This webpage contains information and documents related to the permitting of this project by the Minnesota Public Utilities Commission. Every project before the Commission has an electronic docket - an eDocket, a file folder for all of the project.s documents.
Documents for this project are listed below in the File Register, most recent documents first. To view the eDockets record for this project, click on the eDockets link below, or click on the eDockets tab in the File Register. A subset of the record, including key documents with descriptions, is available by clicking on the Energy Facilities tab in the File Register.
For more information about participating in the permitting of this project, click on the How to Participate tab, or contact the state permit manager or public advisor listed below.
Application accepted |
Public meeting |
Scoping decision |
Environmental document available |
Public hearing |
Certificate of Need issued |
Xcel Energy and the City of Glencoe (Applicants) proposes to construct new 69 and 115 kilovolt (kV) transmission lines, and to upgrade an existing 69 kV transmission line (approximately 28 miles total), near the cities of Glencoe, Plato, Norwood Young America and Waconia, in the southwest Twin Cities metro area (see attached map). In addition, the project includes a new substation and modifications to existing substations along the transmission line route.
The Applicants propose to construct the following facilities for which a Certificate of
Need is required:
Xcel Energy will also file an application for a Route Permit with the Commission and believes that it would be efficient to combine the contested case and public hearings in the Certificate of Need and Route Permit proceedings and requests that they be held jointly. See Minn. Stat. § 216B.243, subd. 4; Minn. Rule 7850.2600, Subp.3.
The docket number for the HVTL Route Permit proceeding is E002/TL-10-249.
The Energy Facility Permitting web page for the HVTL Route Permit docket can be found at:
http://mn.gov/commerce/energyfacilities/Docket.html?Id=30371
| Date | Document | Description |
| Commission Order on Certificate of Need for the Xcel Energy Glencoe-Waconia HVTL Upgrade Project | document details | Public Utilities Commission order granting a Certificate of Need in the Matter of the Application of Northern States Power Company d/b/a Xcel Energy and the City of Glencoe for a Certificate of Need for 115kV Transmission Line Upgrades to the Glencoe-Waconia 69 kV System |
|
| Environmental Assessment, Glencoe - Waconia HVTL Project | This Environmental Assessment (EA) provides an overview of the proposed project and its alternatives, the regulatory framework, an analysis of the potential impacts and possible mitigative measures which may minimize the impacts |
|
| Public Notice: Public Hearing and Availability of Environmental Assessment | document details | A public hearing will be held on August 24, 2011, in Norwood Young America concerning a route permit and certificate of need for the proposed 115 kV Glencoe – Waconia transmission line project. Comments may be submitted to the administrative law judge through September 7, 2011. An environmental assessment of the project has been completed and is available for review prior to the hearing. |
|
| Scoping Decision: Xcel Energy's Glencoe-Waconia HVTL Upgrade Project | document details | The Office of Energy Security Director has issued his Scope determining the impacts and alternative routes to be evaluated in the Environmental Assessment for the proposed Glencoe-Waconia HVTL Upgrade Project |
|
| Public Comment on the Scope of the Environmental Document | OES EFP held a Public Information/Scoping meeting on the Glencoe-Waconia project on March 1, 2011; the comment period allowing the public to submit comments on the scope of the EA was open until March 23, 2011. The following comments were received |
|
| Draft Scoping Document: Glencoe - Waconia HVTL Rebuild Project | document details | This scoping document is intended to advise the public of the scoping process and the process for the preparation of the Environmental Review document. The scoping decision will identify for the public the issues and alternatives that the OES has determined are appropriate for inclusion in the environmental review document |
|
| Notice of comment period on CON application for 115 kV HVTL Glencoe-Waconia upgrade project | document details | The Commission accepted Xcel Energy's and the city of Glencoe's Certificate of Need Application for the 115 kV HVTL upgrade to the Glencoe-Waconia 69 kV system as complete and is soliciting written comments on the merits of the proposed project through March 14, 2011, and reply comments through April 4, 2011 |
|
| PUC Order: CON Application Completeness | document details | At its January 27, 2011, meeting, the Commission accepted as complete the Certificate of Need application submitted by Xcel Energy and the city of Glencoe for the Glencoe to Waconia HVTL upgrade project |
|
| Public Information and Environmental Review Scoping Meeting, 115 kV Glencoe to Waconia HVTL Project | document details | The OES will conduct public information and environmental review scoping meetings on March 1, 2011, at the Clay Community Building in Norwood Young America. Comments are accepted until March 23, 2011. |
|
| Notice of PUC Meeting | document details | At its December 21, 2010, meeting, the PUC will consider the items listed on the attached agenda, including timing questions related to the Southwest Twin Cities 115 kV Certificate of Need application |
|
| Public Notice: Comment Period on Completeness of CON Application | document details | Take Note that on November 30, 2010 Northern States Power Company d/b/a Xcel Energy, and the City of Glencoe (the Applicants) filed a certificate of need application with the Minnesota Public Utilities Commission (Commission) for 115 kV transmission line upgrades to the Glenconia - Waconia 69 kV system in Carver and MacLeod Counties. |
|
| CON Application: Southwest Twin Cities 115 kV HVTL Upgrades (Glencoe - Waconia) | Approximately 2.8 miles of new 115 kilovolt (kV) transmission line and upgrade approximately 20.2 miles of 69 kV transmission line to 115 kV capacity (approximately 23 miles total) near the cities of Glencoe, Plato, Norwood Young America and Waconia located southwest of the Twin Cities metro area |
|
| Date | Document | On Behalf Of | Description |
| 01/19/12 | 20121-70440-01 | PUC | MINUTES--OCTOBER 20, 2011 AGENDA MEETING |
| 11/14/11 | 201111-68324-01 | PUC | ORDER |
| 11/14/11 | 201111-68324-02 | PUC | ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 10/13/11 | 201110-67274-01 | PUC | BRIEFING PAPERS--OCTOBER 20, 2011 AGENDA MEETING |
| 10/07/11 | 201110-67106-03 | PUC | NOTICE OF COMMISSION MEETING--OCTOBER 20, 2011 |
| 09/27/11 | 20119-66668-01 | OAH | ORDER--SUMMARY OF TESTIMONY AT PUBLIC HEARING AND SUMMARY OF WRITTEN COMMENTS |
| 09/20/11 | 20119-66504-01 | DOC | COMMENTS--SUPPLEMENTAL |
| 09/06/11 | 20119-66007-01 | NORTHERN STATES POWER COMPANY | LETTER--COMMENTS TO QUESTIONS RAISED AT HEARINGS |
| 08/22/11 | 20118-65595-02 | NORTHERN STATES POWER COMPANY | TESTIMONY--DIRECT TESTIMONY AND SCHEDULES OF TIM ROGERS |
| 08/22/11 | 20118-65595-01 | NORTHERN STATES POWER COMPANY | TESTIMONY--FILING LETTER, CERTIFICATE OF SERVICE AND SERVICE LISTS FOR DIRECT TESTIMONY |
| 08/22/11 | 20118-65595-03 | NORTHERN STATES POWER COMPANY | TESTIMONY--DIRECT TESTIMONY AND SCHEDULES OF SRINIVAS VEMRI |
| 08/22/11 | 20118-65597-01 | NORTHERN STATES POWER COMPANY | OTHER--NORTHERN STATES POWER COMPANY-EXHIBIT LIST AND WITNESS LIST |
| 07/28/11 | 20117-64716-08 | DOC | OTHER--FIG 22 ENVIRONMENTAL FEATURES MAP SEGMENT 6 |
| 07/28/11 | 20117-64714-02 | DOC | OTHER--FIG 12 POLE DIMENSIONS-GEN ROW REQUIREMENTS DOUBLE CIRCUIT |
| 07/28/11 | 20117-64711-10 | DOC | OTHER--FIG 3 PROPOSED HVTL ROUTE-CITY OF GLENCOE ROUTE |
| 07/28/11 | 20117-64711-02 | DOC | OTHER--EA COVER SHEET |
| 07/28/11 | 20117-64716-16 | DOC | OTHER--APPENDIX A EA SCOPING DECISION |
| 07/28/11 | 20117-64716-18 | DOC | OTHER--APPENDIX B SAMPLE HVTL ROUTE PERMIT |
| 07/28/11 | 20117-64716-14 | DOC | OTHER--FIG 25 MAISER ALTERNATIVES AND TH 5 |
| 07/28/11 | 20117-64711-14 | DOC | OTHER--FIG 5 PROPOSED HVTL ROUTE SEGMENT 2 |
| 07/28/11 | 20117-64716-06 | DOC | OTHER--FIG 21 ENVIRONMENTAL FEATURES MAP SEGMENT 5 |
| 07/28/11 | 20117-64714-12 | DOC | OTHER--FIG 17 ENVIRONMENTAL FEATURES MAP SEGMENT 1 |
| 07/28/11 | 20117-64711-06 | DOC | OTHER--FIG 1 GENERAL VICINITY MAP |
| 07/28/11 | 20117-64711-20 | DOC | OTHER--FIG 8 PROPOSED HVTL ROUTE SEGMENT 5 |
| 07/28/11 | 20117-64714-14 | DOC | OTHER--FIG 18 ENVIRONMENTAL FEATURES MAP SEGMENT 2 |
| 07/28/11 | 20117-64711-12 | DOC | OTHER--FIG 4 PROPOSED HVTL ROUTE SEGMENT 1 |
| 07/28/11 | 20117-64716-04 | DOC | OTHER--FIG 20 ENVIRONMENTAL FEATURES MAP SEGMENT 4 |
| 07/28/11 | 20117-64716-02 | DOC | OTHER--FIG 19 ENVIRONMENTAL FEATURES MAP SEGMENT 3 |
| 07/28/11 | 20117-64714-06 | DOC | OTHER--FIG 14 MAP MAISER ALTERNATIVE SEGMENT |
| 07/28/11 | 20117-64714-10 | DOC | OTHER--FIG 16 MAP KRAMER ALTERNATIVE ROUTE AND ROUTE SEGMENT |
| 07/28/11 | 20117-64711-08 | DOC | OTHER--FIG 2 PROPOSED HVTL PROJECT. |
| 07/28/11 | 20117-64711-16 | DOC | OTHER--FIG 6 PROPOSED HVTL ROUTE SEGMENT 3 |
| 07/28/11 | 20117-64714-04 | DOC | OTHER--FIG 13 PHOTO SINGLE AND DOUBLE CIRCUIT |
| 07/28/11 | 20117-64714-08 | DOC | OTHER--FIG 15 MAP WALDRON ALTERNATIVE SEGMENT |
| 07/28/11 | 20117-64674-02 | DOC | NOTICE--PUBLIC HEARING AND AVAILABILITY OF ENVIRONMENTAL ASSESSMENT |
| 07/28/11 | 20117-64716-12 | DOC | OTHER--FIG 24 LAND USE MAP |
| 07/28/11 | 20117-64716-10 | DOC | OTHER--FIG 23 ENVIRONMENTAL FEATURES MAP SEGMENT 7 |
| 07/28/11 | 20117-64711-18 | DOC | OTHER--FIG 7 PROPOSED HVTL ROUTE SEGMENT 4 |
| 07/28/11 | 20117-64711-04 | DOC | OTHER--EA DOCUMENT |
| 04/29/11 | 20114-62077-01 | DOC | COMMENTS |
| 04/22/11 | 20114-61590-01 | VARIOUS PARTIES | PUBLIC COMMENT--AFTERNOON SESSION OF INFORMATION AND SCOPING MTG - MARCH 1, 2011 |
| 04/22/11 | 20114-61590-03 | VARIOUS PARTIES | PUBLIC COMMENT--EVENING SESSION OF INFORMATION AND SCOPING MTG - MARCH 1, 2011 |
| 04/22/11 | 20114-61591-01 | VARIOUS PARTIES | PUBLIC COMMENT |
| 04/04/11 | 20114-60962-01 | DOC OES | DECISION--SIGNED SCOPING DECISION |
| 04/04/11 | 20114-60968-02 | DOC OES | NOTICE--OF SCOPING DECISION AND INTENT TO PREPARE AN ENVIRONMENTAL ASSESSMENT |
| 03/31/11 | 20113-60790-01 | XCEL ENERGY | COMMENTS |
| 03/30/11 | 20113-60718-01 | MARK GIESEKE | PUBLIC COMMENT |
| 03/30/11 | 20113-60728-01 | U.S. FISH AND WILDLIFE SERVICE | PUBLIC COMMENT |
| 03/30/11 | 20113-60721-01 | MARILYN ADAMS MAISER | PUBLIC COMMENT |
| 03/30/11 | 20113-60724-01 | MINNESOTA HISTORICAL SOCIETY | PUBLIC COMMENT |
| 03/30/11 | 20113-60717-02 | MINNESOTA DNR | PUBLIC COMMENT |
| 03/30/11 | 20113-60716-01 | CITY OF CHASKA | PUBLIC COMMENT |
| 03/30/11 | 20113-60725-01 | MNDOT | PUBLIC COMMENT |
| 03/30/11 | 20113-60714-02 | VARIOUS PARTIES | PUBLIC COMMENT--AFTERNOON SESSION-3-1-2011-CLAY COMMUNITY BLDG |
| 03/30/11 | 20113-60720-02 | ROGER AND FRANCES KRAMER | PUBLIC COMMENT |
| 03/30/11 | 20113-60719-02 | MARK AND ANGELA JACQUES | PUBLIC COMMENT |
| 03/30/11 | 20113-60722-01 | ROB AND DIANE MILLER | PUBLIC COMMENT |
| 03/30/11 | 20113-60723-02 | JERRY WALDRON | PUBLIC COMMENT |
| 03/30/11 | 20113-60715-02 | VARIOUS PARTIES | PUBLIC COMMENT--EVENING SESSION-3-1-2011-CLAY COMMUNITY BLDG |
| 03/17/11 | 20113-60423-10 | PUC | MINUTES--DECEMBER 21, 2010 AGENDA MEETING |
| 03/09/11 | 20113-60220-01 | PUC | NOTICE OF EXTENSIONVARIANCE |
| 03/07/11 | 20113-60173-01 | DOC OES | EXTENSIONVARIANCE REQUEST |
| 02/23/11 | 20112-59790-01 | NORTHERN STATES POWER COMPANY AND CITY OF GLENCOE | OTHER--CERTIFICATE OF NEED NOTICE PLAN COMPLIANCE |
| 02/18/11 | 20112-59664-01 | PUC | MINUTES--JANUARY 27, 2011 AGENDA MEETING |
| 02/11/11 | 20112-59463-01 | PUC | NOTICE OF COMMENT PERIOD--SOLICITING COMMENTS |
| 02/02/11 | 20112-59142-02 | PUC | ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 02/02/11 | 20112-59142-01 | PUC | ORDER--FINDING APPLICATION COMPLETE AND INITIATING INFORMAL REVIEW PROCESS |
| 02/01/11 | 20112-59103-02 | DOC OES | NOTICE--OF PUBLIC INFO AND SCOPING MEETINGS |
| 01/26/11 | 20111-58893-01 | PUC | BRIEFING PAPERS--REVISED DECISION OPTIONS JANUARY 27, 2011 AGENDA MEETING |
| 01/25/11 | 20111-58862-01 | NORTHERN STATES POWER COMPANY | REQUEST TO UPDATE SERVICE LIST--ADD, HERRING, KOELLER, SIMPSON |
| 01/20/11 | 20111-58706-01 | PUC | BRIEFING PAPERS--JANUARY 27, 2011 AGENDA MEETING |
| 01/14/11 | 20111-58536-06 | PUC | NOTICE OF COMMISSION MEETING--JAN. 27, 2011 |
| 01/14/11 | 20111-58554-01 | PUC | NOTICE OF COMMISSION MEETING--CORRECTED NOTICE OF COMMISSION MEETING 1-27-2011 |
| 01/11/11 | 20111-58410-01 | NORTHERN STATES POWER COMPANY | OTHER--SUPPLEMENTAL FILING TO CERTIFICATE OF NEED APPLICATION |
| 01/11/11 | 20111-58416-01 | NORTHERN STATES POWER COMPANY | REPLY COMMENTS--ON COMPLETENESS OF THE APPLICATION FOR A CERTIFICATE OF NEED |
| 12/29/10 | 201012-57955-01 | DOC OES | OTHER--COMPLETENESS REVIEW |
| 12/23/10 | 201012-57817-01 | PUC | ORDER--VARYING TIME |
| 12/23/10 | 201012-57817-02 | PUC | ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 12/16/10 | 201012-57542-01 | PUC | BRIEFING PAPERS--DECEMBER 21, 2010 AGENDA MEETING |
| 12/09/10 | 201012-57319-07 | PUC | NOTICE OF COMMISSION MEETING--DECEMBER 21, 2010 |
| 12/03/10 | 201012-57156-01 | PUC | NOTICE OF COMMENT PERIOD--REVISED |
| 12/03/10 | 201012-57142-01 | PUC | NOTICE OF COMMENT PERIOD--INCORRECT DOCKET # OF 10-694 ON NOTICE, SEE REVISED |
| 12/03/10 | 201012-57298-01 | XCEL ENERGY | OTHER--FILING FEE |
| 11/30/10 | 201011-56924-01 | NORTHERN STATES POWER COMPANY AND CITY OF GLENCOE | INITIAL FILING--COVER LETTER, FILING SUMMARY, CERTIFICATE OF SERVICE |
| 11/30/10 | 201011-56924-02 | NORTHERN STATES POWER COMPANY AND CITY OF GLENCOE | INITIAL FILING--FILING SUMMARY AND CERTIFICATE OF SERVICE |
| 11/30/10 | 201011-56924-03 | NORTHERN STATES POWER COMPANY AND CITY OF GLENCOE | INITIAL FILING--CERTIFICATE OF NEED APPLICATION |
| 11/30/10 | 201011-56924-04 | NORTHERN STATES POWER COMPANY AND CITY OF GLENCOE | INITIAL FILING--APPENDIX A, APPENDIX B, APPENDIX C AND APPENDIX D |
| 02/03/10 | 20102-46741-04 | PUC | MINUTES--JANUARY 21, 2010 AGENDA MEETING |
| 01/26/10 | 20101-46419-01 | PUC | ORDER |
| 01/08/10 | 20101-45783-06 | PUC | NOTICE OF COMMISSION MEETING--10-DAY NOTICE - 1-21-2010 |
| 12/30/09 | 200912-45530-01 | XCEL ENERGY | REPLY COMMENTS |
| 12/22/09 | 200912-45309-01 | DOC-OES | COMMENTS |
| 12/02/09 | 200912-44654-02 | XCEL ENERGY | INITIAL FILING--PLAN PT2 OF 2-UPGRADE THE OLENCOE -- WACONIA TRANSMISSION LINE |
| 12/02/09 | 200912-44654-01 | XCEL ENERGY | INITIAL FILING--PLAN PT 1 OF 2-UPGRADE THE OLENCOE -- WACONIA TRANSMISSION LINE |