This webpage contains information and documents related to the permitting of this project by the Minnesota Public Utilities Commission. Every project before the Commission has an electronic docket (eDocket), a file folder for all of the project's documents.

Documents for this project are listed below in the File Register, most recent documents first. To view the eDockets record for this project, click on the eDockets link below, or click on the eDockets tab in the File Register. A subset of the record, including key documents with descriptions, is available by clicking on the Energy Facilities tab in the File Register.

For more information about participating in the permitting of this project, click on the How to Participate tab, or contact the environmental review manager or public advisor listed below.

Project Docket

Docket No E002/TL-11-795
Project name Black Dog to Savage 115 kV Transmission Line Project
Applicant Xcel Energy
Description Xcel Energy proposes to replace approximately 4.6 miles of 115 kV transmission line between the Black Dog substation and Savage substation in Burnsville, Minnesota
Subjects Environmental policy; Electric power transmission
Location Dakota County; Dakota County -- Burnsville City
Docket created: February 15, 2012
Contacts: Ray Kirsch, 651-539-1841, Environmental Review Manager.
Bill Storm, 651-539-1844, Public Advisor.
Status:
 
03-23-2012
Application accepted
 
04-18-2012
Public meeting
 
05-15-2012
Scoping decision
 
08-15-2012
Environmental document available
 
09-11-2012
Public hearing
 
05-3-2013
Permit issued
 
05-15-2014
Project built
 
Docket closed
eDockets 11-795
Mailing list • Register (if you have never established an account) Or
• Sign on (if you already have established an account for other mailing lists)
Project Summary

Northern States Power Company (Xcel Energy) proposes to replace two existing 115 kilovolt (kV) tranmsission lines with a new double circuit 115 kV line, approximately 4.2 miles in length, in Dakota County.  The project will remove the two existing 115 kV lines from Black Dog Lake and will reroute the lines to facilitate a limestone quarry reclamation project.

The new double circuit 115 kV line will utilize single pole steel structures, ranging in height from 50 to 100 feet.  The right-of-way (easement) required for the line will be 100 feet (50 ft. on each side of the transmission line). The span between poles will be 500 to 800 feet.

Xcel Energy's Black Dog to Savage project requires a route permit from the Minnesota Public Utilities Commission (Commission).  Department of Commerce, Energy Facility Permitting staff conducted the environmental review for the project.  An environmental assessment of the project was issued on August 15, 2012.  Administrative law judge Barbara Neilson held a public hearing on the project on September 11, 2012.  On May 3, 2013, the Commission issued a route permit for the project.

Construction on the project is expected to begin in late 2013, with an anticipated in-service date of mid-2014.

Primary Documents
DateDocumentDescription
05/03/13 Route Permit for the Black Dog to Savage 115 kV Transmission Line Project | document details
The route permit for the Black Dog to Savage 115 kV transmission line project, including route permit maps
08/15/12 Environment Assessment for the Black Dog to Savage Project
Department of Commerce, Energy Facility Permitting staff has prepared and issued an environmental assessment (EA) for the Black Dog to Savage project. The EA identifies potential impacts and mitigation measures for the project
02/14/12 Route Permit Application
The route permit application submitted by Xcel Energy to the Minnesota Public Utilities Commission for the Black Dog to Savage 115 kV transmission line project
File Register
Energy Facilities eDockets
DateDocumentDescription
05/03/13 Route Permit for the Black Dog to Savage 115 kV Transmission Line Project | document details
The route permit for the Black Dog to Savage 115 kV transmission line project, including route permit maps
05/03/13 Commission Order Issuing a Route Permit for the Black Dog to Savage 115 kV Transmission Line Project | document details
Commission order issuing a route permit for the Black Dog to Savage 115 kV transmission line project. Includes the Commission's order, findings and conclusions, and the route permit with maps
01/24/13 Proposed Permit for the Black Dog to Savage Project | document details
Department of Commerce, Energy Facility Permitting staff has prepared a proposed permit for the Black Dog to Savage project. The proposed permit is based on the report of the administrative law judge and the record to date.
01/10/13 Administrative Law Judge's Findings of Fact, Conclusions, and Recommendations | document details
Findings of fact, conclusions, and recommendations from administrative law judge Barbara Neilson. The judge recommends issuing a route permit to Xcel Energy for the project as described in the environmental assessment and with specific mitigation measures.
08/16/12 Notice of Public Hearing and Availability of the Environmental Assessment for the Black Dog to Savage 115 kV Transmission Line Project | document details
A public hearing will be held on Tuesday, September 11, 2012, at 6:00 p.m. at the Burnsville City Hall in Burnsville, Minn. Public comments on the project will be accepted by the administrative law judge through September 28, 2012. Department of Commerce, Energy Facility Permitting staff has prepared an environmental assessment for the project
08/15/12 Environment Assessment for the Black Dog to Savage Project
Department of Commerce, Energy Facility Permitting staff has prepared and issued an environmental assessment (EA) for the Black Dog to Savage project. The EA identifies potential impacts and mitigation measures for the project
05/15/12 Scoping Decision for the Black Dog to Savage Project | document details
The scoping decision identifies the issues and routes that will be evaluated in the environmental assessment (EA) for the project. The EA is anticipated to be completed and available in July 2012
05/08/12 Public Comments Received on the Scope of the Environmental Assessment for the Black Dog to Savage Project
Public comments received including (1) Oral comments received at the public meeting on April 18, 2012, and (2) Written comments received during the comment period ending May 4, 2012.
04/19/12 Public Meetings Handouts
Handouts and informational materials provided to attendees of the April 18, 2012, public meeting in Burnsville
03/28/12 Notice of Public Information and Scoping Meeting for the Black Dog to Savage 115 kV Transmission Line Project | document details
A public information and scoping meeting will be held on Wednesday, April 18, 2012, at 6:00 p.m. at the Burnsville City Hall in Burnsville, Minn. Public comments on the scope of the environmental assessment that will be prepared for the project will be accepted through May 4, 2012
03/13/12 EFP Staff Comments and Recommendations on Application Acceptance | document details
Staff recommends that the Commission accept the route permit application for the Black Dog to Savage project as complete
02/14/12 Route Permit Application
The route permit application submitted by Xcel Energy to the Minnesota Public Utilities Commission for the Black Dog to Savage 115 kV transmission line project