This webpage contains information and documents related to the permitting of this project by the Minnesota Public Utilities Commission. Every project before the Commission has an electronic docket (eDocket), a file folder for all of the project's documents.

Documents for this project are listed below in the File Register, most recent documents first. To view the eDockets record for this project, click on the eDockets link below, or click on the eDockets tab in the File Register. A subset of the record, including key documents with descriptions, is available by clicking on the Energy Facilities tab in the File Register.

For more information about participating in the permitting of this project, click on the How to Participate tab, or contact the environmental review manager or public advisor listed below.

Project Docket

Docket No E002/GS-15-834
Project name Black Dog Unit 6 Project
Applicant Xcel Energy
Description Xcel Energy proposes to construct a 215 MW peaking natural gas-fired combustion turbine at its existing Black Dog Generating Plant in the city of Burnsville in Dakota County
Subjects Environmental policy; Power plants
Location Dakota County; Dakota County -- Burnsville City
Docket created: October 29, 2015
Contacts: Bill Storm, 651-539-1844, Environmental Review Manager.
Status:
 
12-10-2015
Application accepted
 
01-28-2016
Public meeting
 
02-23-2016
Scoping decision
 
05-25-2016
Environmental document available
 
06-16-2016
Public hearing
 
09-26-2016
Permit issued
 
Project built
 
Docket closed
eDockets 15-834
Mailing list Contact the Public Utilies Commission at docketing.puc@state.mn.us or 651-201-2204 or 1-800-657-3782 to sign up.
Project Summary

Xcel Energy proposes to construct a 215 MW natural gas-fired combustion turbine unit at its existing Black Dog Generating Plant in the city of Burnsville in Dakota County, Minnesota. The applicant's stated purpose is to ensure reliable 115 kV peaking power supply to the Twin Cities metropolitan area utilizing existing transmission infrastructure.

The proposed project will use natural gas as a fuel source. Any needed improvements to gas pipeline(s) and associated approvals will be the responsibility of the gas supplier and are not a part of this project. The applicant proposes to utilize existing infrastructure to the greatest extent possible, including using an existing powerhouse building to house the unit.

Construction is anticipated to begin in June 2016, with a projected date of commercial operation beginning in March 2018. 

Primary Documents
DateDocumentDescription
05/25/16 Environmental Assessment for the Black Dog Unit 6 Project
The Environmental Assessment is a written document developed and prepared by EERA that contains an overview of the resources and potential human and environmental impacts and mitigation measures associated with the proposed project
10/15/15 Site Permit Application for the Black Dog 6 Project
Xcel Energy filed an application for a site permit with the Minnesota Public Utilities Commission to construct a 215 MW natural gas-fired combustion turbine unit at its existing Black Dog Generating Plant in the city of Burnsville in Dakota County, Minnesota
File Register
Energy Facilities eDockets
DateDocumentDescription
08/15/16 Comments on the Applicant's Proposed Findings and Conclusions | document details
EERA comments and recommendations to the Minnesota Public Utilities Commission regarding the Applicant's proposed findings and conclusions for the Black Dog Unit Six project
06/03/16 Notice of Public Hearing for the Black Dog Unit 6 Project | document details
A public hearing will be held on June 16, 2016, at 6:00 p.m. at Burnsville City Hall. Comments on the proposed project will be accepted through June 30, 2016
05/25/16 Notice of Environmental Assessment for the Black Dog Unit 6 Project | document details
EERA staff issued the Environmental Assessment for the Black Dog Unit 6 Project located in Dakota County, Minnesota
05/25/16 Environmental Assessment for the Black Dog Unit 6 Project
The Environmental Assessment is a written document developed and prepared by EERA that contains an overview of the resources and potential human and environmental impacts and mitigation measures associated with the proposed project
02/25/16 Notice of Environmental Assessment Scoping Decision for the Black Dog Unit 6 Project | document details
The Deputy Commissioner of Commerce has issued a decision on the scope of the environmental assessment to be prepared for the Black Dog Unit 6 Project in Burnsville, Minnesota. The EA is scheduled to be issued in May 2016
02/23/16 Scoping Decision for the Black Dog Unit 6 Project | document details
The scoping decision is a written document issued by the Deputy Commissioner of Commerce that outlines the issues and alternatives to be analyzed as part of the environmental assessment for the Black Dog Unit 6 Project
02/18/16 Public Comments Received on the Scope of the Environmental Assessment
Public comments received by EERA staff regarding the Black Dog Unit 6 Project by the February 11, 2016, comment deadline
01/07/16 Notice: Public Information and Environmental Review Scoping Meeting, Xcel Energy Black Dog Unit 6 | document details
The PUC and DOC EERA will conduct a public information and environmental review scoping meeting on January 28, 2016, at the Burnsville City Hall. Comments will be accepted until February 11, 2016
01/07/16 DRAFT SCOPING DOCUMENT: Xcel Energy Black Dog Unit 6 LEPGP | document details
On October 15, 2015, Xcel Energy submitted a Large Electric Power Generating Plant site permit application to the PUC for the proposed 215 MW natural gas-fired combustion turbine (Unit 6) at its existing Black Dog Generating Plant in Burnsville, Dakota County, Minnesota
11/06/15 Comments and Recommendations on the Completeness of the Black Dog Unit 6 Site Permit Application | document details
EERA recommends that the Minnesota Public Utilities Commission find the site permit application for the Black Dog Unit 6 Project as substantially complete.
10/23/15 Notice of Comment Period on Application Completeness | document details
The Minnesota Public Utilities Commission is soliciting comments on the completeness of the Black Dog 6 Project Site Permit Application through November 6, 2015
10/15/15 Site Permit Application for the Black Dog 6 Project
Xcel Energy filed an application for a site permit with the Minnesota Public Utilities Commission to construct a 215 MW natural gas-fired combustion turbine unit at its existing Black Dog Generating Plant in the city of Burnsville in Dakota County, Minnesota
09/16/15 Notice of Intent to File a Site Permit Application | document details
Xcel Energy filed a Notice of Intent to file a site permit application under the alternative review process for the Black Dog 6 Project