This webpage contains information and documents related to the permitting of this project by the Minnesota Public Utilities Commission. Every project before the Commission has an electronic docket - an eDocket, a file folder for all of the project.s documents.
Documents for this project are listed below in the File Register, most recent documents first. To view the eDockets record for this project, click on the eDockets link below, or click on the eDockets tab in the File Register. A subset of the record, including key documents with descriptions, is available by clicking on the Energy Facilities tab in the File Register.
For more information about participating in the permitting of this project, click on the How to Participate tab, or contact the state permit manager or public advisor listed below.
Application accepted |
Public meeting |
Scoping decision |
Environmental document available |
Public hearing |
Permit issued |
Northern States Power Company (Xcel Energy) proposes to replace two existing 115 kilovolt (kV) tranmsission lines with a new double circuit 115 kV line, approximately 4.2 miles in length, in Dakota County. The project will remove the two existing 115 kV lines from Black Dog Lake and will reroute the lines to facilitate a limestone quarry reclamation project.
The new double circuit 115 kV line will utilize single pole steel structures, ranging in height from 50 to 100 feet. The right-of-way (easement) required for the line will be 100 feet (50 ft. on each side of the transmission line). The span between poles will be 500 to 800 feet.
Xcel Energy's Black Dog to Savage project requires a route permit from the Minnesota Public Utilities Commission (Commission). Department of Commerce, Energy Facility Permitting staff conducted the environmental review for the project. An environmental assessment of the project was issued on August 15, 2012. Administrative law judge Barbara Neilson held a public hearing on the project on September 11, 2012. On May 3, 2013, the Commission issued a route permit for the project.
Construction on the project is expected to begin in late 2013, with an anticipated in-service date of mid-2014.
| Primary Documents | ||
| Date | Document | Description |
| Route Permit for the Black Dog to Savage 115 kV Transmission Line Project | document details | The route permit for the Black Dog to Savage 115 kV transmission line project, including route permit maps |
|
| Date | Document | Description |
| Route Permit for the Black Dog to Savage 115 kV Transmission Line Project | document details | The route permit for the Black Dog to Savage 115 kV transmission line project, including route permit maps |
|
| Commission Order Issuing a Route Permit for the Black Dog to Savage 115 kV Transmission Line Project | document details | Commission order issuing a route permit for the Black Dog to Savage 115 kV transmission line project. Includes the Commission's order, findings and conclusions, and the route permit with maps |
|
| Proposed Permit for the Black Dog to Savage Project | document details | Department of Commerce, Energy Facility Permitting staff has prepared a proposed permit for the Black Dog to Savage project. The proposed permit is based on the report of the administrative law judge and the record to date. |
|
| Administrative Law Judge's Findings of Fact, Conclusions, and Recommendations | document details | Findings of fact, conclusions, and recommendations from administrative law judge Barbara Neilson. The judge recommends issuing a route permit to Xcel Energy for the project as described in the environmental assessment and with specific mitigation measures. |
|
| Notice of Public Hearing and Availability of the Environmental Assessment for the Black Dog to Savage 115 kV Transmission Line Project | document details | A public hearing will be held on Tuesday, September 11, 2012, at 6:00 p.m. at the Burnsville City Hall in Burnsville, Minn. Public comments on the project will be accepted by the administrative law judge through September 28, 2012. Department of Commerce, Energy Facility Permitting staff has prepared an environmental assessment for the project |
|
| Environment Assessment for the Black Dog to Savage Project | Department of Commerce, Energy Facility Permitting staff has prepared and issued an environmental assessment (EA) for the Black Dog to Savage project. The EA identifies potential impacts and mitigation measures for the project |
|
| Scoping Decision for the Black Dog to Savage Project | document details | The scoping decision identifies the issues and routes that will be evaluated in the environmental assessment (EA) for the project. The EA is anticipated to be completed and available in July 2012 |
|
| Public Comments Received on the Scope of the Environmental Assessment for the Black Dog to Savage Project | Public comments received including (1) Oral comments received at the public meeting on April 18, 2012, and (2) Written comments received during the comment period ending May 4, 2012. |
|
| Public Meetings Handouts | Handouts and informational materials provided to attendees of the April 18, 2012, public meeting in Burnsville |
|
| Notice of Public Information and Scoping Meeting for the Black Dog to Savage 115 kV Transmission Line Project | document details | A public information and scoping meeting will be held on Wednesday, April 18, 2012, at 6:00 p.m. at the Burnsville City Hall in Burnsville, Minn. Public comments on the scope of the environmental assessment that will be prepared for the project will be accepted through May 4, 2012 |
|
| EFP Staff Comments and Recommendations on Application Acceptance | document details | Staff recommends that the Commission accept the route permit application for the Black Dog to Savage project as complete |
|
| Route Permit Application | The route permit application submitted by Xcel Energy to the Minnesota Public Utilities Commission for the Black Dog to Savage 115 kV transmission line project |
|
| Date | Document | On Behalf Of | Description |
| 05/03/13 | 20135-86713-02 | PUC | ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 05/03/13 | 20135-86713-01 | PUC | ORDER--ORDER ISSUING ROUTE PERMIT |
| 03/28/13 | 20133-85120-01 | PUC | BRIEFING PAPERS--APRIL 4, 2013 AGENDA |
| 03/22/13 | 20133-84929-11 | PUC | NOTICE OF COMMISSION MEETING--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 03/22/13 | 20133-84929-04 | PUC | NOTICE OF COMMISSION MEETING |
| 02/28/13 | 20132-84261-01 | DOC EFP | REPLY COMMENTS--ON PROPOSED ROUTE PERMIT |
| 02/25/13 | 20132-84092-01 | PUC | PUBLIC COMMENT |
| 02/19/13 | 20132-83911-01 | NORTHERN STATES POWER COMPANY | COMMENTS--- ON DRAFT ROUTE PERMIT |
| 02/19/13 | 20132-83931-01 | PUC | PUBLIC COMMENT |
| 02/15/13 | 20132-83880-01 | MINNESOTA DEPARTMENT OF NATURAL RESOURCES | COMMENTS |
| 02/04/13 | 20132-83540-01 | PUC | PUBLIC COMMENT |
| 01/29/13 | 20131-83312-01 | PUC | NOTICE OF COMMENT PERIOD--ON PROPOSED ROUTE PERMIT AND RECOMMENDATIONS |
| 01/29/13 | 20131-83312-02 | PUC | NOTICE OF COMMENT PERIOD--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 01/25/13 | 20131-83205-01 | NORTHERN STATES POWER COMPANY | OTHER--APPLICANTS EXCEPTIONS TO ADMINISTRATIVE LAW JUDGES REPORT |
| 01/24/13 | 20131-83120-01 | DOC EFP | COMMENTS--PROPOSED PERMIT AND EXCEPTIONS |
| 01/18/13 | 20131-82911-01 | COURT REPORTER | EXHIBITS - HEARING--MASTER EXHIBIT LIST AS REVISED BY COURT REPORTER ON 1-18-13 |
| 01/18/13 | 20131-82909-01 | COURT REPORTER | EXHIBITS - HEARING--EXHIBITS 21 AND 22 |
| 01/10/13 | 20131-82594-01 | OAH | ORDER--FINDINGS OF FACT, CONCLUSIONS AND RECOMMENDATION |
| 12/04/12 | 201212-81357-40 | PUC | NOTICE--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 12/04/12 | 201212-81357-12 | PUC | NOTICE--POWER PLANT SITING AND TRANSMISSION LINE ROUTING PROGRAM ANNUAL HEARING |
| 11/16/12 | 201211-80763-01 | NORTHERN STATES POWER COMPANY | COMMENTS--BLACK DOG FILING LTR ALJ NO RISE CERTIFICATION BY T MACDONALD |
| 11/02/12 | 201211-80330-01 | NORTHERN STATES POWER COMPANY | REPLY BRIEF--POST-HEARING REPLY BRIEF |
| 11/02/12 | 201211-80313-01 | DOC EFP | REPLY COMMENTS |
| 10/19/12 | 201210-79732-01 | DOC EFP | COMMENTS |
| 10/19/12 | 201210-79754-01 | NORTHERN STATES POWER COMPANY | BRIEF--XCEL BLACK_DOG_FILING_LTR_ALJ POST HEARING BRIEF AND PROPOSED FINDINGS |
| 10/19/12 | 201210-79754-03 | NORTHERN STATES POWER COMPANY | BRIEF--XCEL BLACK_DOG_PROPOSED FINDINGS_OF FACT |
| 10/19/12 | 201210-79754-02 | NORTHERN STATES POWER COMPANY | BRIEF--XCEL BLACK_DOG_POST HEARING_BRIEF WITH ATTACHMENTS 1 AND 2 |
| 10/09/12 | 201210-79362-01 | OAH | COMMENTS--COMMENT RECEIVED FROM THE MET COUNCIL VIA EMAIL ON SEPTEMBER 27, 2012 |
| 10/02/12 | 201210-79147-01 | PUC | PUBLIC COMMENT |
| 09/28/12 | 20129-79074-01 | MINNESOTA DEPARTMENT OF NATURAL RESOURCES | COMMENTS--DNR-COMMENTSBLACKDOG-SAVAGETRANSMISSIONOAH120928 |
| 09/28/12 | 20129-79074-03 | MINNESOTA DEPARTMENT OF NATURAL RESOURCES | COMMENTS--WILDLIFE FRIENDLY EROSION CONTROL V2 |
| 09/28/12 | 20129-79074-02 | MINNESOTA DEPARTMENT OF NATURAL RESOURCES | COMMENTS--DNR-COMMENTSBLACKDOG-SAVAGETRANSMISSIONAPPLICATION120504 |
| 09/24/12 | 20129-78887-01 | COURT REPORTER | EXHIBITS - HEARING--SIGN-IN SHEET |
| 09/24/12 | 20129-78887-02 | COURT REPORTER | EXHIBITS - HEARING--EXHIBIT 20 |
| 09/24/12 | 20129-78891-01 | COURT REPORTER | EXHIBITS - HEARING--MASTER EXHIBIT LIST FROM 9-11-12 PUBLIC HEARING |
| 09/24/12 | 20129-78889-01 | COURT REPORTER | TRANSCRIPTS--PUBLIC HEARING TRANSCRIPT 9-11-12 |
| 09/10/12 | 20129-78519-01 | NORTHERN STATES POWER COMPANY | TESTIMONY--APPLICANTS DIRECT TESTIMONY AND SCHEDULE OF TIMOTHY G ROGERS |
| 09/06/12 | 20129-78425-01 | DOC EFP | NOTICE--BY CERTIFIED MAIL TO LOCAL PUBLIC OFFICIALS OF PUBLIC HEARING AND AVAILABILITY OF ENVIRONMENTAL ASSESSMENT |
| 09/04/12 | 20129-78353-01 | DOC EFP | AFFIDAVIT OF PUBLICATION--FOR NOTICE OF PUBLIC HEARING AND AVAILABILITY OF ENVIRONMENTAL ASSESSMENT |
| 09/04/12 | 20129-78354-01 | DOC EFP | NOTICE--IN EQB MONITOR OF PUBLIC HEARING AND AVAILABILITY OF ENVIRONMENTAL ASSESSMENT |
| 08/17/12 | 20128-77943-01 | DOC EFP | OTHER--CERTIFICATE OF SERVICE - MAILING OF ENVIRONMENTAL ASSESSMENT TO PUBLIC AGENCIES |
| 08/16/12 | 20128-77906-01 | DOC EFP | NOTICE--OF PUBLIC HEARING AND AVAILABILITY OF ENVIRONMENTAL ASSESSMENT |
| 08/15/12 | 20128-77883-02 | DOC EFP | REPORT--ENVIRONMENTAL ASSESSMENT - APPENDICES |
| 08/15/12 | 20128-77883-01 | DOC EFP | REPORT--ENVIRONMENTAL ASSESSMENT - TEXT |
| 06/14/12 | 20126-75607-01 | DOC EFP | AFFIDAVIT OF PUBLICATION--FOR NOTICE OF PUBLIC INFORMATION AND SCOPING MEETING |
| 05/31/12 | 20125-75190-01 | NORTHERN STATES POWER COMPANY | OTHER--XCEL BLACK DOG AFFIDAVIT OF MAILING OF ATTACHED LETTER DATED 05242012 |
| 05/17/12 | 20125-74816-01 | XCEL ENERGY | REQUEST TO UPDATE SERVICE LIST |
| 05/16/12 | 20125-74774-01 | DOC EFP | NOTICE--OF SCOPING DECISION |
| 05/15/12 | 20125-74742-01 | DOC EFP | DECISION--ENVIRONMENTAL ASSESSMENT SCOPING DECISION |
| 05/08/12 | 20125-74535-01 | DOC EFP | COMMENTS--ORAL PUBLIC COMMENTS RECEIVED AT EA SCOPING MEETING, APRIL 18, 2012 |
| 05/08/12 | 20125-74535-02 | DOC EFP | COMMENTS--WRITTEN PUBLIC COMMENTS RECEIVED ON THE SCOPE OF THE EA |
| 05/04/12 | 20125-74466-01 | MNDOT | COMMENTS |
| 04/05/12 | 20124-73369-02 | PUC | MINUTES--MARCH 22, 2012 AGENDA MEETING |
| 03/30/12 | 20123-73166-01 | XCEL ENERGY | NOTICE |
| 03/28/12 | 20123-73044-01 | DOC EFP | NOTICE--OF PUBLIC INFORMATION AND SCOPING MTG |
| 03/23/12 | 20123-72887-01 | PUC | ORDER |
| 03/23/12 | 20123-72887-02 | PUC | ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 03/13/12 | 20123-72554-01 | XCEL ENERGY | AFFIDAVIT OF PUBLICATION |
| 03/13/12 | 20123-72553-01 | DOC EFP | COMMENTS--AND RECOMMENDATIONS OF DOC EFP STAFF ON APPLICATION ACCEPTANCE |
| 03/09/12 | 20123-72405-06 | PUC | NOTICE OF COMMISSION MEETING--MARCH 22, 2012 |
| 02/14/12 | 20122-71490-01 | NORTHERN STATES POWER COMPANY, A MINNESOTA CORPORATION | INITIAL FILING--FILING LETTER AND ROUTE PERMIT APPLICATION |
| 02/14/12 | 20122-71490-02 | NORTHERN STATES POWER COMPANY, A MINNESOTA CORPORATION | INITIAL FILING--APPENDIX A TO ROUTE PERMIT APPLICATION |
| 02/14/12 | 20122-71490-03 | NORTHERN STATES POWER COMPANY, A MINNESOTA CORPORATION | INITIAL FILING--APPENDIX B TO ROUTE PERMIT APPLICATION |
| 02/14/12 | 20122-71490-04 | NORTHERN STATES POWER COMPANY, A MINNESOTA CORPORATION | INITIAL FILING--APPENDICES C TO F TO ROUTE PERMIT APPLICATION |
| 08/03/11 | 20118-64967-01 | XCEL ENERGY | INITIAL FILING--NOTIFICATION OF INTENT TO FILE ROUTE PERMIT |