This webpage contains information and documents related to the permitting of this project by the Minnesota Public Utilities Commission. Every project before the Commission has an electronic docket (eDocket), a file folder for all of the project's documents.

Documents for this project are listed below in the File Register, most recent documents first. To view the eDockets record for this project, click on the eDockets link below, or click on the eDockets tab in the File Register. A subset of the record, including key documents with descriptions, is available by clicking on the Energy Facilities tab in the File Register.

For more information about participating in the permitting of this project, click on the How to Participate tab, or contact the environmental review manager or public advisor listed below.

Project Docket

Docket No 13-68
Project name Deer River Transmission Project
Applicant Minnesota Power
Description Minnesota Power proposes to construct approximately one mile of new 115 kV transmission line, approximately 0.3 miles of new 230 kV transmission line, and a replacement substation east of the city of Deer River in Itasca County. The Deer River Transmission Project would also rebuild approximately 0.9 miles of an existing 115 kV transmission line, and remove approximately 7.5 miles of existing 115 kV transmission line
Subjects Environmental policy; Electric power transmission
Location Itasca County; Itasca County -- Deer River Township
Docket created: April 16, 2013
Contacts: Suzanne Steinhauer, 651-539-1843, Environmental Review Manager.
Status:
 
06-19-2013
Public meeting
 
06-27-2013
Application accepted
 
08-8-2013
Scoping decision
 
11-20-2013
Environmental document available
 
01-6-2014
Public hearing
 
06-10-2014
Permit Decision
 
12-14-2015
Project built
 
Project closed
eDockets 13-68
Mailing list • Register (if you have never established an account) Or
• Sign on (if you already have established an account for other mailing lists)
Project Summary

Minnesota Power proposes a number of transmission improvements as part of the Deer River Transmission Project (Project).  Under the proposed Project Minnesota Power would (1) construct approximately one mile of new 115 kV transmission line, (2) construct approximately 0.3 miles of double-circuit 230 kV transmission line, (3) replace MP's existing Deer River 115/23 kV Substation with the new Zemple 230/115/23 kV Substation at the same location, (4) rebuild approximately 0.9 miles of an existing 115 kV transmission line, and (5) remove an existing 7.5 mile 115 kV transmission line.

Minnesota Power proposes to install wood or steel monopole or H-frame transmission structures with heights of approximately 55 to 100 feet for the 115 kV portions of the Project, and steel monopole structures with heights of approximately 100 to 150 feet for the 230 kV portion of the Project.  Minnesota Power has requested a route width of 1,000 feet within which to locate a 100-foot right-of-way for the new portion of 115 kV transmission line, and a route width of 500 feet within which to locate a 130-foot right of way for the 230 kV transmission line. 

Minnesota Power contends that the proposed Project does not meet the definition of a “large energy facility” under Minn. Stat. § 216B.2421, and therefore no Certificate of Need is required for the Project.

File Register
Energy Facilities eDockets
DateDocumentDescription
06/10/14 HVTL Route Permit - Minnesota Power Deer River Transmission Line Project | document details
On June 10, 2014, the Commission issued a HVTL Route Permit, including a description of the route and other conditions of the permit and the official maps of the route, to Minnesota Power in accordance with Minn. Stat. 216E
01/21/14 Notice RESCHEDULED Public Hearing for the Deer River 115 kV Transmission Line Project | document details
A hearing will be held on February 6, 2014, at 6:00 p.m. at the White Oak Inn and Suites on Minnesota Power's Application to the PUC for a HVTL Route Permit for the Deer River HVTL project in Itasca County. Public comments will be accepted by the administrative law judge through February 20, 2014
01/06/14 Notice - Public Hearing Postponed | document details
The MP Deer River HVTL Public Hearing scheduled for January 6, 2014 has been postponed due to inclement weather
12/04/13 Notice of Public Hearing for the Deer River 115 kV Transmission Line Project | document details
A hearing will be held on January 6, 2014, at 6:00 p.m. at the White Oak Inn and Suites on Minnesota Power's Application to the PUC for a HVTL Route Permit for the Deer River HVTL project in Itasca County. Public comments will be accepted by the administrative law judge through January 20, 2014
11/20/13 Notice of Environmental Assessment Availability - MP Deer River HVTL Project | document details
PLEASE TAKE NOTICE that the Minnesota Department of Commerce, Energy Environmental Review and Analysis (EERA) announces the release of the environmental assessment (EA) for the proposed MP Deer River HVTL project
11/20/13 Environmental Assessment – MP Deer River HVTL Project
The Environmental Assessment is a written document that describes the human and environmental impacts of the transmission line project (and selected alternative routes) and methods to mitigate such impacts. Applications for high voltage transmission line route permits under the alternative permitting process require a public hearing upon completion of the EA pursuant to Minn. R. 7850.3800
08/08/13 Environmental Assessment Scoping Decision: Deer River HVTL Project | document details
Scoping decision identifying the issues to be adressed in the EA to be prepared for Minnesota Power's proposed Deer River HVTL Project. No routes beside that proposed by Minnesota Power will be evaluated. The EA is scheduled to become available in November 2013
07/11/13 Oral Comments - Public Information and Scoping Meeting for Deer River HVTL Project | document details
Record of oral comments received at the public information and scoping meeting held June 19, 2013, in Deer River
07/11/13 Written Scoping Comments - Deer River HVTL Environmental Assessment | document details
Written public comments addressing the scope of the Environmental Assessment to be prepared for the Deer River HVTL project
06/06/13 Notice of Public Information and Environmental Assessment Scoping Meeting | document details
Notice of public meeting to be held in Deer River on June 19, 2013. Comments on alternatives and issues to be evaluated in the environmental assessment prepared for this docket will be accepted through July 3, 2013
05/02/13 EFP Comments on Application Acceptance | document details
EFP Staff comments and recommendations to the Commission on acceptance of Minnesota Power's Route Permit Application for the Deer River HVTL Project
04/17/13 Route Permit Application: Deer River Transmission Project
Minnesota Power application for 115 kV and 230 kV transmission lines and substation located east of the city of Deer River