Documents for this project are listed below in the File Register, most recent documents first. To view the eDockets record for this project, click on the eDockets link below, or click on the eDockets tab in the File Register. A subset of the record, including key documents with descriptions, is available by clicking on the Energy Facilities tab in the File Register.

For more information about participating in the permitting of this project, click on the How to Participate tab, or contact the state permit manager or public advisor listed below.

Project Docket

Docket No ET2/TL-12-1245
Project name Elko, New Market and Cleary Areas 115 kV Transmission Upgrade
Applicant Great River Energy
Description Great River Energy proposes to rebuild a portion of the existing 69 kV transmission system and construct a new double-circuit 115 kV transmission line in Scott and Rice counties
Subjects Environmental policy; Electric power transmission
Location Rice County; Scott County
Docket created: November 16, 2012
Contacts: David Birkholz, 651-296-2878, Environmental Review Manager.
Status:
 
Application accepted
 
Public meeting
 
Scoping decision
 
Environmental document available
 
Public hearing
 
Permit issued
 
Project built
 
Docket closed
eDockets 12-1245
Mailing list • Register (if you have never established an account) Or
• Sign on (if you already have established an account for other mailing lists)
 
Project Summary

Great River Energy, a Minnesota cooperative corporation, is proposing a 115 kilovolt (kV) transmission line project in the townships of Cedar Lake, Credit River, Spring Lake, and New Market and the city of Prior Lake in Scott County, and Wheatland Township in Rice County, Minnesota. Great River Energy will file applications for a Certificate of Need (see eDockets 12-1235) and Route Permit with the Public Utilities Commission to:

  • Rebuild approximately 3.5 miles of existing single-circuit 69 kV transmission line to 115 kV standards, but operated at 69 kV until approximately 2030, along primarily existing right-of-way from Prior Lake Junction to Credit River Junction in Credit River Township and the city of Prior Lake in Scott County;
  •  
  • Rebuild approximately 2.4 miles of existing single-circuit 69 kV transmission line to 115 kV standards, but operated at 69 kV until approximately 2030, along existing right-of-way, between Xcel Energy's Credit River Distribution Substation and Credit River Junction in Spring Lake and Credit River townships in Scott County;
  •  
  • Permit approximately 2.0 miles of existing double-circuit 69 kV transmission line between Great River Energy’s Chub Lake Substation (currently under construction) and Natchez Avenue to be operated at 115 kV by approximately 2022, in New Market Township, Scott County;
  •  
  • Rebuild approximately 5.6 miles of existing single-circuit 69 kV transmission line to 115 kV standards, but operated at 69 kV until approximately 2022, along existing right-of-way from Natchez Avenue, Minnesota Valley's Elko Substation and Minnesota Valley’s New Market Substation in New Market and Cedar Lake townships in Scott County; and
  •  
  • Construct approximately 5.4 miles of new double-circuit transmission line to 115 kV standards but to be operated at 69 kV between the Minnesota Valley’s New Market Substation to a new 69 kV breaker station in Wheatland Township (Veseli Breaker Station) in Rice County. One side of the double-circuit line will be operated at 69 kV until approximately 2022, and the other side of the double-circuit line will operated at 69 kV until approximately 2030.

According to Great River Energy, the Project must be complete by 2016 to address overloads that have been identified in the Project area, although operation of the system at 115 kV is not anticipated until 2022.

File Register
DateDocumentDescription
05/22/13 Notice of Intent by Great River Energy to Submit a Route Permit Application under the Alternative Permitting Process | document details
Great River Energy intends to submit a Route Permit application for the Elko New Market and Cleary Lake Areas 115 kV Transmission Project in Scott and Rice counties, Minnesota under the Alternative Permitting processes of Minn. Rules 7850.2800 to 7850.3900.
Date Document On Behalf Of Description
05/22/13 20135-87278-01 GREAT RIVER ENERGY NOTICE--GRE NOTICE OF INTENT TO SUBMIT A ROUTE PERMIT APPLICATION FOR THE ELKO NEW MARKET AND CLEARY LAKE AREAS PROJECT UNDER THE ALTERNATIVE PERMITTING PROCESS