Skip to content

This webpage contains information and documents related to the permitting of this project by the Minnesota Public Utilities Commission. Every project before the Commission has an electronic docket - an eDocket, a file folder for all of the project.s documents.

Documents for this project are listed below in the File Register, most recent documents first. To view the eDockets record for this project, click on the eDockets link below, or click on the eDockets tab in the File Register. A subset of the record, including key documents with descriptions, is available by clicking on the Energy Facilities tab in the File Register.

For more information about participating in the permitting of this project, click on the How to Participate tab, or contact the state permit manager or public advisor listed below.

Project Docket

Docket No E002/CN-09-1390
Project name Southwest Twin Cities 115 kV HVTL Upgrades (Glencoe - Waconia) CON
Applicant NSP, dba Xcel Energy
Description Certificate of Need: Approximately 2.8 miles of new 115 kilovolt (kV) transmission line and upgrade approximately 20.2 miles of 69 kV transmission line to 115 kV capacity (approximately 23 miles total) near the cities of Glencoe, Plato, Norwood Young America and Waconia located southwest of the Twin Cities metro area
Subjects Environmental policy; Electric power transmission; Environmental assessment
Location Carver County; McLeod County; Twin Cities Metropolitan Area
Docket created: November 30, 2010
Status:
 
02-2-2011
Application accepted
 
03-1-2011
Public meeting
 
04-1-2011
Scoping decision
 
07-20-2011
Environmental document available
 
08-24-2011
Public hearing
 
11-14-2011
Certificate of Need issued
 
Project closed
 
Docket closed
eDockets 09-1390
Mailing list • Register (if you have never established an account) Or
• Sign on (if you already have established an account for other mailing lists)
Project Summary

Xcel Energy and the City of Glencoe (Applicants) proposes to construct new 69 and 115 kilovolt (kV) transmission lines, and to upgrade an existing 69 kV transmission line (approximately 28 miles total), near the cities of Glencoe, Plato, Norwood Young America and Waconia, in the southwest Twin Cities metro area (see attached map).  In addition, the project includes a new substation and modifications to existing substations along the transmission line route.

The Applicants propose to construct the following facilities for which a Certificate of

Need is required:

  • Construct a new 115 kV Diamond Substation in Glencoe and approximately 5 miles of new 115 kV transmission line between the existing Armstrong Substation and the new Diamond Substation.
  • Upgrade approximately 4 miles of 69 kV transmission line to 115/69 kV double circuit from the proposed Diamond Substation to the existing Plato Substation.
  • Expand the existing Plato Substation to upgrade the 69 kV distribution load to 115 kV, and to install a capacitor bank on the 69 kV transmission line.
  • Upgrade approximately 10 miles of 69 kV transmission line to 115 kV capacity between the Plato Substation, the Young America Substation and the West Waconia Substation.
  • Construct approximately 1 mile of new 115 kV transmission line along Highway 5 on the west side of the City of Norwood Young America. This new segment is needed to avoid having to build the 115 kV line into the developed areas of the City of Norwood Young America.
  • Upgrade approximately 1 mile of existing 69 kV transmission to 115 kV from the existing West Waconia Substation along Highway 5.
  • Construct approximately 2 miles of new 69 kV transmission line from Highway 5 to the existing Augusta 69 kV transmission line. This section would be built to double circuit standard to accommodate a future 115 kV transmission line, along with the proposed 69 kV line.
  • Upgrade approximately 7 miles of existing 69 kV transmission line to 115 kV capacity from the Waconia Tap to just short of the Augusta Substation.

Xcel Energy will also file an application for a Route Permit with the Commission and believes that it would be efficient to combine the contested case and public hearings in the Certificate of Need and Route Permit proceedings and requests that they be held jointly. See Minn. Stat. 216B.243, subd. 4; Minn. Rule 7850.2600, Subp.3.

The docket number for the HVTL Route Permit proceeding is E002/TL-10-249.

The Energy Facility Permitting web page for the HVTL Route Permit docket can be found at:

http://mn.gov/commerce/energyfacilities/Docket.html?Id=30371

File Register
DateDocumentDescription
11/14/11 Commission Order on Certificate of Need for the Xcel Energy Glencoe-Waconia HVTL Upgrade Project | document details
Public Utilities Commission order granting a Certificate of Need in the Matter of the Application of Northern States Power Company d/b/a Xcel Energy and the City of Glencoe for a Certificate of Need for 115kV Transmission Line Upgrades to the Glencoe-Waconia 69 kV System
07/26/11 Environmental Assessment, Glencoe - Waconia HVTL Project
This Environmental Assessment (EA) provides an overview of the proposed project and its alternatives, the regulatory framework, an analysis of the potential impacts and possible mitigative measures which may minimize the impacts
07/26/11 Public Notice: Public Hearing and Availability of Environmental Assessment | document details
A public hearing will be held on August 24, 2011, in Norwood Young America concerning a route permit and certificate of need for the proposed 115 kV Glencoe Waconia transmission line project. Comments may be submitted to the administrative law judge through September 7, 2011. An environmental assessment of the project has been completed and is available for review prior to the hearing.
04/01/11 Scoping Decision: Xcel Energy's Glencoe-Waconia HVTL Upgrade Project | document details
The Office of Energy Security Director has issued his Scope determining the impacts and alternative routes to be evaluated in the Environmental Assessment for the proposed Glencoe-Waconia HVTL Upgrade Project
03/04/11 Public Comment on the Scope of the Environmental Document
OES EFP held a Public Information/Scoping meeting on the Glencoe-Waconia project on March 1, 2011; the comment period allowing the public to submit comments on the scope of the EA was open until March 23, 2011. The following comments were received
02/11/11 Draft Scoping Document: Glencoe - Waconia HVTL Rebuild Project | document details
This scoping document is intended to advise the public of the scoping process and the process for the preparation of the Environmental Review document. The scoping decision will identify for the public the issues and alternatives that the OES has determined are appropriate for inclusion in the environmental review document
02/11/11 Notice of comment period on CON application for 115 kV HVTL Glencoe-Waconia upgrade project | document details
The Commission accepted Xcel Energy's and the city of Glencoe's Certificate of Need Application for the 115 kV HVTL upgrade to the Glencoe-Waconia 69 kV system as complete and is soliciting written comments on the merits of the proposed project through March 14, 2011, and reply comments through April 4, 2011
02/02/11 PUC Order: CON Application Completeness | document details
At its January 27, 2011, meeting, the Commission accepted as complete the Certificate of Need application submitted by Xcel Energy and the city of Glencoe for the Glencoe to Waconia HVTL upgrade project
02/01/11 Public Information and Environmental Review Scoping Meeting, 115 kV Glencoe to Waconia HVTL Project | document details
The OES will conduct public information and environmental review scoping meetings on March 1, 2011, at the Clay Community Building in Norwood Young America. Comments are accepted until March 23, 2011.
12/09/10 Notice of PUC Meeting | document details
At its December 21, 2010, meeting, the PUC will consider the items listed on the attached agenda, including timing questions related to the Southwest Twin Cities 115 kV Certificate of Need application
12/03/10 Public Notice: Comment Period on Completeness of CON Application | document details
Take Note that on November 30, 2010 Northern States Power Company d/b/a Xcel Energy, and the City of Glencoe (the Applicants) filed a certificate of need application with the Minnesota Public Utilities Commission (Commission) for 115 kV transmission line upgrades to the Glenconia - Waconia 69 kV system in Carver and MacLeod Counties.
11/30/10 CON Application: Southwest Twin Cities 115 kV HVTL Upgrades (Glencoe - Waconia)
Approximately 2.8 miles of new 115 kilovolt (kV) transmission line and upgrade approximately 20.2 miles of 69 kV transmission line to 115 kV capacity (approximately 23 miles total) near the cities of Glencoe, Plato, Norwood Young America and Waconia located southwest of the Twin Cities metro area
Date Document On Behalf Of Description
01/19/12 20121-70440-01 PUC MINUTES--OCTOBER 20, 2011 AGENDA MEETING
11/14/11 201111-68324-01 PUC ORDER
11/14/11 201111-68324-02 PUC ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST
10/13/11 201110-67274-01 PUC BRIEFING PAPERS--OCTOBER 20, 2011 AGENDA MEETING
10/07/11 201110-67106-03 PUC NOTICE OF COMMISSION MEETING--OCTOBER 20, 2011
09/27/11 20119-66668-01 OAH ORDER--SUMMARY OF TESTIMONY AT PUBLIC HEARING AND SUMMARY OF WRITTEN COMMENTS
09/20/11 20119-66504-01 DOC COMMENTS--SUPPLEMENTAL
09/06/11 20119-66007-01 NORTHERN STATES POWER COMPANY LETTER--COMMENTS TO QUESTIONS RAISED AT HEARINGS
08/22/11 20118-65595-02 NORTHERN STATES POWER COMPANY TESTIMONY--DIRECT TESTIMONY AND SCHEDULES OF TIM ROGERS
08/22/11 20118-65595-01 NORTHERN STATES POWER COMPANY TESTIMONY--FILING LETTER, CERTIFICATE OF SERVICE AND SERVICE LISTS FOR DIRECT TESTIMONY
08/22/11 20118-65595-03 NORTHERN STATES POWER COMPANY TESTIMONY--DIRECT TESTIMONY AND SCHEDULES OF SRINIVAS VEMRI
08/22/11 20118-65597-01 NORTHERN STATES POWER COMPANY OTHER--NORTHERN STATES POWER COMPANY-EXHIBIT LIST AND WITNESS LIST
07/28/11 20117-64716-08 DOC OTHER--FIG 22 ENVIRONMENTAL FEATURES MAP SEGMENT 6
07/28/11 20117-64714-02 DOC OTHER--FIG 12 POLE DIMENSIONS-GEN ROW REQUIREMENTS DOUBLE CIRCUIT
07/28/11 20117-64711-10 DOC OTHER--FIG 3 PROPOSED HVTL ROUTE-CITY OF GLENCOE ROUTE
07/28/11 20117-64711-02 DOC OTHER--EA COVER SHEET
07/28/11 20117-64716-16 DOC OTHER--APPENDIX A EA SCOPING DECISION
07/28/11 20117-64716-18 DOC OTHER--APPENDIX B SAMPLE HVTL ROUTE PERMIT
07/28/11 20117-64716-14 DOC OTHER--FIG 25 MAISER ALTERNATIVES AND TH 5
07/28/11 20117-64711-14 DOC OTHER--FIG 5 PROPOSED HVTL ROUTE SEGMENT 2
07/28/11 20117-64716-06 DOC OTHER--FIG 21 ENVIRONMENTAL FEATURES MAP SEGMENT 5
07/28/11 20117-64714-12 DOC OTHER--FIG 17 ENVIRONMENTAL FEATURES MAP SEGMENT 1
07/28/11 20117-64711-06 DOC OTHER--FIG 1 GENERAL VICINITY MAP
07/28/11 20117-64711-20 DOC OTHER--FIG 8 PROPOSED HVTL ROUTE SEGMENT 5
07/28/11 20117-64714-14 DOC OTHER--FIG 18 ENVIRONMENTAL FEATURES MAP SEGMENT 2
07/28/11 20117-64711-12 DOC OTHER--FIG 4 PROPOSED HVTL ROUTE SEGMENT 1
07/28/11 20117-64716-04 DOC OTHER--FIG 20 ENVIRONMENTAL FEATURES MAP SEGMENT 4
07/28/11 20117-64716-02 DOC OTHER--FIG 19 ENVIRONMENTAL FEATURES MAP SEGMENT 3
07/28/11 20117-64714-06 DOC OTHER--FIG 14 MAP MAISER ALTERNATIVE SEGMENT
07/28/11 20117-64714-10 DOC OTHER--FIG 16 MAP KRAMER ALTERNATIVE ROUTE AND ROUTE SEGMENT
07/28/11 20117-64711-08 DOC OTHER--FIG 2 PROPOSED HVTL PROJECT.
07/28/11 20117-64711-16 DOC OTHER--FIG 6 PROPOSED HVTL ROUTE SEGMENT 3
07/28/11 20117-64714-04 DOC OTHER--FIG 13 PHOTO SINGLE AND DOUBLE CIRCUIT
07/28/11 20117-64714-08 DOC OTHER--FIG 15 MAP WALDRON ALTERNATIVE SEGMENT
07/28/11 20117-64674-02 DOC NOTICE--PUBLIC HEARING AND AVAILABILITY OF ENVIRONMENTAL ASSESSMENT
07/28/11 20117-64716-12 DOC OTHER--FIG 24 LAND USE MAP
07/28/11 20117-64716-10 DOC OTHER--FIG 23 ENVIRONMENTAL FEATURES MAP SEGMENT 7
07/28/11 20117-64711-18 DOC OTHER--FIG 7 PROPOSED HVTL ROUTE SEGMENT 4
07/28/11 20117-64711-04 DOC OTHER--EA DOCUMENT
04/29/11 20114-62077-01 DOC COMMENTS
04/22/11 20114-61590-01 VARIOUS PARTIES PUBLIC COMMENT--AFTERNOON SESSION OF INFORMATION AND SCOPING MTG - MARCH 1, 2011
04/22/11 20114-61590-03 VARIOUS PARTIES PUBLIC COMMENT--EVENING SESSION OF INFORMATION AND SCOPING MTG - MARCH 1, 2011
04/22/11 20114-61591-01 VARIOUS PARTIES PUBLIC COMMENT
04/04/11 20114-60962-01 DOC OES DECISION--SIGNED SCOPING DECISION
04/04/11 20114-60968-02 DOC OES NOTICE--OF SCOPING DECISION AND INTENT TO PREPARE AN ENVIRONMENTAL ASSESSMENT
03/31/11 20113-60790-01 XCEL ENERGY COMMENTS
03/30/11 20113-60718-01 MARK GIESEKE PUBLIC COMMENT
03/30/11 20113-60728-01 U.S. FISH AND WILDLIFE SERVICE PUBLIC COMMENT
03/30/11 20113-60721-01 MARILYN ADAMS MAISER PUBLIC COMMENT
03/30/11 20113-60724-01 MINNESOTA HISTORICAL SOCIETY PUBLIC COMMENT
03/30/11 20113-60717-02 MINNESOTA DNR PUBLIC COMMENT
03/30/11 20113-60716-01 CITY OF CHASKA PUBLIC COMMENT
03/30/11 20113-60725-01 MNDOT PUBLIC COMMENT
03/30/11 20113-60714-02 VARIOUS PARTIES PUBLIC COMMENT--AFTERNOON SESSION-3-1-2011-CLAY COMMUNITY BLDG
03/30/11 20113-60720-02 ROGER AND FRANCES KRAMER PUBLIC COMMENT
03/30/11 20113-60719-02 MARK AND ANGELA JACQUES PUBLIC COMMENT
03/30/11 20113-60722-01 ROB AND DIANE MILLER PUBLIC COMMENT
03/30/11 20113-60723-02 JERRY WALDRON PUBLIC COMMENT
03/30/11 20113-60715-02 VARIOUS PARTIES PUBLIC COMMENT--EVENING SESSION-3-1-2011-CLAY COMMUNITY BLDG
03/17/11 20113-60423-10 PUC MINUTES--DECEMBER 21, 2010 AGENDA MEETING
03/09/11 20113-60220-01 PUC NOTICE OF EXTENSIONVARIANCE
03/07/11 20113-60173-01 DOC OES EXTENSIONVARIANCE REQUEST
02/23/11 20112-59790-01 NORTHERN STATES POWER COMPANY AND CITY OF GLENCOE OTHER--CERTIFICATE OF NEED NOTICE PLAN COMPLIANCE
02/18/11 20112-59664-01 PUC MINUTES--JANUARY 27, 2011 AGENDA MEETING
02/11/11 20112-59463-01 PUC NOTICE OF COMMENT PERIOD--SOLICITING COMMENTS
02/02/11 20112-59142-02 PUC ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST
02/02/11 20112-59142-01 PUC ORDER--FINDING APPLICATION COMPLETE AND INITIATING INFORMAL REVIEW PROCESS
02/01/11 20112-59103-02 DOC OES NOTICE--OF PUBLIC INFO AND SCOPING MEETINGS
01/26/11 20111-58893-01 PUC BRIEFING PAPERS--REVISED DECISION OPTIONS JANUARY 27, 2011 AGENDA MEETING
01/25/11 20111-58862-01 NORTHERN STATES POWER COMPANY REQUEST TO UPDATE SERVICE LIST--ADD, HERRING, KOELLER, SIMPSON
01/20/11 20111-58706-01 PUC BRIEFING PAPERS--JANUARY 27, 2011 AGENDA MEETING
01/14/11 20111-58536-06 PUC NOTICE OF COMMISSION MEETING--JAN. 27, 2011
01/14/11 20111-58554-01 PUC NOTICE OF COMMISSION MEETING--CORRECTED NOTICE OF COMMISSION MEETING 1-27-2011
01/11/11 20111-58410-01 NORTHERN STATES POWER COMPANY OTHER--SUPPLEMENTAL FILING TO CERTIFICATE OF NEED APPLICATION
01/11/11 20111-58416-01 NORTHERN STATES POWER COMPANY REPLY COMMENTS--ON COMPLETENESS OF THE APPLICATION FOR A CERTIFICATE OF NEED
12/29/10 201012-57955-01 DOC OES OTHER--COMPLETENESS REVIEW
12/23/10 201012-57817-01 PUC ORDER--VARYING TIME
12/23/10 201012-57817-02 PUC ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST
12/16/10 201012-57542-01 PUC BRIEFING PAPERS--DECEMBER 21, 2010 AGENDA MEETING
12/09/10 201012-57319-07 PUC NOTICE OF COMMISSION MEETING--DECEMBER 21, 2010
12/03/10 201012-57156-01 PUC NOTICE OF COMMENT PERIOD--REVISED
12/03/10 201012-57142-01 PUC NOTICE OF COMMENT PERIOD--INCORRECT DOCKET # OF 10-694 ON NOTICE, SEE REVISED
12/03/10 201012-57298-01 XCEL ENERGY OTHER--FILING FEE
11/30/10 201011-56924-01 NORTHERN STATES POWER COMPANY AND CITY OF GLENCOE INITIAL FILING--COVER LETTER, FILING SUMMARY, CERTIFICATE OF SERVICE
11/30/10 201011-56924-02 NORTHERN STATES POWER COMPANY AND CITY OF GLENCOE INITIAL FILING--FILING SUMMARY AND CERTIFICATE OF SERVICE
11/30/10 201011-56924-03 NORTHERN STATES POWER COMPANY AND CITY OF GLENCOE INITIAL FILING--CERTIFICATE OF NEED APPLICATION
11/30/10 201011-56924-04 NORTHERN STATES POWER COMPANY AND CITY OF GLENCOE INITIAL FILING--APPENDIX A, APPENDIX B, APPENDIX C AND APPENDIX D
02/03/10 20102-46741-04 PUC MINUTES--JANUARY 21, 2010 AGENDA MEETING
01/26/10 20101-46419-01 PUC ORDER
01/08/10 20101-45783-06 PUC NOTICE OF COMMISSION MEETING--10-DAY NOTICE - 1-21-2010
12/30/09 200912-45530-01 XCEL ENERGY REPLY COMMENTS
12/22/09 200912-45309-01 DOC-OES COMMENTS
12/02/09 200912-44654-02 XCEL ENERGY INITIAL FILING--PLAN PT2 OF 2-UPGRADE THE OLENCOE -- WACONIA TRANSMISSION LINE
12/02/09 200912-44654-01 XCEL ENERGY INITIAL FILING--PLAN PT 1 OF 2-UPGRADE THE OLENCOE -- WACONIA TRANSMISSION LINE