 42, sections 10101 to 10226 and to prepare an annual report
NA • 2010-01-01: Project closed
more
Annual Hearing for the Power Plant Siting and Transmission Line Routing Program
NA
Boise Cascade Corporation of International Falls
Boise Cascade • 2002-04-18: EAW negative declaration
more
Proposed 44 MW natural gas power plant in Beltrami County
Otter Tail Power • 2001-12-20: EAW negative declaration
more
A minor alteration raising the operating voltage of the +- 400 kV transmission line to +- 410 kV
Great River Energy • 2001-11-15: Minor alteration granted
more
Pipeline routing application
Enbridge Energy • 2001-12-20: Permit issued
more
Route alteration to accommodate TH 610
Great River Energy • 2001-09-20: Minor alteration granted
more
Application for exemption from the Power Plant Siting Act by Fibrominn LLC and the City of Benson for a 55 megawatt electric generating plant using poultry litter as a fuel.
Fribrominn LLC and the City of Benson • 2001-10-18: Exemption granted
more
Amendment of power plant siting rules to respond to changes in state law
Not Applicable • 2006-04-24: Project closed
more
87 Enron Wind 1.5 MW wind turbines
Navitas Energy, LLC • 2003-02-20: Project closed
more
The project will replace and upgrade a 30-mile 115 kV electric transmission line with a 230 kV line between Willmar and Paynesville MN.
Xcel Energy, Great River Energy, and Willmar Municipal Utility • 2001-06-21: Exemption granted
more
61 Enron Wind 1.5 MW wind turbines in Murray Co.
Chanarambie Power Partners, LLC • 2003-12-01: Project built
more
Rules for the Siting of Large Wind Energy Conversion Systems, Minnesota Rules Chapter 4401
Not Applicable • 2006-04-24: Project closed
more
A 28.5 MW, waste wood (natural gas backup) facility
Saint Paul Cogeneration • 2001-03-15: EAW negative declaration
more
A 49.9 MW natural gas facility located in Rochester, Minnesota
Rochester Public Utility • 2000-12-21: EAW negative declaration
more
An exemption request by HUC for a 230/115 kV HVTL project in Mcleod County
Hutchinson Utilites Commission • 2001-02-15: Exemption granted
more
Exemption relating to the 26.5 MW fuel oil facility located in Brown County, Minnesota
New Ulm Public Utilities • 2000-10-19: Exemption granted
more
Exemption relating to the Black Dog facility
NSP • 2000-07-20: Exemption granted
more
49 MW natural gas-fired electric generating station proposed by Minnesota Municipal Power Agency and the City of Chaska
Minnesota Municipal Power Agency and the City of Chaska • 2000-04-20: EAW negative declaration
more
1-99
An exemption request by GRE for a 345 kV HVTL project located in Martin County, Minnesota
Great River Energy • 1999-11-18: Exemption granted
more
1-99
A 434 MW natural gas facility located in Mower County, Minnesota
Great River Energy • 2000-04-00: Permit issued
more
1-99
An exemption request by MP for a 345 kV HVTL project located in St. Louis County, Minnesota
Minnesota Power & Light • 2001-03-15: Exemption granted
more
1-1998
A 12.75 inch, 1 mile natural gas pipeline located in Martin County, Minnesota
Lakefield Junction LLP • 1999-11-00: Permit issued
more
1-99
A 550 MW natural gas facility located in Martin County, Minnesota
Tanaska and NRG • 1999-11-00: Permit issued
more
NSP proposed SE metro double circuit 115 kV HVTL, Red Rock to S. St. Paul to Rogers Lake to Wilson
NSP • 1999-11-18: EAW negative declaration
more
1-99
A 345 kV HVTL tap to connect the Pleasant Valley station facility to the Bryon-Adams 345 kV HVTL in Mower County, Minnesota
Great River Energy • 2000-04-20: Permit issued
more
Approximately 13 miles of 161 kV HVTL in Le Sueur, Rice and Waseca Counties, Minnesota
NSP • 1999-08-19: EAW negative declaration
more
2-1997
15 Micon M1-500-750/175 kW turbines
NAE/Lakota Ridge, LLC • 1998-09-30: Application amended
more
-98
A 4.5 inch, 9.5 mile natiral gas pipeline in the cities of Perham, Battle Lake and Henning in Otter Tail County, Minnesota
NSP • 1998-09-30: Permit issued
more
1-1998
A 8.625 inch, 8 mile natural gas pipeline in Carlton County, Minnesota
UCU • 1998-09-30: Permit issued
more
1-1998
138 Zond Z50 750 kW
Northern States Power/ Lake Benton Power Partners II, LLC • 1998-05-21: Permit issued
more
1-1998
A 36 inch, 68.6 mile crude oil pipeline in Kittson, Marshall, Pennington, Redlake and Polk Counties
Lakehead Pipeline • 1998-09-00: Project closed
more
An exemption request by OTP associated with the Inman Substation (230kV) located in Otter Tail County
Otter Tail Power • 1997-03-20: Exemption granted
more
A 115 kV HVTL from Oslo to Thief River Falls (approximately 56 miles) in Marshall and Pennington Counties, Minnesota proposed by OTP and MPC
Otter Tail Power; Minnkota Power Cooperative • 1998-01-00: EAW negative declaration
more
1-1998
A 16 inch, 2 mile natural gas pipeline extension in Dakota County, Minnesota
NSP • 1998-03-19: Permit issued
more
1-1997
17 Vestas V-44 600kW turbines
Woodstock Wind Farms, LLC • 1998-09-30: Application amended
more
-1
A minor alteration request by UPA to move towers for highway
United Power Association • 1997-06-00: Minor alteration granted
more
1-1997
18 Vestas V-47 660kW turbines
NAE/Shaokatan Hills, LLC • 1998-09-30: Application amended
more
1-1990
A 6.58 inch, 7 mile natural gas pipeline in Scott County, Minnesota
WGU • 1990-05-17: Permit issued
more
-4
38 mile 230 kV transmission line connecting the Chisago Substation with the Apple River Substation
Northern States Power • 2000-10-00: Application withdrawn
more
OTP, CPA and MPC propose a 115 kV HVTL from Alexandria to Henning (approximately 43 miles) in Douglas and Otter Tail Counties, Minnesota
OTP, CPA & MPC • 1977-03-00: EAW negative declaration
more
An exemption request by NSP for the Rock Creek 230/69 kV substation located in Pine County, Minnesota
NSP • 1996-10-02: Exemption granted
more
NSP proposes a 115 kV HVTL from Hastings to Rosemount in Dakota County, Minnesot
NSP • 1996-07-00: Project closed
more
1-1996
A 8.625 inch, 18 mile natural gas pipline in Lyon County, Minnesota
MCP • 1996-06-20: Permit issued
more
An exemption request by MP for the Mud Lake 23/115 kV substation located in Crow Wing County, Minnesota
Minnesota Power & Light • 1995-08-17: Exemption granted
more
An exemption request by NSP for a 345 HVTL located at Elm Creek in Hennepin County, Minnesota
NSP • 1995-07-20: Exemption granted
more
1-1995
A 10.75 inch, 1 mile natural gas pipeline in Washington County, Minnesota
UED & PNG • 1995-06-15: Permit issued
more
1-95
143 Zond Z50 750 kW Wind Turbines
Northern States Power • 1997-06-19: Application amended
more
-1
A 245 MW natural gas facility located in Washington County, Minnesota
LS Power Corporation • 1994-10-00: Permit issued
more
SPU proposes a 115 kV HVTL (approximately 0.25 miles) and substation in Scott County, Minnesota
Shakopee Public Utilities • 1994-08-18: EAW negative declaration
more
SMMPA proposes a 115 kV HVTL (approximately 0.5 miles) in Kalimar Township, Dodge County, Minnesota
Southern Minnesota Municipal Power Agency • 1993-10-00: Project closed
more
1-1992
A 0.5 inch, 8 mile petroleum products pipeline in Anoka and Ramsey Counties, Minnesota
WPLC • 1992-08-20: Permit issued
more
A 49.7 MW natural gas facility
Hutchinson Public Utilities • 1992-05-00: EAW negative declaration
more
-1
A minor alteration request by UPA for a substation expansion in Benton County, Minnesota
United Power Association • 1992-01-00: Exemption granted
more
1-1991
A 16 inch, 7.5 mile and a 12 inch, 3,5 mile natural gas pipeline through Washington, Anoka and Ramsey Counties, Minnesota
NSP • 1992-06-18: Permit issued
more
1-1991
A 8.635 inch, 36 mile natural gas pipeline through Hubbard, Otter Tail and Wadena Counties, Minnesota
UUI & NMU • 1992-01-16: Permit issued
more
1-1991
A 6.625 inch, 2.6 mile natural gas pipeline in Lyon County, Minnesota
Great Plains Natural Gas • 1991-07-18: Permit issued
more
A minor alteration request by NSP to upgrade the kV 500 HVTL
NSP • 1991-06-01: Project closed
more
1-1990
A 4.5 inch, 18 mile natural gas pipeline in Lincoln County, Minnesota
PNG • 1991-04-18: Permit issued
more
An exemption request by MP for the Hilltop 230 kV substation located in St. Louis County, Minnesota
Minnesota Power & Light • 1991-02-21: Exemption granted
more
-1
A 50 - 80 MW natural gas facility located in Dakota County, Minnesota
Oxbow Power Corp. and Biosyn Chemical Corp. • 1989-05-25: Permit issued
more
A 16 inch, 163-mile crude oil pipeline through Clearwater, Hubbard, Wadena, Todd, Benton, Morrison, Sherburne, Anoka, Washington and Dakota Counties, Minnesota
MPLC • 1989-06-22: Permit issued
more
-1
Minor alteration involving a change in the boundary of the Sherco facility
NSP • 1985-08-15: Minor alteration granted
more
-1
A minor alteration request by UPA for guy wire and anchor for certain structures
United Power Association • 1984-02-00: Minor alteration granted
more
-3
A change in Apiary notice regarding herbicide application
MP&L, UPA • 1983-11-00: Minor alteration granted
more
A 161 HVTL (approximately 39 miles) from Austin to Hayward in Mower and Freeborn Counties
Southern Minnesota Municipal Power Agency • 1983-09-00: EAW negative declaration
more
-1
An exemption request by NSP/SMMPA for the Byron 345 kV substation located in Olmsted County, Minnesota
NSP • 1983-03-31: Exemption granted
more
A minor alteration request by NSP and UPA for herbicide treatment of a 500 kV HVTL
NSP & UPA • 1982-08-00: Minor alteration granted
more
-1
An exemption request by CPA for the 230 kV upgrade/realign at the Hubbard substation located in St. Louis County, Minnesota
Cooperative Power Association • 1980-07-17: Exemption granted
more
-5
An exemption request by NSP for the Eden Prairie substation located in Hennepin County, Minnesota
NSP • 1980-02-21: Exemption granted
more
-2
An exemption request by MP&L for the upgrading of 3 miles of 115 kV HVTL to 230 kV from Boswell to Bassbrook in Itasca County, Minnesota
Minnesota Power & Light • 1979-10-23: Exemption granted
more
-2
An exemption request by MP&L for the 230 kV Wing River substation located in Wadena County, Minnesota
Minnesota Power & Light • 1979-10-18: Exemption granted
more
-1
An exemption request by CM for the 230 kV Moorhead substation located in Clay County, Minnesota
City of Moorhead • 1979-03-29: Exemption granted
more
-4
An exemption request by NSP for the Minnesota Valley substation located in Chippewa County, Minnesota
NSP • 1979-03-19: Exemption granted
more
-3
17 miles of 345 kV HVTL connecting the Sherburne Co. Sub to the Benton Co. Sub
NSP • 1981-02-00: Permit issued
more
-2
A one mile portion within Minnesota of an NSP 345 kV HVTL extending from Priarie Island to Eau Claire, Wisconsin
NSP • 1981-07-00: Application withdrawn
more
-1
A proposed 230 kV HVTL by Untied Power extending from Benton County to the city of Milaca in Minnesota
United Power Association • 1980-02-00: Permit issued
more
-1
A minor alteration request by CU for tower realignment in Le Sueur County, Minnesota
Cooperative Power Association; United Power Association • 1988-04-00: Minor alteration granted
more
-2
A proposed 230 kV HVTL by MP & L extending from the Clay Boswell facility to Blackberry, Minnesota
Minnesota Power & Light • 1979-02-00: Permit issued
more
-1
A minor alteration request by MP&L for tower realignment in Toivola Township, St. Louis County, Minnesota
Minnesota Power & Light • 1977-07-00: Minor alteration granted
more
-1
A minor alteration request by NSP for a tower realignment near Warroad in Roseau County, Minnesota
NSP • 1977-07-00: Minor alteration granted
more
An exemption request by NSP for the relocation of a 230 kV HVTL in conjunction with the double circuit 345 kV HVTL(MP&L-TR-1) in Washington County, Minnesota
Northern States Power • 1977-05-00: Exemption granted
more
An exemption request by UPA for the Bunker Lake substation located in Anoka County, Minnesota
United Power Association • 1977-05-00: Exemption granted
more
-2
A proposed 345 kV HVTL by CU extending from Dickinson to Wilmarth, Minnesota
Cooperative Power Association; United Power Association • 1977-04-00: Permit issued
more
An exemption request by NSP for the Panther substation located in Renville County, Minnesota
Northern States Power • 1977-04-00: Exemption granted
more
A minor alteration request by MP&L for tower realignment in Carlton and Pine Counties, Minnesota
Minnesota Power & Light • 1977-03-00: Minor alteration granted
more
-1
A 200 mile 500 kV HVTL by NSP extending from Forbes Substation near Forbes MN to the Manitoba border near Warroad MN
Northern States Power • 1977-02-00: Permit issued
more
A proposed 500 kv HVTL by MP&L extending from Kettle River to Forbes, Minnesota
Minnesota Power & Light • 1977-05-00: Permit issued
more
-2
A 800 MW coal facility located in St. Louis County, Minnesota
Minnesota Power & Light • 1976-10-00: Permit issued
more
-1
A proposed 500 kV HVTL by MP&L extending from Kettle River to Chisago County and a 345 kV HVTL extending from Chisago County to Grant Township, Minnesota
Minnesota Power & Light • 1976-08-00: Permit issued
more
An exemption request by MPC for the Warroad substation located in Roseau County, Minnesota
Minnkota Power Cooperative • 1976-08-00: Exemption granted
more
-1
A proposed 400 kV DC HVTL and a 345 kV HVTL by CU extending from the North Dakota border to the Dickinson converter station to the Coon Creek substation
Cooperative Power Association; United Power Association • 1976-06-03: Permit issued
more
-1
A 500 MW coal facility located in Itasca County, Minnesota
Minnesota Power & Light • 1976-03-08: Permit issued
more
-1
A 800 MW coal facility located in Sherburne County, Minnesota
NSP • 1975-11-10: Permit issued
more
An exemption request by NSP for the Benton County Substation 230/115 kV
Northern States Power • 1975-05-13: Exemption granted
more
An exemption request by UPA for the Blaine Substation (230/69 kV) located in Anoka County, Minnesota
United Power Association • 1975-05-13: Exemption granted
more
An exemption request by UPA to relocate a HVTL crossing the Mississippi River near Monticello in Wright and Sherburne Counties, Minnesota
United Power Association • 1975-02-25: Exemption granted
more
An exemption request by NSP for the Kohlman Lake substation located in Ramsey County, Minnesota
Northern States Power • 1975-02-21: Exemption granted
more
-1
A 105 mile 230 kV HVTL from the Manitoba borderto an area near Warroad then to Little Fork in Minnesota
Minnesota Power & Light • 1974-11-11: Permit issued
more
An exemption request by NSP for expansion of the Wilmarth substation and a 345 kV HVTL connection located in Blue Earth County, Minnesota
Northern States Power • 1974-11-00: Exemption granted
more