This webpage contains information and documents related to the permitting of this project by the Minnesota Public Utilities Commission. Every project before the Commission has an electronic docket (eDocket), a file folder for all of the project's documents.

Documents for this project are listed below in the File Register, most recent documents first. To view the eDockets record for this project, click on the eDockets link below, or click on the eDockets tab in the File Register. A subset of the record, including key documents with descriptions, is available by clicking on the Energy Facilities tab in the File Register.

For more information about participating in the permitting of this project, click on the How to Participate tab, or contact the environmental review manager or public advisor listed below.

Project Docket

Docket No PPL-15-137
Project name Line 3 Pipeline Replacement
Applicant Enbridge, LLP
Description Enbridge Energy proposes to replace 337 miles of the Line 3 Pipeline in Minnesota. Line 3 originates in Canada, continues through North Dakota, enters Minnesota in Kittson County, and terminates in Superior, Wiscsonsin.
Subjects Environmental policy; Pipelines
Location Aitkin County; Carlton County; Cass County; Clearwater County; Crow Wing County; Hubbard County; Kittson County; Marshall County; Pennington County; Polk County; Red Lake County; Wadena County
Docket created: February 23, 2015
Contacts: Jamie MacAlister, (651) 539-1775, Environmental Review Manager.
Status:
 
07-1-2015
Application accepted
 
04-25-2016
Public meeting
 
Scoping decision
 
Draft EIS available
 
Final EIS available
 
Public hearing
 
Permit issued
 
Project built
 
Docket closed
eDockets 15-137
Mailing list Contact the Public Utilies Commission at docketing.puc@state.mn.us or 651-201-2204 or 1-800-657-3782 to sign up.
Project Summary

Enbridge Energy, Limited Partnership (Enbridge) is proposing the Line 3 Replacement project in order to address safety and integrity issues associated with the existing Line 3 pipeline. The pipeline replacement is proposed to follow existing Line 3 from the Minnesota-North Dakota border to Clearbrook and then follow the same route proposed for the Sandpiper pipeline from Clearbrook to the Minnesota-Wisconsin border. The Line 3 route is approximately 337 miles long in Minnesota. The project also includes upgrades to existing pump stations at Clearbrook, Donaldson, Plummer, and Viking, and construction of new pump stations at Backus, Cromwell, Palisade, and Two Inlets. The proposed project is located in Kittson, Marshall, Pennington, Red Lake, Polk, Clearwater, Hubbard, Wadena, Cass, Crow Wing, Aitkin, and Carlton counties.

Enbridge's proposed project requires two approvals from the Minnesota Public Utilities Commission (Commission) before it may be constructed - a certificate of need (CN) and a route permit. As part of the process, the Commission has asked the Minnesota Department of Commerce (Commerce), in coordination with the Minnesota Department of Natural Resources and the Minnesota Pollution Control Agency, to prepare an Environmental Impact Statement (EIS) for this project.

Additional information on the CN process can be found on the eDockets website: CN-14-916

Primary Documents
DateDocumentDescription
04/25/16 Meeting Materials for Public Scoping Meetings
Includes handouts, posters, maps, and other materials that will be presented at the public meetings for EIS scoping being held from April 25 to May 11, 2016
04/11/16 Line 3 Replacement Project Scoping EAW
The Scoping Environmental Assessment Worksheet (EAW) for the Line 3 Replacement Project describes the applicant’s proposed alternative in detail and summarizes significant environmental impacts of the proposed project. All projects requiring an EIS must have an EAW filed with the project’s responsible governmental unit (RGU)
04/11/16 Draft Scoping Decision Document (DSDD) for Line 3 Replacement Project | document details
The Department of Commerce has issued the Draft Scoping Decision Document (DSDD) for the Line 3 Replacement Project. The purpose of this document is to identify impacts of the proposed project, alternatives to the proposed project, and impacts of any alternatives to be addressed in the EIS. In addition to identifying impacts and alternatives, this document also provides a proposed outline for the EIS and a tentative schedule for the environmental review process. This DSDD is a companion document to the Scoping EAW
04/11/16 Notice of Availability of Scoping EAW and Draft Scope for Sandpiper Pipeline and Line 3 Replacement Projects and Schedule for EIS Scoping Meetings | document details
The Department of Commerce has issued the scoping environmental assessment worksheet (EAW) and the draft scoping decision document for the Sandpiper Pipeline and Line 3 Replacement Projects. Public information and scoping meetings will be held April 25 through May 11, 2016, in multiple Minnesota communities. Comments on the scope of the environmental impact statements that will be prepared for the projects will be accepted through May 26, 2016
File Register
DateDocumentDescription
04/25/16 Meeting Materials for Public Scoping Meetings
Includes handouts, posters, maps, and other materials that will be presented at the public meetings for EIS scoping being held from April 25 to May 11, 2016
04/11/16 Line 3 Replacement Project Scoping EAW
The Scoping Environmental Assessment Worksheet (EAW) for the Line 3 Replacement Project describes the applicant’s proposed alternative in detail and summarizes significant environmental impacts of the proposed project. All projects requiring an EIS must have an EAW filed with the project’s responsible governmental unit (RGU)
04/11/16 Notice of Availability of Scoping EAW and Draft Scope for Sandpiper Pipeline and Line 3 Replacement Projects and Schedule for EIS Scoping Meetings | document details
The Department of Commerce has issued the scoping environmental assessment worksheet (EAW) and the draft scoping decision document for the Sandpiper Pipeline and Line 3 Replacement Projects. Public information and scoping meetings will be held April 25 through May 11, 2016, in multiple Minnesota communities. Comments on the scope of the environmental impact statements that will be prepared for the projects will be accepted through May 26, 2016
04/11/16 Draft Scoping Decision Document (DSDD) for Line 3 Replacement Project | document details
The Department of Commerce has issued the Draft Scoping Decision Document (DSDD) for the Line 3 Replacement Project. The purpose of this document is to identify impacts of the proposed project, alternatives to the proposed project, and impacts of any alternatives to be addressed in the EIS. In addition to identifying impacts and alternatives, this document also provides a proposed outline for the EIS and a tentative schedule for the environmental review process. This DSDD is a companion document to the Scoping EAW
02/01/16 Commission Order Joining Need and Routing Dockets | document details
Order from the Minnesota Public Utilities Commission authorizing the Department of Commerce to prepare a combined environmental impact statement (EIS) for Enbridge's Line 3 certificate of need and route permit applications. The order authorizes the Department to administer the EIS process in consultation with the Commission’s Executive Secretary and requests that the Department submit to the Commission, for its approval, a proposed list of alternative routes or route segments to include in the EIS
10/06/15 Written and Oral Comments on the Scope of the Comparative Environmental Analysis (CEA) for Line 3 Pipeline
Comments received by September 30, 2015
08/24/15 Line 3 Pipeline Public Information and Scoping Meetings_Handouts
The handouts from the Scoping Meetings are available here for your convenience, including comments forms. The comment period is open through September 30, 2015
08/17/15 Notice of Line 3 Pipeline Additional Public Information and Scoping Meetings | document details
The PUC and EERA will conduct a public information and environmental review scoping meeting at the East Lake Community Center south of McGregor, MN, on August 27. Comments will be accepted through September 30, 2015
08/12/15 Commission Order Accepting Route Permit Application of Enbridge for Line 3 Pipeline Project | document details
An order from the Minnesota Public Utilities Commision accepting the application of Enbridge for a pipeline routing permit as substantially complete and authorizing the Department of Commerce to prepare an analysis of alternative route proposals in accordance with Minnesota Rules, Chapter 7852
07/23/15 Notice of Line 3 Pipeline Public Information and Scoping Meetings | document details
The PUC and EERA will conduct public information and environmental review scoping meetings across northern Minnesota on August 11-13 (Hallock, Newfolden, Thief River Falls, Plummer and Gully); August 17-19 (Clearbrook, Bagley and Park Rapids); and August 24-26 (Pine River, McGregor and Carlton). Comments will be accepted through September 30, 2015
05/13/15 Comments and Recommendations on Line 3 Application Acceptance | document details
EERA staff Comments and Recommendations to the Commission on application completeness of Enbridge's Line 3 Pipeline Replacement Route Permit Application
04/23/15 Route Permit Application -- Line 3 Pipeline Replacement Project
Enbridge Energy proposes to replace 337 miles of existing Line 3 Pipeline and associated facilities between the Norht Dakota/Minnesota border and the Minnesota/Wisconsin border.
Date Document On Behalf Of Description
05/27/16 20165-121764-01 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY COMMENTS--SCOPING COMMENTS ON LINE 3 EAW AND DRAFT SCOPE
05/26/16 20165-121692-02 ENBRIDGE ENERGY, LIMITED PARTNERSHIP COMMENTS--SCOPING COMMENTS AND APPENDICES A - F
05/26/16 20165-121702-01 MINNESOTA DEPARTMENT OF NATURAL RESOURCES COMMENTS
05/26/16 20165-121697-01 THE MILLE LACS BAND OF OJIBWE COMMENTS
05/26/16 20165-121692-04 ENBRIDGE ENERGY, LIMITED PARTNERSHIP COMMENTS--COVER LETTER, AFFIDAVIT OF SERVICE AND SERVICE LISTS
05/26/16 20165-121701-02 SIERRA CLUB COMMENTS
05/25/16 20165-121623-01 COURT REPORTER EXHIBITS - HEARING--PREHEARING - EXHIBIT A
05/25/16 20165-121623-03 COURT REPORTER EXHIBITS - HEARING--PREHEARING - EXHIBIT B
05/25/16 20165-121623-05 COURT REPORTER EXHIBITS - HEARING--PREHEARING - EXHIBIT C
05/25/16 20165-121622-01 COURT REPORTER TRANSCRIPTS--PREHEARING ON MAY 16, 2016
05/25/16 20165-121627-01 OAH ORDER
05/24/16 20165-121598-02 LEROY AND JANICE CHIEF LETTER
05/19/16 20165-121493-06 PUC MINUTES--MARCH 24, 2016 AGENDA
05/03/16 20165-120968-02 PUC PUBLIC COMMENT--PUBLIC COMMENT OUTSIDE OF OPEN COMMENT PERIOD
04/29/16 20164-120852-01 OAH ORDER--RE: PETITIONS TO INTERVENE...
04/28/16 20164-120742-01 ENBRIDGE ENERGY, LIMITED PARTNERSHIP COMPLIANCE FILING--COPY OF CHECK FOR EIS REVIEW
04/20/16 20164-120377-01 OAH ORDER
04/18/16 20164-120240-01 DOC EERA OTHER--APPENDIX A - DETAILED ROUTE MAP 41
04/12/16 20164-119958-06 DOC EERA OTHER--APPENDIX A3 - SOILS MAPS 41-54
04/12/16 20164-119958-12 DOC EERA OTHER--APPENDIX A3 - SOILS MAPS 83-96
04/12/16 20164-119957-06 DOC EERA OTHER--APPENDIX A2 - SURVEY MAPS 45-58
04/12/16 20164-119957-16 DOC EERA OTHER--APPENDIX A2 - SURVEY MAPS 114-127
04/12/16 20164-119959-18 DOC EERA OTHER--APPENDIX J - ROAD AND RAILROAD CROSSING TABLE
04/12/16 20164-119958-08 DOC EERA OTHER--APPENDIX A3 - SOILS MAPS 55-67
04/12/16 20164-119956-11 DOC EERA OTHER--APPENDIX A - DETAILED ROUTE MAPS 41-53
04/12/16 20164-119958-02 DOC EERA OTHER--APPENDIX A3 - SOILS MAPS 1-21
04/12/16 20164-119959-16 DOC EERA OTHER--APPENDIX I - SENSITIVE NOISE RECEPTORS
04/12/16 20164-119957-18 DOC EERA OTHER--APPENDIX A2 - SURVEY MAPS 128-140
04/12/16 20164-119958-16 DOC EERA OTHER--APPENDIX A3 - SOILS MAPS 110-124
04/12/16 20164-119958-18 DOC EERA OTHER--APPENDIX A3 - SAOILS MAPS 125-140
04/12/16 20164-119958-10 DOC EERA OTHER--APPENDIX A3 - SOILS MAPS 68-82
04/12/16 20164-119956-03 DOC EERA OTHER--EAW PART 2
04/12/16 20164-119959-10 DOC EERA OTHER--APPENDIX F - WETLAND CROSSING TABLE
04/12/16 20164-119956-07 DOC EERA OTHER--APPENDIX A - DETAILED ROUTE MAPS 20-30
04/12/16 20164-119956-01 DOC EERA OTHER--EAW PART 1
04/12/16 20164-119957-14 DOC EERA OTHER--APPENDIX A2 - SURVEY MAPS 101-113
04/12/16 20164-119959-12 DOC EERA OTHER--APPENDIX G WATERBODIES IN MN WITHIN 1 MILE DOWNSTREAM OF CROSSINGS
04/12/16 20164-119957-12 DOC EERA OTHER--APPENDIX A2 - SURVEY MAPS 88-100
04/12/16 20164-119960-02 DOC EERA OTHER--LINE 3 DRAFT SCOPING DECISION DOCUMENT
04/12/16 20164-119958-04 DOC EERA OTHER--APPENDIX A3 - SOILS MAPS 22-40
04/12/16 20164-119959-06 DOC EERA OTHER--APPENDIX D - ACCESS ROADS TABLE
04/12/16 20164-119957-10 DOC EERA OTHER--APPENDIX A2 - SURVEY MAPS 73-87
04/12/16 20164-119968-01 DOC EERA NOTICE--OF AVAILABILITY OF SCOPING EAW AND DRAFT SCOPE FOR SANDPIPER PIPELINE AND LINE 3 REPLACEMENT PROJECTS
04/12/16 20164-119956-05 DOC EERA OTHER--APPENDIX A - DETAILED ROUTE MAPS 1-19
04/12/16 20164-119959-02 DOC EERA OTHER--APPENDIX B - TAX PARCEL LIST
04/12/16 20164-119957-08 DOC EERA OTHER--APPENDIX A2 - SURVEY MAPS 59-72
04/12/16 20164-119959-20 DOC EERA OTHER--LINE 3 REPLACEMENT PROJECT INCREMENTAL IMPACTS BY RESOURCE
04/12/16 20164-119959-04 DOC EERA OTHER--APPENDIX C - LINE 3 DECOMMISSIONING REGULATIONS
04/12/16 20164-119956-09 DOC EERA OTHER--APPENDIX A - DETAILED ROUTE MAPS 31-40
04/12/16 20164-119957-04 DOC EERA OTHER--APPENDIX A2 - SURVEY MAPS 24-44
04/12/16 20164-119958-14 DOC EERA OTHER--APPENDIX A3 - SOILS MAPS 97-109
04/12/16 20164-119959-08 DOC EERA OTHER--APPENDIX E - WATERBODY CROSSING TABLE
04/12/16 20164-119957-02 DOC EERA OTHER--APPENDIX A2 - SURVEY MAPS 1-23
04/12/16 20164-119956-13 DOC EERA OTHER--APPENDIX A - DETAILED ROUTE MAPS 54-68
04/12/16 20164-119959-14 DOC EERA OTHER--APPENDIX H - LOG FOR WELLS 101877 AND 653274
03/31/16 20163-119626-03 PUC ORDER--CERTIFICATE OF SERVICE AND SERVICE LISTS
03/31/16 20163-119626-01 PUC ORDER--ORDER DENYING PETITIONS FOR RECONSIDERATION AND MOTION TO AMEND MEMORANDUM, AND REFERRING PETITIONS FOR INTERVENTION TO OAH
03/31/16 20163-119621-06 COURT REPORTER TRANSCRIPTS--TRANSCRIPT OF PUC PROCEEDINGS ON MARCH 24, 2016
03/31/16 20163-119621-02 COURT REPORTER TRANSCRIPTS--TRANSCRIPT OF PUC PROCEEDINGS ON DECEMBER 17, 2015
03/28/16 20163-119456-01 UNITE STATES ENVIRONMENTAL PROTECTION AGENCY LETTER
03/24/16 20163-119391-03 JOAN LEE, POLK COUNTY COMMISSIONER LETTER--SUPPORT LETTER FROM COUNTY COMMISSIONERS
03/23/16 20163-119385-03 ENBRIDGE ENERGY, LIMITED PARTNERSHIP OTHER--COVER LETTER, AFFIDAVIT OF SERVICE AND SERVICE LIST
03/23/16 20163-119385-01 ENBRIDGE ENERGY, LIMITED PARTNERSHIP OTHER--PREFERRED COMMISSION DECISION ALTERNATIVES FOR MARCH 24 MEETING
03/21/16 20163-119312-02 ENBRIDGE ENERGY, LIMITED PARTNERSHIP OTHER--ENBRIDGE COVER LETTER, AFFIDAVIT OF SERVICE, AND SERVICE LIST
03/21/16 20163-119312-04 ENBRIDGE ENERGY, LIMITED PARTNERSHIP OTHER--RESPONSE TO FRIENDS OF THE HEADWATERS MARCH 9 MOTION
03/18/16 20163-119250-01 OAH ORDER--AMENDED ORDER GRANTING PETITION TO INTERVENE BY WHITE EARTH BAND OF OJIBWE
03/14/16 20163-119125-01 PUC BRIEFING PAPERS--MARCH 24, 2016 AGENDA
03/11/16 20163-119063-02 PUC NOTICE OF COMMISSION MEETING--MARCH 24, 2016
03/11/16 20163-119063-14 PUC NOTICE OF COMMISSION MEETING--CERTIFICATE OF SERVICE AND SERVICE LISTS
03/09/16 20163-119012-01 FRIENDS OF THE HEADWATERS MOTION
03/07/16 20163-118966-04 MINNESOTA CENTER FOR ENVIRONMENTAL ADVOCACY LETTER--RESPONSE
03/07/16 20163-118961-02 DOC DER LETTER--MEMORANDUM OF UNDERSTANDING
03/02/16 20163-118867-01 PUC PUBLIC COMMENT--PUBLIC COMMENT OUTSIDE OF OPEN COMMENT PERIOD
02/29/16 20162-118789-02 NORTH DAKOTA PIPELINE COMPANY LLC OTHER--OTHER-RESPONSE IN OPPOSITION TO MCEA PETITION TO INTERVENE
02/29/16 20162-118789-01 NORTH DAKOTA PIPELINE COMPANY LLC OTHER--COVER LETTER CERTIFICATE OF SERVICE SERVICE LISTS
02/23/16 20162-118601-01 MN DNR LETTER
02/22/16 20162-118566-04 MINNESOTA CENTER FOR ENVIRONMENTAL ADVOCACY NOTICE OF APPEARANCE
02/22/16 20162-118524-01 JOHN MUNTER NOTICE OF APPEARANCE
02/22/16 20162-118565-04 MINNESOTA CENTER FOR ENVIRONMENTAL ADVOCACY INTERVENTION--PETITION TO INTERVENE
02/22/16 20162-118562-01 ENBRIDGE ENERGY, LIMITED PARTNERSHIP COMMENTS--RESPONSE TO C DIESSNERS DECEMBER 30, 2015 COMMENTS
02/22/16 20162-118557-01 JOHN MUNTER OTHER--CERTIFICATE OF SERVICE
02/22/16 20162-118537-01 WHITE EARTH BAND OF OJIBWE NOTICE OF APPEARANCE
02/22/16 20162-118562-03 ENBRIDGE ENERGY, LIMITED PARTNERSHIP COMMENTS--COVER LETTER AFFIDAVIT OF SERVICE AND SERVICE LISTS
02/19/16 20162-118510-01 PUC MINUTES--DECEMBER 17, 2015 AGENDA
02/19/16 20162-118519-06 PUC COMMENTS--OUTSIDE OF COMMENT PERIOD
02/19/16 20162-118519-02 PUC COMMENTS--OUTSIDE OF COMMENT PERIOD
02/19/16 20162-118519-10 PUC COMMENTS--OUTSIDE OF COMMENT PERIOD
02/19/16 20162-118511-01 MILLE LACS BAND OF OJIBWE NOTICE OF APPEARANCE--OF DAVID J. ZOLL
02/19/16 20162-118509-01 MILLE LACS BAND OF OJIBWE NOTICE OF APPEARANCE--OF CHARLES N. NAUEN
02/18/16 20162-118438-01 SIERRA CLUB NOTICE OF APPEARANCE
02/18/16 20162-118416-03 ENBRIDGE ENERGY, LIMITED PARTNERSHIP NOTICE OF APPEARANCE--NOTICE OF APPEARANCE
02/18/16 20162-118416-01 ENBRIDGE ENERGY, LIMITED PARTNERSHIP NOTICE OF APPEARANCE--COVER LETTER CERTIFICATE OF SERVICE AND SERVICE LISTS
02/16/16 20162-118308-04 SIERRA CLUB RECONSIDERATION--COVER LETTER, CERT. OF SERVICE FOR ANSWER TO PETITIONS AND COMMENTS ON REQUEST FOR CLARIFICATION
02/16/16 20162-118307-02 SIERRA CLUB RECONSIDERATION--SIERRA CLUB ANSWER TO PETITIONS FOR RECONSIDERATION AND FOR CLARIFICATION
02/11/16 20162-118216-02 FRIENDS OF THE HEADWATERS OTHER--RESPONSE
02/11/16 20162-118187-01 WHITE EARTH BAND OF OJIBWE OTHER--REPLY TO RESPONSE
02/11/16 20162-118228-01 MILLE LACS BAND OF OJIBWE OTHER--ANSWER TO PETITIONS FOR RECONSIDERATION
02/10/16 20162-118130-01 WHITE EARTH BAND OF OJIBWE LETTER--SANDPIPER PIPELINE AND LINE 3 REPLACEMENT
02/09/16 20162-118106-02 FRIENDS OF THE HEADWATERS NOTICE OF APPEARANCE
02/09/16 20162-118104-01 FRIENDS OF THE HEADWATERS INTERVENTION
02/09/16 20162-118111-01 DOC EERA NOTICE OF APPEARANCE
02/08/16 20162-118071-01 KENNECOTT EXPLORATION COMPANY NOTICE OF APPEARANCE
02/05/16 20162-118041-03 ENBRIDGE ENERGY, LIMITED PARTNERSHIP RECONSIDERATION--PETITION FOR RECONSIDERATION
02/05/16 20162-118041-01 ENBRIDGE ENERGY, LIMITED PARTNERSHIP RECONSIDERATION--COVER LETTER AFFIDAVIT OF SERVICE AND SERVICE LISTS
02/03/16 20162-117975-02 LABORERS DISTRICT COUNCIL OF MN & ND RECONSIDERATION--PETITION_1 OF 3
02/03/16 20162-117970-01 MINNESOTA CHAMBER OF COMMERCE RECONSIDERATION--PETITION
02/03/16 20162-117975-06 LABORERS DISTRICT COUNCIL OF MN & ND RECONSIDERATION--CERTIFICATE OF SERVICE_3 OF 3
02/03/16 20162-117975-04 LABORERS DISTRICT COUNCIL OF MN & ND RECONSIDERATION--COVER LETTER_2 OF 3
02/01/16 20162-117877-03 PUC ORDER--CERTIFICATE OF SERVICE AND SERVICE LISTS
02/01/16 20162-117868-04 PUC PUBLIC COMMENT--PUBLIC COMMENT OUTSIDE OF OPEN COMMENT PERIOD
02/01/16 20162-117877-01 PUC ORDER--ORDER JOINING NEED AND ROUTING DOCKETS
02/01/16 20162-117889-01 PUC ORDER--NOTICE OF HEARING
02/01/16 20162-117889-02 PUC ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST
01/29/16 20161-117820-01 ENBRIDGE ENERGY, LIMITED PARTNERSHIP OTHER--COVER LETTER AFFIDAVIT OF SERVICE AND SERVICE LIST
01/29/16 20161-117820-03 ENBRIDGE ENERGY, LIMITED PARTNERSHIP OTHER--RESPONSE TO WHITE EARTH BAND OF OJIBWE PETITION TO INTERVENE
01/19/16 20161-117392-01 WHITE EARTH BAND OF OJIBWE INTERVENTION
01/04/16 20161-116943-01 PUC PUBLIC COMMENT--PUBLIC COMMENT OUTSIDE OF OPEN COMMENT PERIOD
01/04/16 20161-116960-04 PUC PUBLIC COMMENT--PUBLIC COMMENT OUTSIDE OF OPEN COMMENT PERIOD
12/21/15 201512-116689-03 NORTH DAKOTA PIPELINE COMPANY LLC AND ENBRIDGE ENERGY, LIMITED PARTNERSHIP OTHER--LETTER TO DANIEL WOLF ENCLOSING HANDOUTS FROM DECEMBER 17, 2015 MEETING
12/16/15 201512-116554-02 PUC BRIEFING PAPERS--REVISED DECISION ALTERNATIVES DECEMBER 17, 2015 AGENDA
12/15/15 201512-116465-04 PUC PUBLIC COMMENT--PUBLIC COMMENT OUTSIDE OF OPEN COMMENT PERIOD
12/14/15 201512-116454-04 PUC PUBLIC COMMENT--PUBLIC COMMENT OUTSIDE OF OPEN COMMENT PERIOD
12/10/15 201512-116355-01 PUC BRIEFING PAPERS--DECEMBER 17, 2015 AGENDA
12/10/15 201512-116348-04 WADE PILGREEN COMMENTS
12/08/15 201512-116301-01 PUC NOTICE--REQUESTING INFORMATION FROM OFFICIAL PARTIES
12/08/15 201512-116302-04 PUC NOTICE OF COMMISSION MEETING--CERTIFICATE OF SERVICE AND SERVICE LISTS
12/08/15 201512-116302-02 PUC NOTICE OF COMMISSION MEETING--REVISED FOR DECEMBER 17, 2015
12/08/15 201512-116301-03 PUC NOTICE--CERTIFICATE OF SERVICE AND SERVICE LISTS
12/04/15 201512-116183-14 PUC NOTICE OF COMMISSION MEETING--CERTIFICATE OF SERVICE AND SERVICE LIST
12/04/15 201512-116183-07 PUC NOTICE OF COMMISSION MEETING--DECEMBER 17, 2015
11/30/15 201511-116032-01 DOC-EERA COMMENTS--COMMENTS AND RECOMMENDATIONS ON LINE 3 ROUTE ALTERNATIVE PROPOSALS
11/12/15 201511-115672-01 PUC MINUTES--JULY 1, 2015 AGENDA
11/02/15 201511-115339-01 PUC PUBLIC COMMENT--PUBLIC COMMENT OUTSIDE OF OPEN COMMENT PERIOD
10/08/15 201510-114699-02 PUC PUBLIC COMMENT
10/08/15 201510-114700-01 PUC PUBLIC COMMENT
10/07/15 201510-114677-05 DOC EERA COMMENTS--PUBLIC COMMENT 5 OF 15-PUBLIC WRITTEN COMMENTS M-R
10/07/15 201510-114677-04 DOC EERA COMMENTS--PUBLIC COMMENT 4 OF 15-PUBLIC WRITTEN COMMENTS G-L
10/07/15 201510-114678-07 DOC EERA COMMENTS--PUBLIC COMMENT 13 OF 15-AGENCY COMMENT TRIBAL
10/07/15 201510-114677-01 DOC EERA COMMENTS--PUBLIC COMMENT 1 OF 15-PUBLIC ORAL COMMENTS
10/07/15 201510-114678-09 DOC EERA COMMENTS--PUBLIC COMMENT 15 OF 15-APPLICANT COMMENT PART 2
10/07/15 201510-114678-03 DOC EERA COMMENTS--PUBLIC COMMENT P OF 15-AGENCY COMMENT DNR PART 2
10/07/15 201510-114678-05 DOC EERA COMMENTS--PUBLIC COMMENT 11 OF 15-AGENCY COMMENT MNDOT
10/07/15 201510-114677-03 DOC EERA COMMENTS--PUBLIC COMMENT 3 OF 15-PUBLIC WRITTEN COMMENTS F
10/07/15 201510-114678-08 DOC EERA COMMENTS--PUBLIC COMMENT 14 OF 15-APPLICANT COMMENT PART 1
10/07/15 201510-114677-02 DOC EERA COMMENTS--PUBLIC COMMENT 2 OF 15-PUBLIC WRITTEN COMMENTS A-E
10/07/15 201510-114677-06 DOC EERA COMMENTS--PUBLIC COMMENT 6 OF 15-PUBLIC WRITTEN COMMENTS S-Z
10/07/15 201510-114678-06 DOC EERA COMMENTS--PUBLIC COMMENT 12 OF 15-AGENCY COMMENT MPCA
10/07/15 201510-114678-02 DOC EERA COMMENTS--PUBLIC COMMENT 8 OF 15-AGENCY COMMENT DNR PART 1
10/07/15 201510-114678-04 DOC EERA COMMENTS--PUBLIC COMMENT 10 OF 15-AGENCY COMMENT DNR PART 3
10/07/15 201510-114678-01 DOC EERA COMMENTS--PUBLIC COMMENT 7 OF 15-AGENCY COMMENT CARLTON COUNTY
10/05/15 201510-114602-01 ENBRIDGE ENERGY, LIMITED PARTNERSHIP OTHER--COVER LETTER AFFIDAVIT OF SERVICE AND SERVICE LISTS
10/05/15 201510-114602-03 ENBRIDGE ENERGY, LIMITED PARTNERSHIP OTHER--RESPONSE IN OPPOSITION TO SIERRA CLUB MOTION TO SUSPEND OR EXTEND OR REOPEN THE SCOPING COMMENT PERIOD
10/01/15 20159-114471-02 SIERRA CLUB COMMENTS--SCOPING COMMENTS
10/01/15 20159-114479-02 MELODEE MONICKEN COMMENTS
10/01/15 20159-114475-02 FRIENDS OF THE HEADWATERS COMMENTS
10/01/15 20159-114474-02 MILLE LACS BAND OF OJIBWE COMMENTS
10/01/15 20159-114477-01 MELODEE MONICKEN COMMENTS
10/01/15 20159-114471-04 SIERRA CLUB COMMENTS--ATTACHMENTS TO SCOPING COMMENTS
10/01/15 20159-114474-04 MILLE LACS BAND OF OJIBWE COMMENTS
10/01/15 20159-114473-02 SIERRA CLUB COMMENTS--CERTIFCIATE OF SERVICE_SCOPING COMMENTS
10/01/15 201510-114486-01 CARLTON COUNTY LAND STEWARDS OTHER--CERTIFICATE OF SERVICE
10/01/15 201510-114506-02 EILEEN SHORE COMMENTS
09/30/15 20159-114453-08 ENBRIDGE ENERGY, LIMITED PARTNERSHIP COMMENTS--SCOPING COMMENTS PART 3 OF 3
09/30/15 20159-114435-01 MNDOT COMMENTS
09/30/15 20159-114453-06 ENBRIDGE ENERGY, LIMITED PARTNERSHIP COMMENTS--SCOPING COMMENTS PART 2 OF 3
09/30/15 20159-114456-01 MINNESOTA DEPARTMENT OF NATURAL RESOURCES COMMENTS--PART 1 OF 2 SANDPIPER SCOPING LETTER ATTACHMENTS
09/30/15 20159-114453-04 ENBRIDGE ENERGY, LIMITED PARTNERSHIP COMMENTS--SCOPING COMMENTS PART 1 OF 3
09/30/15 20159-114451-02 MINNESOTA DEPARTMENT OF NATURAL RESOURCES COMMENTS
09/30/15 20159-114457-01 MINNESOTA DEPARTMENT OF NATURAL RESOURCES COMMENTS--PART 2 OF 2 SANDPIPER SCOPING COMMENTS ATTACHMENTS
09/30/15 20159-114455-01 WHITE EARTH BAND OF OJIBWE COMMENTS
09/30/15 20159-114445-02 GERALD PERKINS COMMENTS
09/30/15 20159-114453-02 ENBRIDGE ENERGY, LIMITED PARTNERSHIP COMMENTS--AFFIDAVIT OF SERVICE AND SERVICE LISTS
09/30/15 20159-114451-01 MINNESOTA DEPARTMENT OF NATURAL RESOURCES COMMENTS
09/30/15 20159-114464-01 CARLTON COUNTY LAND STEWARDS COMMENTS--LETTER TO JAMIE MACALISTER WITH ATTACHMENTS
09/30/15 20159-114431-02 MN POLLUTION CONTROL AGENCY COMMENTS
09/30/15 20159-114458-01 MINNESOTA DEPARTMENT OF NATURAL RESOURCES COMMENTS
09/30/15 20159-114469-01 MILLE LACS BAND OF OJIBWE INTERVENTION
09/29/15 20159-114356-01 MINNESOTA COALITION OF LAKE ASSOCIATIONS PUBLIC COMMENT--ALSO APPLIES TO CN-14-916, CN-13-473, PPL-13-474
09/29/15 20159-114371-02 ENBRIDGE ENERGY, LIMITED PARTNERSHIP COMPLIANCE FILING--PART 1 OF 2
09/29/15 20159-114371-04 ENBRIDGE ENERGY, LIMITED PARTNERSHIP COMPLIANCE FILING--PART 2 OF 2
09/25/15 20159-114295-02 ENBRIDGE ENERGY, LIMITED PARTNERSHIP OTHER--COVER LETTER AFFIDAVIT OF SERVICE AND SERVICE LISTS
09/25/15 20159-114295-04 ENBRIDGE ENERGY, LIMITED PARTNERSHIP OTHER--PETITION FOR REFERRAL OF ROUTE PERMIT PROCEEDINGS TO THE OAH AND REQUEST FOR COMMENTS
09/23/15 20159-114235-04 SIERRA CLUB MOTION--CVR LTR CERT SERV FOR SIERRA CLUB MOTION TO SUSPEND EXTEND REOPEN SCOPING COMMENT PERIOD
09/23/15 20159-114235-02 SIERRA CLUB MOTION--MOTION TO SUSPEND EXTEND OR REOPEN SCOPING PERIOD
09/09/15 20159-113865-01 MINNESOTA CHAMBER OF COMMERCE INTERVENTION--PETITION
09/04/15 20159-113790-01 SIERRA CLUB INTERVENTION--PETITION TO INTERVENE
08/19/15 20158-113372-01 DOC EERA NOTICE--ADDITIONAL PUBLIC INFORMATION AND SCOPING MEETING
08/12/15 20158-113179-02 PUC ORDER--CERTIFICATE OF SERVICE AND SERVICE LISTS
08/12/15 20158-113179-01 PUC ORDER--ORDER FINDING APPLICATION SUBSTANTIALLY COMPLETE AND VARYING TIMELINES
08/05/15 20158-113038-02 PUC OTHER--MEETING PRESENTATION - CORRECTED
08/04/15 20158-113010-02 PUC PUBLIC COMMENT--14-916 IS A PUBLIC COMMENT OUTSIDE OF OPEN COMMENT PERIOD
08/03/15 20158-112995-01 PUC OTHER--MEETING PRESENTATION
07/29/15 20157-112836-01 KENNECOTT EXPLORATION COMPANY OTHER--KENNECOTT ROUTE ALTERNATIVE IN LINE 3 REPLACEMENT PROCEEDING
07/20/15 20157-112551-02 PUC NOTICE--OF APPLICATION ACCEPTANCE-PUBLIC INFORMATION AND ENVIRONMENTAL ANALYSIS SCOPING MEETINGS
07/20/15 20157-112550-01 COURT REPORTER TRANSCRIPTS--STAFF BRIEFING, ORAL ARGUMENTS & DELIBERATIONS HELD ON JULY 1, 2015 - FINAL - WITH CORRECTIONS
07/20/15 20157-112551-04 PUC NOTICE--CERTIFICATE OF SERVICE AND SERVICE LIST
07/16/15 20157-112494-02 ENBRIDGE ENERGY, LIMITED PARTNERSHIP OTHER--UPDATED SUPPLEMENTAL RESPONSE
07/13/15 20157-112343-02 COURT REPORTER TRANSCRIPTS--STAFF BRIEFING, ORAL ARGUMENTS & DELIBERATIONS, 7/1/15 IN ST PAUL
06/29/15 20156-111819-02 ENBRIDGE ENERGY, LIMITED PARTNERSHIP OTHER--SUPPLEMENTAL RESPONSE
06/24/15 20156-111725-01 PUC BRIEFING PAPERS--JULY 1, 2015 AGENDA
06/19/15 20156-111585-24 PUC NOTICE OF COMMISSION MEETING--CERTIFICATE OF SERVICE AND SERVICE LIST
06/19/15 20156-111599-12 PUC NOTICE OF COMMISSION MEETING--CORRECTED - JULY 1, 2015
06/19/15 20156-111585-10 PUC NOTICE OF COMMISSION MEETING--JULY 1, 2015
06/19/15 20156-111599-26 PUC NOTICE OF COMMISSION MEETING--CERTIFICATE OF SERVICE AND SERVICE LIST
05/20/15 20155-110581-02 PUC PUBLIC COMMENT
05/19/15 20155-110562-08 ENBRIDGE ENERGY, LIMITED PARTNERSHIP REPLY COMMENTS--EXHIBIT 2 - SAFETY REPORT ATTACHMENTS
05/19/15 20155-110562-04 ENBRIDGE ENERGY, LIMITED PARTNERSHIP REPLY COMMENTS--REPLY COMMENTS
05/19/15 20155-110562-10 ENBRIDGE ENERGY, LIMITED PARTNERSHIP REPLY COMMENTS--EXHIBIT 3 REVISED PPL APPLICATION APPENDIX B - MAP 24
05/19/15 20155-110562-06 ENBRIDGE ENERGY, LIMITED PARTNERSHIP REPLY COMMENTS--EXHIBIT 1 REVISED CN APPLICATION APPENDIX A - PROJECT OVERVIEW MAP
05/19/15 20155-110562-12 ENBRIDGE ENERGY, LIMITED PARTNERSHIP REPLY COMMENTS--EXHIBIT 4 - ENBRIDGE LETTER TO PCA DATED APRIL 28 2015
05/19/15 20155-110562-02 ENBRIDGE ENERGY, LIMITED PARTNERSHIP REPLY COMMENTS--COVER LETTER AFFIDAVIT OF SERVICE AND SERVICE LIST
05/14/15 20155-110417-02 LABORERS DISTRICT COUNCIL OF MN & ND INTERVENTION--COVER LETTER
05/14/15 20155-110417-06 LABORERS DISTRICT COUNCIL OF MN & ND INTERVENTION--PETITION FOR INTERVENTION SERVICE LIST
05/14/15 20155-110417-04 LABORERS DISTRICT COUNCIL OF MN & ND INTERVENTION--PETITION FOR INTERVENTION
05/13/15 20155-110371-01 DOC EERA COMMENTS--COMMENTS ON LINE 3 PIPELINE REPLACEMENT ROUTE PERMIT APPLICATION
05/12/15 20155-110360-04 FRIENDS OF THE HEADWATERS LETTER--ATTACHED 5/8/15 EXTENSION REQUEST
05/12/15 20155-110352-01 MINNESOTA CENTER FOR ENVIRONMENTAL ADVOCACY COMMENTS--COVER LETTER, AFFIDAVIT, AND SERVICE LIST
05/12/15 20155-110360-02 FRIENDS OF THE HEADWATERS LETTER--RE: EXTENSION OF THE COMMENT DEADLINE
05/12/15 20155-110359-01 FRIENDS OF THE HEADWATERS COMMENTS
05/12/15 20155-110352-03 MINNESOTA CENTER FOR ENVIRONMENTAL ADVOCACY COMMENTS--ON COMPLETENESS
05/12/15 20155-110350-01 CARLTON COUNTY LAND STEWARDS PUBLIC COMMENTS
05/12/15 20155-110366-01 MINNESOTA POLLUTION CONTROL AGENCY PUBLIC COMMENT
05/12/15 20155-110367-01 MINNESOTA DEPARTMENT OF NATURAL RESOURCES COMMENTS
05/11/15 20155-110313-01 KENNECOTT EXPLORATION COMPANY INTERVENTION
05/08/15 20155-110274-01 SANDY AND CRAIG STERLE COMMENTS
05/04/15 20155-110103-02 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--COVER LETTER AOS AND SERVICE LIST
05/04/15 20155-110103-01 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--ERRATA APPENDIX B - ROUTE PERMIT MAPS PART 7 OF 12
04/28/15 20154-109766-01 PUC NOTICE OF COMMENT PERIOD--ON COMPLETENESS OF CERTIFICATE OF NEED AND ROUTE PERMIT APPLICATIONS
04/28/15 20154-109766-03 PUC NOTICE OF COMMENT PERIOD--CERTIFICATE OF SERVICE AND SERVICE LISTS
04/24/15 20154-109661-05 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX B - ROUTE PERMIT MAPS PART 11 OF 12
04/24/15 20154-109662-05 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX G - TYPICAL ROW CONFIGURATION
04/24/15 20154-109660-03 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX A - 1991 PRESIDENTIAL PERMIT
04/24/15 20154-109660-01 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--COVER LETTER AOS AND SERVICE LIST
04/24/15 20154-109662-10 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX J - AGENCY CONSULTATION LETTERS FROM ENBRIDGE PART 3 OF 3
04/24/15 20154-109662-02 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX D - PIPELINE SAFETY REPORT
04/24/15 20154-109662-06 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX H - AGRICULTURAL PROTECTION PLAN
04/24/15 20154-109660-08 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX B - ROUTE PERMIT MAPS PART 5 OF 12
04/24/15 20154-109660-07 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX B - ROUTE PERMIT MAPS PART 4 OF 12
04/24/15 20154-109663-02 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX L - NUMBER OF ROADS CROSSED
04/24/15 20154-109661-03 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX B - ROUTE PERMIT MAPS PART 9 OF 12
04/24/15 20154-109662-07 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX I - SAME TRENCH TYPICALS
04/24/15 20154-109663-04 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX N - TABLES DETAILING CONSTRUCTION AND OPERATIONS IMPACTS
04/24/15 20154-109663-01 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX K - RESPONSE TO SANDPIPER COMMENT LETTERS
04/24/15 20154-109660-05 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX B - ROUTE PERMIT MAPS PART 2 OF 12
04/24/15 20154-109661-06 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX B - ROUTE PERMIT MAPS PART 12 OF 12
04/24/15 20154-109662-03 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX E - ENVIRONMENTAL PROTECTION PLAN
04/24/15 20154-109663-05 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX O - WATERBODIES CROSSED
04/24/15 20154-109660-06 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX B - ROUTE PERMIT MAPS PART 3 OF 12
04/24/15 20154-109660-09 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX B - ROUTE PERMIT MAPS PART 6 OF 12
04/24/15 20154-109662-04 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX F - MATERIAL SAFETY DATA SHEETS
04/24/15 20154-109661-01 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX B - ROUTE PERMIT MAPS PART 7 OF 12
04/24/15 20154-109663-03 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX M - NOISE ANALYSIS
04/24/15 20154-109663-06 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX P - UNANTICIPATED DISCOVERIES PLAN
04/24/15 20154-109660-04 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX B - ROUTE PERMIT MAPS PART 1 OF 12
04/24/15 20154-109662-01 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX C - STATION PLOT PLANS
04/24/15 20154-109661-02 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX B - ROUTE PERMIT MAPS PART 8 OF 12
04/24/15 20154-109662-09 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX J - AGENCY CONSULTATION LETTERS FROM ENBRIDGE PART 2 OF 3
04/24/15 20154-109660-02 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--LINE 3 EXECUTIVE SUMMARY
04/24/15 20154-109663-07 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX Q - PUBLIC OUTREACH MATERIAL
04/24/15 20154-109662-08 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX J - AGENCY CONSULTATION LETTERS FROM ENBRIDGE PART 1 OF 3
04/24/15 20154-109661-07 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--LINE 3 ROUTE PERMIT APPLICATION PART 1 OF 3
04/24/15 20154-109661-04 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--APPENDIX B - ROUTE PERMIT MAPS PART 10 OF 12
04/24/15 20154-109661-08 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--LINE 3 ROUTE PERMIT APPLICATION PART 2 OF 3
04/24/15 20154-109661-09 ENBRIDGE ENERGY, LIMITED PARTNERSHIP INITIAL FILING--LINE 3 ROUTE PERMIT APPLICATION PART 3 OF 3