This webpage contains information and documents related to the permitting of this project by the Minnesota Public Utilities Commission. Every project before the Commission has an electronic docket - an eDocket, a file folder for all of the project.s documents.
Documents for this project are listed below in the File Register, most recent documents first. To view the eDockets record for this project, click on the eDockets link below, or click on the eDockets tab in the File Register. A subset of the record, including key documents with descriptions, is available by clicking on the Energy Facilities tab in the File Register.
For more information about participating in the permitting of this project, click on the How to Participate tab, or contact the state permit manager or public advisor listed below.
Application accepted |
Public meeting |
Scoping decision |
Draft EIS available |
Public meeting |
Public hearing |
Final EIS available |
Permit Decision |
On December 29, 2008, Great River Energy and Xcel Energy (permittees) applied to the Minnesota Public Utitilities Commission for a route permit for the Brookings County to Hampton 345 kV transmission line project. The permittees proposed to construct and operate a 345 kV transmission line, approximately 237 miles long, beginning at the state's western border near Hendricks, Minnesota, and ending south of the Twin Cities metro area near Hampton, Minnesota. The project is one of four projects proposed in Minnesota as part of the CapX2020 transmission initiative.
The route application was reviewed under the full permitting process of the Power Plant Siting Act. Upon completion of a draft and final environmental impact statement (EIS) and a public hearing process, the Commission issued a route permit for segments 1, 2, 3, 5, and 6 of the project on September 14, 2010. After additional public hearings, the Commission issued a route permit for segment 4 of the project on March 1, 2011. Since issuing the route permits, the Commission has amended the permits for select areas of the route to address engineering constraints and landowner concerns and to clarify sections of the permits which were unclear.
Construction has commenced along several segments of the route (May 2013):
| Primary Documents | ||
| Date | Document | Description |
| Commission Order Approving Minor Alteration and Issuing Permit Amendment (Amendment #4) | document details | Commission order issuing a permit amendment for the Brookings to Hampton project. The amendment addresses a change in the route between structures 243 and 250 in segment 3 of the project |
|
| Commission Order Approving Minor Alteration and Issuing Permit Amendment (Amendment #3) | document details | Commission order issuing a permit amendment for the Brookings to Hampton project. The amendment addresses the use of quadruple circuit specialty structures for the project |
|
| Commission Order Approving Minor Alterations and Issuing Permit Amendment (Amendment #2) | document details | Commission order issuing a permit amendment for the Brookings to Hampton project. The amendment addresses modifications in segment 3 of the project related to engineering constraints and landowner concerns |
|
| Commission Order Approving Minor Alterations and Issuing Permit Amendment (Amendment #1) | document details | Commission order issuing a permit amendment for the Brookings to Hampton project. The amendment addresses new maps, the size and location of the Hampton substation, and the number of conductors spanning Interstate 35 |
|
| Route Permit for the Brookings to Hampton 345 kV Transmission Line Project | document details | The Commission's route permit addendum for segment 4 of the Brookings to Hampton project, including links to route permit maps |
|
| Route Permit for the Brookings to Hampton 345 kV Transmission Line Project | document details | The Commission's route permit for segments 1, 2, 3, 5, and 6 of the Brookings to Hampton project, including links to route permit maps |
|
| Brookings-Hampton Transmission Project Final Environmental Impact Statement | The Final EIS responds to timely substantive comments received on the Draft EIS consistent with the Scoping Decision Document. The Final EIS also contains corrections/revisions to the Draft EIS. The Draft EIS and Final EIS serve as the complete EIS for the proposed project |
|
| Date | Document | Description |
| Commission Order Approving Route Alignment North of County Road 62 | document details | Commission order approving and reaffirming a route alignment north of County Road 62 between proposed structure 0960-103 and the Chub Lake substation |
|
| EFP Comments and Recommendations on the Appropriate Alignment for the Brookings to Hampton Project near County Road 62 | document details | EFP staff comments on the appropriate alignment for the Brookings to Hampton project from proposed structure 0960-103 to the Chub Lake substation |
|
| Commission Order Approving Minor Alteration and Issuing Permit Amendment (Amendment #4) | document details | Commission order issuing a permit amendment for the Brookings to Hampton project. The amendment addresses a change in the route between structures 243 and 250 in segment 3 of the project |
|
| Commission Order Approving Minor Alteration and Issuing Permit Amendment (Amendment #3) | document details | Commission order issuing a permit amendment for the Brookings to Hampton project. The amendment addresses the use of quadruple circuit specialty structures for the project |
|
| Commission Order Approving Minor Alterations and Issuing Permit Amendment (Amendment #2) | document details | Commission order issuing a permit amendment for the Brookings to Hampton project. The amendment addresses modifications in segment 3 of the project related to engineering constraints and landowner concerns |
|
| Commission Order Approving Minor Alterations and Issuing Permit Amendment (Amendment #1) | document details | Commission order issuing a permit amendment for the Brookings to Hampton project. The amendment addresses new maps, the size and location of the Hampton substation, and the number of conductors spanning Interstate 35 |
|
| EFP Comments and Recommendations on the requested Minor Alterations to the Brookings to Hampton 345 kV Transmission Line Route Permit (2 MB) | document details | EFP staff has submitted comments and recommendations to the Commission concerning the requested route permit changes. The requests will be considered by the Commission at the February 23, 2012, Agenda Meeting |
|
| Notice of Minor Alteration Application and Comment Period (48 KB) | document details | Great River Energy and Northern States Power have applied to the Public Utilities Commission for three minor alterations to the Brookings to Hampton 345 kV transmission line project. Comments are being accepted through January 31, 2012 |
|
| Application for Approval of Minor Alteration (4.1 MB) | document details | Great River Energy and Xcel Energy have applied to the Public Utilities Commission for three minor alterations to the Brookings to Hampton 345 kV transmission line project |
|
| Route Permit for the Brookings to Hampton 345 kV Transmission Line Project | document details | The Commission's route permit addendum for segment 4 of the Brookings to Hampton project, including links to route permit maps |
|
| Order Granting Route Permit for Remanded Segment of Route (529 KB) | document details | Commission order granting a route permit for the remanded portion (Section 4) of the Brookings to Hampton 345 kV Transmission Line |
|
| Comments and Recommendations on Remanded Portion of the Brookings to Hampton 345kV Transmission Line (1.4 MB) | document details | EFP staff Comments and Recommendations proposing Findings of Fact, Route Permit Addendum and Maps for segment 4 of the Brookings to Hampton 345kV Transmission Line |
|
| Order Denying Petition for Reconsideration (127 KB) | document details | The Commission on October 29, 2010 issued an Order denying a petition for reconsideration |
|
| Route Permit for the Brookings to Hampton 345 kV Transmission Line Project | document details | The Commission's route permit for segments 1, 2, 3, 5, and 6 of the Brookings to Hampton project, including links to route permit maps |
|
| Order Granting Route Permit (1.4 MB) | document details | Commission order granting a route permit for Sections 1-3, 5, and 6 of the Brookings to Hampton 345 kV Transmission Line |
|
| Notice of Additional Public Hearings on the Proposed Brookings to Hampton 345 kV Transmission Line Project (141 KB) | document details | Additional public hearings strictly limited to the segments that would connect the Cedar Mountain Substation in Renville County to the Helena Substation in Le Sueur County will be held on October 4 and 5, 2010, in the cities of Arlington, Belle Plaine, and Le Sueur. Comments may be submitted to the administrative law judge through October 18, 2010 |
|
| EFP Comments and Recommendations to the PUC on a Route Permit | EFP recommends issuing a Route Permit for the Brookings to Hampton 345 kV Transmission Project |
|
| ALJ Report for the Brookings to Hampton 345 kV Project | document details | Judge's Summary of Testimony; Findings of Fact, Conclusions and Recommendation for the HVTL Route Permit |
|
| Brookings-Hampton Transmission Project Final Environmental Impact Statement | The Final EIS responds to timely substantive comments received on the Draft EIS consistent with the Scoping Decision Document. The Final EIS also contains corrections/revisions to the Draft EIS. The Draft EIS and Final EIS serve as the complete EIS for the proposed project |
|
| Notice of Comment Period Extension for Proposed Brookings to Hampton 345 kV Transmission Line | Judge Richard Luis has extended the public hearing comment period for the Brookings to Hampton transmission line project until February 8, 2010. Comments may be submitted by U.S. Mail, Fax or email and should include the Office of Administrative Hearings Docket Number: 7-2500-20283-2. Mailed comments must be postmarked by this date. Faxed and emailed comments must be received by 4:30 PM on this date. |
|
| Notice of Public Hearing on the Proposed Brookings to Hampton 345 kV Transmission Line (45 KB) | document details | The Office of Administrative Hearings will conduct Public Hearings at various locations along the length of the proposed project from November 30, 2009, to December 18, 2009. Public comments can be submitted to the Judge through 4:30 p.m. on January 15, 2010 |
|
| Notice of Availability of Brookings to Hampton 345 kV Draft Environmental Impact Statement and Notice of Public Information Meetings | document details | The OES announces the availability of the Draft Environmental Impact Statement (EIS) along with the locations and dates of upcoming Public Information Meetings. Comments on the DEIS will be accepted through November 30, 2009 |
|
| Draft EIS of the Brookings to Hampton 345 kV Transmission Line Project | The Draft EIS discusses the potential human and environmental impacts of the proposed project and evaluates 26 route alignment alternatives and 47 route segment alternatives as identified in the EIS Scoping Decision Document |
|
| Landowner Letter (59 KB) | document details | A letter notifying landowners of alternative route segments identified in the EIS scoping document and being evaluated in the EIS that may directly or indirectly affect their property |
|
| Scoping Decision Document | document details | The Director of the Office of Energy Security Scoping Decision Document on the content of the EIS for the proposed Brookings – Hampton 345 kV transmission line project (6.3 MB) |
|
| Notice of Scoping Decision (34 KB) | document details | Notice of scoping decision and Intent to prepare an EIS for the Brookings to Hampton 345 kV project |
|
| Public Scoping Comments (474 KB) | document details | The file contains the public comments received via mail, email, and online submission during the scoping period. There is a great amount of data within the file, including links to the actual comment letters. You may need to utilize the zoom and scroll features in Adobe to view specifics on each page. |
|
| Public Comments and Suggested Alternative Routes Map (Google Earth 2009) | The following file shows the applicant's preferred, alternative, and previously considered routes along with routes suggested though public comment and the two Advisory Task Forces. The file is to be used in conjunction with the Google Earth application. Just click on the file and if you do not already have Google Earth your computer should automatically prompt you to load the program |
|
| Public Scoping Meeting Oral Comments (2 MB) | document details | Oral public comments from the 12 public scoping meetings conducted for the proposed Brookings-Hampton 345 kV project |
|
| Minnesota River Crossings to New Prague Advisory Task Force Report and Supporting Materials | A report of the Minnesota River Crossings to New Prague Advisory Task Force's work, including route alternatives to study in the environmental impact statement |
|
| Lake Marion to Hampton Advisory Task Force Report and Supporting Materials | A report of the Lake Marion to Hampton Advisory Task Force's work, including route alternatives to study in the environmental impact statement |
|
| Public Informational Meeting Handouts (823 KB) | document details | Handouts that were distributed during the Brookings County - Hampton Transmission Project public scoping meetings conducted between March 30, 2009 to April 9, 2009 |
|
| RE-ISSUED Notice of Public Information Meetings for the Brookings County to Hampton 345 kV Transmission Line Project (1.5 MB) | document details | The Office of Energy Security will hold public information meetings on the proposed Brookings County to Hampton Transmission Line Project beginning March 30, 2009. Public comments on the project will be accepted until April 30, 2009 |
|
| Notice of Public Information Meetings for the Brookings County to Hampton 345 kV Transmission Line Project (1.5 MB) | document details | The Office of Energy Security will hold public information meetings on the proposed Brookings County to Hampton Transmission Line Project beginning March 30, 2009. Public comments on the project will be accepted until April 30, 2009 |
|
| Public Utilities Commission Order Accepting the Brookings, South Dakota, to Hampton, Minnesota, Route Permit Application as Complete (4 MB) | document details | The matter was heard by the Commission on January 27, 2009. The Commission accepted the route permit application as complete in an Order issued January 29, 2009 |
|
| Comments & Recommendations of OES EFP staff on the proposed Brookings to Hampton route permit application consideration (2.6 MB) | document details | Route permit application completeness to be considered by the Commission at the January 27, 2009, meeting |
|
| Draft Public Participation Plan (100 KB) | document details | A draft plan for public involvement that provides meaningful and effective participation opportunities to the public and helps EFP staff identify relevant community concerns |
|
| Route Permit Application - Appendices K through M | Route permit application for the proposed 345 kV transmission line from Brookings County, South Dakota to Hampton, Minnesota |
|
| Route Permit Application Appendices F through J | Route permit application for the proposed 345 kV transmission line from Brookings County, South Dakota to Hampton, Minnesota |
|
| Route Permit Application - Appendices A through E | Route permit application for the proposed 345 kV transmission line from Brookings County, South Dakota to Hampton, Minnesota |
|
| Route Permit Application | Route permit application for the proposed 345 kV transmission line from Brookings County, South Dakota to Hampton, Minnesota |
|
| Date | Document | On Behalf Of | Description |
| 06/17/13 | 20136-88234-01 | PUC | PUBLIC COMMENT |
| 06/17/13 | 20136-88223-01 | DOC EFP | COMPLIANCE REVIEW--EFP STAFF REVIEW AND COMMENTS - GRADING PLAN FOR HAZEL CREEK SUBSTATION |
| 06/13/13 | 20136-88124-01 | DOC EFP | COMMENTS--AND RECOMMENDATIONS ON PROPOSED MINOR ALTERATION IN CHUB LAKE TO HAMPTON SEGMENT |
| 06/13/13 | 20136-88164-01 | MINNESOTA DEPARTMENT OF NATURAL RESOURCES | COMMENTS--INCORRECT 7/13/13 DATE ON DOCUMENT |
| 06/13/13 | 20136-88139-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--BROOKINGS PROJECT STATUS REPORT AND COMPLAINT REPORT FOR MAY 2013 |
| 06/07/13 | 20136-87954-01 | PUC | ORDER--ORDER DENYING RECONSIDERATION |
| 06/07/13 | 20136-87960-01 | PUC | ORDER--ADDITIONAL SERVICE LIST FOR 08-1474 ORDER DENYING RECONSIDERATION |
| 06/07/13 | 20136-87954-02 | PUC | ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 06/06/13 | 20136-87896-01 | MANDY AND TOM URNESS | RECONSIDERATION--LANDOWNER PETITION JOINING MOTION FOR RECONSIDERATON OF MANDY & TOM URNESS |
| 06/05/13 | 20136-87878-01 | MANDY URNESS | LETTER--PART ONE OF TWO |
| 06/05/13 | 20136-87841-01 | CRAIG AND MICHELLE MARCOTTE | PUBLIC COMMENT |
| 06/05/13 | 20136-87879-01 | MANDY URNESS | LETTER--PART TWO OF TWO |
| 06/05/13 | 20136-87840-01 | AMBER PETERSON | PUBLIC COMMENT |
| 06/05/13 | 20136-87870-01 | TODD AND MERRILY TRABANT | PUBLIC COMMENT |
| 06/05/13 | 20136-87839-01 | JOHN AND BARBARA SULLIVAN | PUBLIC COMMENT |
| 06/05/13 | 20136-87842-01 | TOM AND MANDY URNESS | PUBLIC COMMENT |
| 06/03/13 | 20136-87802-01 | FRANK AND JANET CARLSON AND FAMILY | PUBLIC COMMENT |
| 06/03/13 | 20136-87757-02 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--BROOKINGS PROJECT CHUB LAKE TO HAMPTON FILING, EXHIBIT A PLAN AND PROFILE STRUCTURES 1-57, PART 2 OF 4 |
| 06/03/13 | 20136-87803-01 | MANDY AND TOM URNESS | MOTION--MOTION TO REOPEN - AFFIDAVIT OF CAROL A OVERLAND |
| 06/03/13 | 20136-87793-01 | RICK AND TERRA HENRY | PUBLIC COMMENT |
| 06/03/13 | 20136-87787-01 | JAY AND SUSAN SUBSTAD | PUBLIC COMMENT |
| 06/03/13 | 20136-87767-01 | KATHRYN JENSEN AND FAMILY | PUBLIC COMMENT |
| 06/03/13 | 20136-87757-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--BROOKINGS PROJECT CHUB LAKE TO HAMPTON FILING, COVER LETTER 6-3-13, PART 1 OF 4 |
| 06/03/13 | 20136-87757-04 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--BROOKINGS PROJECT CHUB LAKE TO HAMPTON FILING, EXHIBITS B, C, D AND E, PART 4 OF 4 |
| 06/03/13 | 20136-87757-03 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--BROOKINGS PROJECT CHUB LAKE TO HAMPTON FILING, EXHIBIT A, PLAN AND PROFILE STRUCTURE 57 TO HAMPTON SUBSTATION, PART 3 OF 4 |
| 06/03/13 | 20136-87791-01 | MANDY AND TOM URNESS | MOTION--MOTION TO REOPEN BASED ON NEW INFORMATION |
| 06/03/13 | 20136-87797-01 | SUSAN CRANDALL | PUBLIC COMMENT |
| 06/03/13 | 20136-87766-01 | MANDY URNESS | PUBLIC COMMENT |
| 05/31/13 | 20135-87622-01 | PUC | NOTICE OF COMMENT PERIOD--ON THE REQUEST FOR A MINOR ALTERATION TO THE ROUTE PERMIT FOR A 345 KV TRANSMISSION LINE FROM BROOKINGS COUNTY, SD TO HAMPTON, MN |
| 05/31/13 | 20135-87622-02 | PUC | NOTICE OF COMMENT PERIOD--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 05/30/13 | 20135-87588-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--BROOKINGS PROJECT - COMPLIANCE FILING FOR HAZEL CREEK SUBSTATION 5-30-13 |
| 05/30/13 | 20135-87590-01 | PUC | BRIEFING PAPERS--JUNE 6, 2013 AGENDA |
| 05/29/13 | 20135-87530-01 | GREAT RIVER ENERGY AND XCEL ENERGY | OTHER--BROOKINGS PROJECT MINOR ALTERATION APPLICATION FOR CHUB LAKE TO HAMPTON SEGMENT |
| 05/24/13 | 20135-87386-01 | PUC | NOTICE OF COMMISSION MEETING--JUNE 6, 2013 |
| 05/24/13 | 20135-87433-01 | GREAT RIVER ENERGY, A MINNESOTA COOPERATIVE CORPORATION, AND NORTHERN STATES POWER COMPANY, A MINNESOTA CORPORATION | RECONSIDERATION--RESPONSE TO MOTION FOR RECONSIDERATION OF MANDY AND TOM URNESS |
| 05/24/13 | 20135-87386-09 | PUC | NOTICE OF COMMISSION MEETING--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 05/15/13 | 20135-87006-01 | PUC | LETTER--TO CAROLE SCHMIDT RE COMPLIANCE REVIEW |
| 05/15/13 | 20135-87006-02 | PUC | LETTER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 05/15/13 | 20135-87013-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--BROOKINGS PROJECT HELENA SUBSTATION TO STRUCTURE 103 AMENDED SPECIAL CONDITIONS REPORT TO INCLUDE ADDITIONAL CULTURAL RESOURCES SURVEY RESULTS |
| 05/15/13 | 20135-87031-02 | PUC | LETTER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 05/15/13 | 20135-87031-01 | PUC | LETTER--REVISED TO CAROL SCHMIDT RE COMPLIANCE REVIEW |
| 05/14/13 | 20135-86949-01 | MANDY AND TOM URNESS | RECONSIDERATION--MOTION FOR RECONSIDERATION |
| 05/14/13 | 20135-86967-01 | AFFIDAVIT OF OVERLAND - URNESS | RECONSIDERATION--NOTARIZED AFFIDAVIT OF OVERLAND - URNESS |
| 05/14/13 | 20135-86950-01 | MANDY AND TOM URNESS | RECONSIDERATION--OVERLAND AFFIDAVIT - NOTARIZED AFFIDAVIT WILL BE FILED TOMORROW |
| 05/14/13 | 20135-86950-02 | MANDY AND TOM URNESS | RECONSIDERATION--URNESS - NOTICE OF APPEARANCE |
| 05/14/13 | 20135-86990-01 | MANDY AND TOM URNESS | RECONSIDERATION--COVER LETTER ERATTA SHEETS AFFIDAVIT |
| 05/10/13 | 20135-86889-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--BROOKINGS PROJECT STATUS REPORT AND COMPLAINT REPORT FOR APRIL 2013 |
| 05/02/13 | 20135-86655-01 | PUC | PUBLIC COMMENT--PUBLIC COMMENT OUTSIDE OF OPEN COMMENT PERIOD |
| 04/26/13 | 20134-86197-01 | DOC EFP | COMPLIANCE REVIEW--EFP STAFF REVIEW AND COMMENTS - GRADING PLAN FOR HAMPTON SUBSTATION |
| 04/25/13 | 20134-86135-01 | DOC EFP | COMPLIANCE REVIEW--EFP STAFF REVIEW AND COMMENTS - PLAN AND PROFILE FOR STRUCTURE 0960-103 TO CHUB LAKE SUBSTATION |
| 04/22/13 | 20134-85965-02 | PUC | ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 04/22/13 | 20134-85965-01 | PUC | ORDER--APPROVING ROUTE ALIGNMENT |
| 04/18/13 | 20134-85888-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--FOR HAMPTON SUBSTATION |
| 04/18/13 | 20134-85889-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--PLAN AND PROFILE COMPLIANCE FILING FOR STRUCTURE 103 TO CHUB LAKE SUBSTATION, HELENA TO CHUB LAKE SEGMENT |
| 04/10/13 | 20134-85580-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--BROOKINGS STATUS REPORT AND COMPLAINT REPORT FOR MARCH 2013 |
| 04/05/13 | 20134-85419-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--NOTIFICATION OF CHANGE IN CONSTRUCTION MANAGER |
| 04/01/13 | 20134-85170-01 | PUC | PUBLIC COMMENT--PUBLIC COMMENT OUTSIDE OF OPEN COMMENT PERIOD |
| 03/28/13 | 20133-85121-01 | PUC | BRIEFING PAPERS--APRIL 4, 2013 AGENDA |
| 03/22/13 | 20133-84929-10 | PUC | NOTICE OF COMMISSION MEETING--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 03/22/13 | 20133-84929-03 | PUC | NOTICE OF COMMISSION MEETING |
| 03/11/13 | 20133-84597-01 | DOC EFP | COMMENTS--AND RECOMMENDATIONS ON COUNTY ROAD 62 |
| 03/11/13 | 20133-84576-01 | PUC | PUBLIC COMMENT |
| 03/08/13 | 20133-84550-01 | PUC | LETTER--TO CAROLE SCHMIDT RE COMPLIANCE REVIEW - COMPLIANCE FILING OF 2-8-2013 PLAN AND PROFILE FOR THE HELENA SUBSTATION TO STRUCTURE 0960 - 103 SEGMENT 5 |
| 03/08/13 | 20133-84550-02 | PUC | LETTER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 03/06/13 | 20133-84480-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--BROOKINGS STATUS REPORT AND COMPLAINT REPORT FOR FEBRUARY 2013 |
| 03/04/13 | 20133-84416-01 | PUC | PUBLIC COMMENT |
| 02/28/13 | 20132-84289-05 | PUC | MINUTES--JANUARY 24, 2013 AGENDA MEETING |
| 02/28/13 | 20132-84251-01 | DOC EFP | COMPLIANCE REVIEW--EFP STAFF REVIEW AND COMMENTS -- PLAN AND PROFILE FOR HELENA SUBSTATION TO STRUCTURE 0960-103 |
| 02/26/13 | 20132-84161-03 | PUC | MINUTES--OCTOBER 4, 2012 AGENDA MEETING |
| 02/21/13 | 20132-83993-02 | PUC | NOTICE OF COMMENT PERIOD--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 02/21/13 | 20132-83993-01 | PUC | NOTICE OF COMMENT PERIOD--ON GREAT RIVER ENERGYS-PERMITTEES PROPOSED ALIGNMENT ON THE NORTH SIDE OF THE COUNTY ROAD 62 PORTION OF THE HELENA SUBSTATION TO CHUB LAKE SUBSTATION SEGMENT |
| 02/19/13 | 20132-83947-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--SUPPLEMENTAL FILING ON CHUB LAKE AREA ALIGNMENTS IN RESPONSE TO 2-5-13 PUC ORDER |
| 02/19/13 | 20132-83915-01 | COURT REPORTER | TRANSCRIPTS--TRANSCRIPT OF PROCEEDING HELD ON JANUARY 24, 2013 ST. PAUL, MN |
| 02/19/13 | 20132-83958-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--CORRECTED VERSION OF SUBMISSION NUMBER 20132-83947, SUPPLEMENTAL FILING IN RESPONSE TO PUC ORDER OF 2-5-13 |
| 02/08/13 | 20132-83670-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--BROOKINGS PROJECT STATUS REPORT AND COMPLAINT REPORT FOR JANUARY 2013 |
| 02/08/13 | 20132-83673-02 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--EXHIBIT A PLAN AND PROFILE PART 1 OF 3 |
| 02/08/13 | 20132-83673-08 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--EXHIBIT B STRUCTURE DETAILS LIST |
| 02/08/13 | 20132-83673-05 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--EXHIBIT D LINE IMPACTS SUMMARY TABLE |
| 02/08/13 | 20132-83673-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--PLAN AND PROFILE COMPLIANCE FILING COVER LETTER |
| 02/08/13 | 20132-83673-07 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--EXHIBIT C ALIGNMENT CHANGE MAPS |
| 02/08/13 | 20132-83673-06 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--EXHIBIT E REPORT TO COMMISSION ON SPECIAL CONDITIONS |
| 02/08/13 | 20132-83673-04 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--EXHIBIT A PLAN AND PROFILE PART 3 OF 3 |
| 02/08/13 | 20132-83673-03 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--EXHIBIT A PLAN AND PROFILE PART 2 OF 3 |
| 02/05/13 | 20132-83562-02 | PUC | ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 02/05/13 | 20132-83562-01 | PUC | ORDER--ORDER HOLDING PLAN AND PROFILE APPROVAL IN ABEYANCE AND REQUESTING DOC EFP STAFF TO TAKE OTHER ACTION |
| 02/04/13 | 20132-83547-01 | PUC | PUBLIC COMMENT--OUTSIDE OF OPEN COMMENT PERIOD |
| 02/04/13 | 20132-83544-01 | PUC | PUBLIC COMMENT |
| 01/17/13 | 20131-82874-01 | PUC | BRIEFING PAPERS--JANUARY 24, 2013 AGENDA MEETING |
| 01/11/13 | 20131-82646-09 | PUC | NOTICE OF COMMISSION MEETING--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 01/11/13 | 20131-82646-03 | PUC | NOTICE OF COMMISSION MEETING--JANUARY 24, 2013 |
| 01/08/13 | 20131-82547-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--BROOKINGS STATUS REPORT AND COMPLAINT REPORT FOR DECEMBER 2012 |
| 01/02/13 | 20131-82331-01 | DOC EFP | LETTER--RESPONSE TO GRE COMMENTS |
| 12/20/12 | 201212-82009-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMMENTS--PERMITTEES RESPONSE TO EFP LETTER OF DECEMBER 14, 2012 |
| 12/14/12 | 201212-81829-01 | DOC EFP | LETTER--RESPONSE TO COMPLIANCE FILING RE ALIGNMENT FEASIBILITY |
| 12/07/12 | 201212-81512-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--COMPLIANCE FILING FOR NOVEMBER 2012 |
| 12/04/12 | 201212-81357-27 | PUC | NOTICE--POWER PLANT SITING AND TRANSMISSION LINE ROUTING PROGRAM ANNUAL HEARING |
| 12/04/12 | 201212-81357-55 | PUC | NOTICE--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 12/03/12 | 201212-81317-01 | PUC | PUBLIC COMMENT--PC OUTSIDE OF OPEN COMMENT PERIOD |
| 11/19/12 | 201211-80823-03 | PUC | MINUTES--AUGUST 9, 2012 AGENDA MEETING |
| 11/19/12 | 201211-80813-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--CR 62 ALIGNMENT FEASIBILITY ANALYSIS - HELENA TO CHUB LAKE SEGMENT |
| 11/16/12 | 201211-80757-03 | PUC | MINUTES--AUGUST 23, 2012 AGENDA MEETING |
| 11/09/12 | 201211-80515-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--FOR OCTOBER 2012 COMPLAINTS |
| 11/05/12 | 201211-80387-01 | PUC | LETTER--TO CAROLE L. SCHMIDT RE COMPLIANCE REVIEW - PLAN AND PROFILE ALIGNMENT MODIFICATION |
| 11/05/12 | 201211-80387-02 | PUC | LETTER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 11/01/12 | 201211-80282-01 | PUC | PUBLIC COMMENT--OUTSIDE OF OPEN COMMENT PERIOD |
| 11/01/12 | 201211-80231-01 | DOC EFP | COMPLIANCE FILING--REVIEW OF COUNTY 62 PLAN AND PROFILE |
| 10/17/12 | 201210-79641-01 | PUC | PUBLIC COMMENT---OUTSIDE OF THE OPEN COMMENT PERIOD. |
| 10/15/12 | 201210-79533-02 | PUC | ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 10/15/12 | 201210-79533-01 | PUC | ORDER--ORDER APPROVING MINOR ALTERATION TO ROUTE PERMIT |
| 10/12/12 | 201210-79505-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--SUPPLEMENT TO SEPTEMBER 21 2012 FILING FOR COUNTY ROAD 62 |
| 10/11/12 | 201210-79442-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--STATUS REPORT FOR SEPTEMBER 2012 |
| 10/03/12 | 201210-79185-01 | PUC | PUBLIC COMMENT |
| 10/02/12 | 201210-79146-01 | PUC | LETTER--TO CAROLE L. SCHMIDT RE COMPLIANCE REVIEW - LYON COUNTY SUBSTATION TO CEDAR MOUNTAIN SUBSTATION SEGMENT |
| 10/02/12 | 201210-79146-02 | PUC | LETTER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 10/01/12 | 201210-79084-01 | DOC EFP | OTHER--REVIEW OF COMPLIANCE FILING |
| 09/28/12 | 20129-79054-02 | PUC | LETTER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 09/28/12 | 20129-79054-01 | PUC | LETTER--TO CAROLE L. SCHMIDT RE COMPLIANCE REVIEW - LYON COUNTY SUBSTATION TO CEDAR MOUNTAIN SUBSTATION SEGMENT |
| 09/26/12 | 20129-78958-01 | PUC | BRIEFING PAPERS--OCTOBER 4, 2012 AGENDA MEETING |
| 09/21/12 | 20129-78868-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--REVISED SUPPLEMENTAL INFORMATION ON SCENIC BYWAY CROSSING, LYON COUNTY TO CEDAR MOUNTAIN SEGMENT WITH FIGURES 1 AND 2 REPLACES FILING SUBMITTED EARLIER 9-21-12 |
| 09/21/12 | 20129-78867-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--PLAN AND PROFILE COMPLIANCE FILING FOR COUNTY ROAD 62 PORTION OF HELENA TO CHUB LAKE SEGMENT |
| 09/21/12 | 20129-78866-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--SUPPLEMENTAL INFORMATION ON SCENIC BYWAY CROSSING, LYON COUNTY TO CEDAR MOUNTAIN SEGMENT |
| 09/21/12 | 20129-78855-10 | PUC | NOTICE OF COMMISSION MEETING--OCTOBER 4, 2012 |
| 09/17/12 | 20129-78699-01 | PUC | PUBLIC COMMENT |
| 09/14/12 | 20129-78677-01 | DOC EFP | COMMENTS--DOC EFP COMMENTS ON MINOR ALTERATION REQUEST |
| 09/12/12 | 20129-78612-01 | PUC | PUBLIC COMMENT |
| 09/11/12 | 20129-78583-01 | DOC EFP | OTHER--REVIEW OF COMPLIANCE FILING - SEGMENT 3 |
| 09/10/12 | 20129-78487-02 | PUC | ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 09/10/12 | 20129-78487-01 | PUC | ORDER--ORDER APPROVING MINOR ALTERATION TO ROUTE PERMIT |
| 09/07/12 | 20129-78460-01 | PUC | LETTER--TO CAROL L. SCHMIDT RE COMPLIANCE REVIEW |
| 09/07/12 | 20129-78447-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--- FOR AUGUST 2012 |
| 09/07/12 | 20129-78460-02 | PUC | LETTER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 09/05/12 | 20129-78391-01 | PUC | PUBLIC COMMENT--PUBLIC COMMENT OUTSIDE OF OPEN COMMENT PERIOD |
| 09/05/12 | 20129-78394-01 | PUC | PUBLIC COMMENT--PUBLIC COMMENT OUTSIDE OF THE OPEN COMMENT PERIOD |
| 09/04/12 | 20129-78370-01 | PUC | PUBLIC COMMENT--PUBLIC COMMENT OUTSIDE OF OPEN COMMENT PERIOD |
| 08/29/12 | 20128-78227-02 | PUC | NOTICE OF COMMENT PERIOD--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 08/29/12 | 20128-78227-01 | PUC | NOTICE OF COMMENT PERIOD--ON MINOR ALTERATION APPLICATION |
| 08/24/12 | 20128-78102-01 | DOC EFP | OTHER--COMPLAINCE FILING REVIEW OF CHUB LAKE SUBSTATION |
| 08/24/12 | 20128-78109-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--CLARIFICATION ON CEDAR MOUNTAIN TO FRANKLIN COMPLIANCE FILING SUBMITTED JULY 26, 2012 |
| 08/23/12 | 20128-78075-01 | GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY DBA XCEL ENERGY | COMPLIANCE FILING--LYON COUNTY TO CEDAR MOUNTAIN MINOR ALTERATION 5 REQUEST |
| 08/23/12 | 20128-78068-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--BROOKINGS PROJECT LYON COUNTY TO CEDAR MOUNTAIN PLAN AND PROFILE COMPLIANCE FILING PART 2 OF 4 INCLUDING PLAN AND PROFILE |
| 08/23/12 | 20128-78070-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--BROOKINGS PROJECT LYON COUNTY TO CEDAR MOUNTAIN PLAN AND PROFILE COMPLIANCE FILING PART 4 OF 4 INCLUDING ALIGNMENT MODIFICATION MAPS 26-49 OF 49 |
| 08/23/12 | 20128-78069-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--BROOKINGS PROJECT LYON COUNTY TO CEDAR MOUNTAIN COMPLIANCE FILING PART 3 OF 4 INCLUDING ALIGNMENT MODIFICATION MAPS 1 TO 25 OF 49 |
| 08/23/12 | 20128-78065-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--BROOKINGS PROJECT LYON COUNTY TO CEDAR MOUNTAIN PLAN AND PROFILE COMPLIANCE FILING PART 1 OF 4 INCLUDING COVER LETTER, STRUCTURE MATRIX, TABLE DOCUMENTING CHANGES, AND REPORT TO COMMISSION ON ROUTE PERMIT SPECIAL CONDITIONS |
| 08/22/12 | 20128-78034-01 | PUC | LETTER--TO CAROL L. SCHMIDT - RE COMPLIANCE FILINGS PLAN AND PROFILE |
| 08/22/12 | 20128-78034-02 | PUC | LETTER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 08/22/12 | 20128-78032-01 | DOC EFP | OTHER--RESPONSE TO COMPLIANCE FILING CM-HELENA |
| 08/22/12 | 20128-78049-02 | PUC | LETTER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 08/22/12 | 20128-78049-01 | PUC | LETTER--TO CAROL L. SCHMIDT RE COMPLIANCE REVIEW |
| 08/21/12 | 20128-78012-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--REQUEST TO COMMISSION TO RELEASE OBRIEN WMA AREA FOR CONSTRUCTION |
| 08/16/12 | 20128-77922-01 | PUC | BRIEFING PAPERS--AUGUST 23, 2012 AGENDA |
| 08/10/12 | 20128-77751-04 | PUC | NOTICE OF COMMISSION MEETING--AUGUST 23, 2012 |
| 08/09/12 | 20128-77721-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--STATUS REPORT FOR JULY 2012 |
| 08/07/12 | 20128-77606-01 | PUC | NOTICE--RESCHEDULED DECISION ITEM |
| 08/07/12 | 20128-77606-02 | PUC | NOTICE--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 08/06/12 | 20128-77581-02 | PUC | MINUTES--JUNE 21, 2012 AGENDA MEETING |
| 08/03/12 | 20128-77563-01 | GREAT RIVER ENERGY | COMPLIANCE FILING--- FOR CHUB LAKE SUBSTATION |
| 08/03/12 | 20128-77549-01 | PUC | NOTICE OF COMMISSION MEETING--CORRECTED - AUGUST 9, 2012 |
| 08/02/12 | 20128-77514-01 | PUC | BRIEFING PAPERS--AUGUST 9, 2012 AGENDA MEETING |
| 08/02/12 | 20128-77506-01 | PUC | PUBLIC COMMENT |
| 07/26/12 | 20127-77272-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--REVISED PLAN AND PROFILE COMPLIANCE FILING FOR CEDAR MOUNTAIN TO FRANKLIN SEGMENT - REPLACES FILING OF 7-20-12 |
| 07/20/12 | 20127-77019-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--PLAN AND PROFILE COMPLIANCE FILING FOR CEDAR MOUNTAIN TO FRANKLIN SEGMENT |
| 07/20/12 | 20127-77001-01 | DOC EFP | COMMENTS--SUPPLEMENTAL |
| 07/12/12 | 20127-76768-01 | PUC | PUBLIC COMMENT |
| 07/11/12 | 20127-76722-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--MONTHLY STATUS REPORT AND COMPLAINT REPORT FOR JUNE 2012 |
| 07/11/12 | 20127-76707-01 | DOC EFP | COMMENTS--COMMENTS ON MINOR ALTERATION REQUEST |
| 07/10/12 | 20127-76660-01 | PUC | ORDER--APPROVING MINOR ALTERATIONS TO ROUTE PERMIT |
| 07/10/12 | 20127-76660-02 | PUC | ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 07/02/12 | 20127-76412-01 | PUC | PUBLIC COMMENT |
| 06/29/12 | 20126-76348-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--- TO NOTIFY PUC OF CHANGE IN PROJECT FIELD REPRESENTATIVE |
| 06/27/12 | 20126-76135-01 | PUC | NOTICE--SEGMENT 4 - PLAN AND PROFILE COMPLIANCE REVIEW |
| 06/27/12 | 20126-76135-02 | PUC | NOTICE--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 06/22/12 | 20126-75926-02 | PUC | NOTICE--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 06/22/12 | 20126-75926-01 | PUC | NOTICE--NOTICE OF MINOR ALTERATION APPLICATION AND COMMENT PERIOD |
| 06/20/12 | 20126-75856-01 | GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | OTHER--AFFIDAVIT OF MAILING OF REQUEST FOR MINOR ALTERATION FOR QUADRUPLE CIRCUIT STRUCTURES |
| 06/20/12 | 20126-75850-01 | GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY DOING BUSINESS AS XCEL ENERGY | COMPLIANCE FILING--GRE BROOKINGS FILING LTR TO DR HAAR ON ALT 1 AND 4 |
| 06/19/12 | 20126-75771-03 | DNR | LETTER--3 OF 3 |
| 06/19/12 | 20126-75771-02 | DNR | LETTER--2 OF 3 |
| 06/19/12 | 20126-75776-01 | PUC | BRIEFING PAPERS--JUNE 21, 2012 AGENDA |
| 06/19/12 | 20126-75771-01 | DNR | LETTER--1 OF 3 |
| 06/19/12 | 20126-75808-01 | DOC EFP | COMMENTS--EFP COMMENTS ON PLAN AND PROFILE CHANGES |
| 06/18/12 | 20126-75764-01 | GREAT RVIER ENERGY AND XCEL ENERGY | OTHER--REQUEST FOR MINOR ALTERATION FOR QUADRUPLE CIRCUIT STRUCTURES |
| 06/14/12 | 20126-75642-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--CEDAR MOUNTAIN TO HELENA PLAN AND PROFILE NOTIFICATION |
| 06/13/12 | 20126-75569-01 | DOC EFP | COMMENTS--- ON MINOR ALTERATION REQUEST |
| 06/13/12 | 20126-75600-01 | PUC | PUBLIC COMMENT |
| 06/08/12 | 20126-75454-04 | PUC | NOTICE OF COMMISSION MEETING--JUNE 21, 2012 |
| 06/07/12 | 20126-75443-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--COMPLIANCE FILING FOR MAY 2012 |
| 05/30/12 | 20125-75113-02 | PUC | NOTICE--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 05/30/12 | 20125-75113-01 | PUC | NOTICE--MINOR ALTERATION APPLICATION AND COMMENT PERIOD |
| 05/22/12 | 20125-74915-05 | GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY | COMPLIANCE FILING--CAPX2020 RP EXHIBIT D MAP RTCO ALTERATION |
| 05/22/12 | 20125-74915-03 | GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY | COMPLIANCE FILING--CAPX2020 RP MINOR ALTERATION EXHIBIT B SUMMARY TABLE |
| 05/22/12 | 20125-74915-07 | GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY | COMPLIANCE FILING--CAPX2020 RP EXHIBIT F MAP RTCO ALTERATION |
| 05/22/12 | 20125-74915-02 | GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY | COMPLIANCE FILING--CAPX2020 EXHIBIT A MAP ROUTE ALTERNATIONS LYON TO CEDAR |
| 05/22/12 | 20125-74915-06 | GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY | COMPLIANCE FILING--CAPX2020 RP EXHIBIT E MAP RTCO ALTERATION |
| 05/22/12 | 20125-74915-04 | GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY | COMPLIANCE FILING--CAPX2020 RP EXHBIIT C MAP RTCO ALTERATION |
| 05/22/12 | 20125-74915-01 | GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY | COMPLIANCE FILING--CAPX2020 FILING LETTER AND LANDOWNERS SERVICE LIST |
| 05/16/12 | 20125-74791-02 | PUC | LETTER--CERTIFICATE OF SERVICE |
| 05/16/12 | 20125-74791-01 | PUC | LETTER--TO CAROLE L. SCHMIDT -COMMISSION COMPLIANCE RESPONSE - LYON COUNTY SUBSTATION |
| 05/14/12 | 20125-74701-01 | DOC EFP | COMPLIANCE FILING--EFP COMPLIANCE RESPONSE - LYON CTY SUB |
| 05/10/12 | 20125-74610-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--- FIELD REPRESENTATIVES CM-HELENA |
| 05/07/12 | 20125-74519-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--MONTHLY STATUS REPORT FOR APRIL 2012 |
| 04/26/12 | 20124-74069-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--- FOR LYON COUNTY SUBSTATION EXPANSION |
| 04/18/12 | 20124-73762-05 | PUC | MINUTES--FEBRUARY 23, 2012 AGENDA MEETING |
| 04/09/12 | 20124-73444-01 | PUC | PUBLIC COMMENT |
| 04/05/12 | 20124-73375-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--COMPLIANCE FILING FOR MARCH 2012 |
| 03/30/12 | 20123-73170-01 | DOC EFP | COMPLIANCE FILING--DOC EFP RESPONSE - CEDAR MTN TO HELENA |
| 03/08/12 | 20123-72322-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--FEBRUARY 2012 |
| 02/29/12 | 20122-72007-01 | PUC | ORDER |
| 02/29/12 | 20122-72007-02 | PUC | ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 02/29/12 | 20122-72028-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--PART 1 OF 15, CEDAR MOUNTAIN TO HELENA PLAN AND PROFILE COMPLIANCE FILING, COVER LETTER, RESUBMITTED |
| 02/28/12 | 20122-71978-02 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--PART 3 OF 15 PLAN AND PROFILE, CEDAR MOUNTAIN TO HELENA, CEDAR MOUNTAIN SUBSTATION TO STRUCTURE 59 |
| 02/28/12 | 20122-71978-05 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--PART 6 OF 15 PLAN AND PROFILE, CEDAR MOUNTAIN TO HELENA, STRUCTURES 176 TO 230 |
| 02/28/12 | 20122-71978-06 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--PART 7 OF 15 PLAN AND PROFILE, CEDAR MOUNTAIN TO HELENA, STRUCTURES 231 TO 286 |
| 02/28/12 | 20122-71980-03 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--PART 13 OF 15 PLAN AND PROFILE, CEDAR MOUNTAIN TO HELENA, MAPBOOK STRUCTURES 212 TO HELENA SUBSTATION, |
| 02/28/12 | 20122-71980-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--PART 11 OF 15 PLAN AND PROFILE, CEDAR MOUNTAIN TO HELENA, TABLE 1 SUMMARY OF ALIGNMENT CHANGES |
| 02/28/12 | 20122-71978-03 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--PART 4 OF 15 PLAN AND PROFILE, CEDAR MOUNTAIN TO HELENA, STRUCTURES 60 TO 118 |
| 02/28/12 | 20122-71980-05 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--PART 15 OF 15 PLAN AND PROFILE, CEDAR MOUNTAIN TO HELENA, REPORT TO COMMISSION ON SPECIAL CONDITIONS, |
| 02/28/12 | 20122-71978-04 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--PART 5 OF 15 PLAN AND PROFILE, CEDAR MOUNTAIN TO HELENA, STRUCTURES 119 TO 175 |
| 02/28/12 | 20122-71980-04 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--PART 14 OF 15 PLAN AND PROFILE, CEDAR MOUNTAIN TO HELENA, CEDAR MOUNTAIN SUBSTATION GRADING PLAN, |
| 02/28/12 | 20122-71980-02 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--PART 12 OF 15 PLAN AND PROFILE, CEDAR MOUNTAIN TO HELENA, MAPBOOK CM SUBSTATION TO STRUCTURE 211, |
| 02/28/12 | 20122-71978-09 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--PART 10 OF 15 PLAN AND PROFILE, CEDAR MOUNTAIN TO HELENA, STRUCTURE 405 TO HELENA SUBSTATION |
| 02/28/12 | 20122-71978-07 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--PART 8 OF 15 PLAN AND PROFILE, CEDAR MOUNTAIN TO HELENA, STRUCTURES 287 TO 347 |
| 02/28/12 | 20122-71978-08 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--PART 9 OF 15 PLAN AND PROFILE, CEDAR MOUNTAIN TO HELENA, STRUCTURES 248 TO 404 |
| 02/28/12 | 20122-71978-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--PART 2 OF 15 PLAN AND PROFILE, CEDAR MOUNTAIN TO HELENA, STRUCTURE DETAIL LIST, |
| 02/17/12 | 20122-71718-01 | DOC EFP | BRIEFING PAPERS--COVER LETTER TO CR |
| 02/17/12 | 20122-71718-02 | DOC EFP | BRIEFING PAPERS--COMMENTS AND RECOMMENDATIONS ON MINOR ALTERATION REQUEST |
| 02/10/12 | 20122-71406-02 | PUC | NOTICE OF COMMISSION MEETING--FEBRUARY 23, 2012 |
| 02/09/12 | 20122-71394-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING--MONTHLY COMPLAINT REPORT |
| 01/18/12 | 20121-70392-01 | DOC EFP | NOTICE--OF MINOR ALTERATION APPLICATION AND COMMENT PERIOD |
| 01/11/12 | 20121-70189-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING |
| 01/10/12 | 20121-70145-01 | DOC EFP | LETTER--EFP RESPONSE TO WERNER COMPLAINT |
| 01/05/12 | 20121-69979-01 | GREAT RIVER ENERGY, A MINNESOTA COOPERATIVE CORPORATION, AND NORTHERN STATES POWER COMPANY, A MINNESOTA CORPORATION | OTHER--APPLICATION FOR APPROVAL OF MINOR ALTERATION FOR INTERCONNECTIONS, HAMPTON SUBSTATION AND INTERSTATE 35 CROSSING |
| 12/12/11 | 201112-69154-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING |
| 11/14/11 | 201111-68273-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING |
| 10/12/11 | 201110-67258-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING |
| 09/27/11 | 20119-66661-01 | PUC | LETTER--TO CAROLE L. SCHMIDT |
| 09/27/11 | 20119-66652-01 | DOC | COMPLIANCE FILING--DOC COMPLIANCE RESPONSE |
| 09/16/11 | 20119-66448-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING |
| 09/12/11 | 20119-66269-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING |
| 08/11/11 | 20118-65263-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING |
| 08/01/11 | 20117-64828-01 | GREAT RIVER ENERGY AND XCEL ENERGY | COMPLIANCE FILING |
| 08/01/11 | 20117-64831-01 | GREAT RIVER ENERGY | COMPLIANCE FILING |
| 05/09/11 | 20115-62373-01 | DOC EFP | NOTICE--STATE REGISTER NOTICE OF FINAL PERMIT |
| 05/04/11 | 20115-62271-01 | DOC EFP | NOTICE--EQB MONITOR - NOTICE OF FINAL PERMIT |
| 04/15/11 | 20114-61346-01 | PUC | ORDER--DENYING RECONSIDERATION |
| 04/11/11 | 20114-61186-01 | PUC | PUBLIC COMMENT |
| 04/11/11 | 20114-61183-01 | PUC | PUBLIC COMMENT |
| 04/08/11 | 20114-61139-01 | GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | RECONSIDERATION--AFFIDAVIT OF MAILING OF COURTESY COPIES OF ANSWER TO PETITION |
| 04/08/11 | 20114-61105-01 | PUC | BRIEFING PAPERS--REVISED BRIEFING PAPER FOR APRIL 14, 2011 AGENDA MEETING |
| 04/07/11 | 20114-61104-01 | GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | RECONSIDERATION--AFFIDAVIT OF SERVICE FOR ANSWER TO PETITION FOR RECONSIDERATION |
| 04/06/11 | 20114-61073-01 | PUC | BRIEFING PAPERS--APRIL 14, 2011 AGENDA MEETING |
| 04/04/11 | 20114-60974-01 | PUC | PUBLIC COMMENT--MISSED ITEMS TO PCPREVIOUSLY E-FILED ON 4-1-2001 |
| 04/01/11 | 20114-60860-07 | PUC | NOTICE OF COMMISSION MEETING--APRIL 14, 2011 |
| 04/01/11 | 20114-60863-01 | PUC | PUBLIC COMMENT |
| 03/31/11 | 20113-60847-01 | PUC | PUBLIC COMMENT |
| 03/31/11 | 20113-60829-01 | GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | RECONSIDERATION--PERMITTEES ANSWER TO PETITION FOR RECONSIDERATION |
| 03/21/11 | 20113-60494-01 | VICKI WOLTER REPRESENTING SIBLEY & SCOTT COUNTY RESIDENTS | RECONSIDERATION--PETITION FOR RECONSIDERATION |
| 03/02/11 | 20113-60034-01 | PUC | NOTICE--AVAILABILITY OF FINAL ORDER |
| 03/01/11 | 20113-60003-01 | PUC | ORDER--GRANTING ROUTE PERMIT FOR REMANDED SEGMENT OF ROUTE |
| 03/01/11 | 20113-60003-02 | PUC | ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 01/31/11 | 20111-59065-01 | PUC | PUBLIC COMMENT |
| 01/27/11 | 20111-58948-01 | DOC OES | BRIEFING PAPERS--OES COMMENTS AND RECOMMENDATIONS ON BROOKINGS REMAND |
| 01/21/11 | 20111-58759-01 | PUC | NOTICE OF COMMISSION MEETING--FEBRUARY 3, 2011 |
| 01/13/11 | 20111-58500-01 | OAH | OTHER--COMPLETED EXHIBITS A - HERRING LESHER AND SCHMIDT |
| 01/11/11 | 20111-58396-01 | PUC | PUBLIC COMMENT |
| 01/06/11 | 20111-58217-01 | NOCAPX AND UNITED CITIZEN ACTION NETWORK | OTHER--EXCEPTIONS TO ALJ RECOMMENDATION |
| 01/03/11 | 20111-58083-01 | PUC | PUBLIC COMMENT |
| 12/29/10 | 201012-57952-01 | OAH | OTHER--CERTIFICATE OF CONTESTED CASE RECORD ON REMAND AND CERTIFICATE OF HEARING RECORD ON REMAND |
| 12/29/10 | 201012-57945-01 | OAH | OTHER--HEARING EXHIBIT LIST |
| 12/23/10 | 201012-57824-01 | OAH | ORDER--AMENDMENTS TO FINDINGS OF FACT, CONCLUSIONS, AND RECOMMENDATION ON REMAND |
| 12/22/10 | 201012-57798-01 | OAH | DECISION--FINDINGS OF FACT, CONCLUSIONS AND RECOMMENDATION ON REMAND |
| 12/13/10 | 201012-57390-01 | DOC OES EFP | LETTER--AND REVISED FACT SHEET |
| 12/08/10 | 201012-57266-09 | PUC | MINUTES--OCTOBER 28, 2010 AGENDA MEETING |
| 12/03/10 | 201012-57147-01 | GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | COMMENTS--ON FACT SHEET |
| 11/23/10 | 201011-56774-01 | DOC OES | NOTICE--NOTICE OF FINAL PERMIT - EQB MONITOR |
| 11/23/10 | 201011-56774-02 | DOC OES | NOTICE--NOTICE OF FINAL PERMIT - STATE REGISTER |
| 11/17/10 | 201011-56630-01 | OAH | PUBLIC COMMENT--RUHLAND COMMENT - TIMELY |
| 11/17/10 | 201011-56630-02 | OAH | PUBLIC COMMENT--RUHLAND COMMENT - LATE |
| 11/16/10 | 201011-56581-03 | DOC OES EFP | OTHER--PROPOSED FINDINGS CONCLUSIONS AND RECOMMENDATION |
| 11/16/10 | 201011-56581-01 | DOC OES EFP | COMMENTS--FILING LETTER FOR 08-1474 POST HEARING COMMENTS AND FINDINGS ETC |
| 11/16/10 | 201011-56577-01 | NOCAPX 2020 AND UNITED CITIZENS ACTION NETWORK | REPLY BRIEF |
| 11/16/10 | 201011-56566-01 | APPLICANTS GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | REPLY BRIEF---ON REMAND |
| 11/16/10 | 201011-56581-02 | DOC OES EFP | COMMENTS |
| 11/15/10 | 201011-56531-01 | PUC | PUBLIC COMMENT |
| 11/12/10 | 201011-56413-01 | NOCAPX AND U-CAN | BRIEF--REMAND - INITIAL BRIEF |
| 11/10/10 | 201011-56407-02 | APPLICANTS GREAT RIVER ENERGY & NORTHERN STATES POWER COMPANY | BRIEF--APPLICANTS BRIEF ON REMAND |
| 11/10/10 | 201011-56403-01 | DOC OES EFP | LETTER |
| 11/10/10 | 201011-56409-01 | APPLICANTS GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | OTHER--FILING LETTER FOR AFFIDAVIT OF ROGER KIEFER & TIMOTHY ROGERS |
| 11/10/10 | 201011-56407-03 | APPLICANTS GREAT RIVER ENERGY & NORTHERN STATES POWER COMPANY | BRIEF--APPLICANTS REMAND FINDINGS OF FACT, CONCLUSIONS OF LAW AND RECOMMENDATIONS |
| 11/10/10 | 201011-56409-02 | APPLICANTS GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | OTHER--AFFIDAVIT OF ROGER KIEFER |
| 11/10/10 | 201011-56409-03 | APPLICANTS GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | OTHER--AFFIDAVIT OF TIMOTHY ROGERS |
| 11/10/10 | 201011-56407-01 | APPLICANTS GREAT RIVER ENERGY & NORTHERN STATES POWER COMPANY | BRIEF--FILING LETTER & CERTIFICATE OF SERVICE FOR REMAND BRIEF & FINDINGS |
| 11/05/10 | 201011-56262-01 | ATTORNEY FOR ROBERT & PATRICIA JOHNSON | OTHER--COVER-LANDOWNERS RIGHTS NOTICE PROPOSAL |
| 11/05/10 | 201011-56262-02 | ATTORNEY FOR ROBERT & PATRICIA JOHNSON | OTHER--LANDOWNERS RIGHTS NOTICE PROPOSAL |
| 11/05/10 | 201011-56256-01 | OAH | OTHER--MEMORANDUM |
| 11/04/10 | 201011-56178-01 | OAH | PUBLIC COMMENT--COMMENTS THROUGH NOVEMBER 1 |
| 11/02/10 | 201011-56115-05 | OAH | EXHIBITS - HEARING--EXHIBIT 162D - LARGE FORMAT MAP WITH INSETS |
| 11/02/10 | 201011-56115-03 | OAH | EXHIBITS - HEARING--EXHIBIT 162B - LARGE FORMAT MAP |
| 11/02/10 | 201011-56115-06 | OAH | EXHIBITS - HEARING--EXHIBIT 165 - LARGE FORMAT MAP WITH INSETS |
| 11/02/10 | 201011-56115-07 | OAH | EXHIBITS - HEARING--EXHIBIT 166 - LARGE FORMAT MAP WITH INSETS |
| 11/02/10 | 201011-56115-04 | OAH | EXHIBITS - HEARING--EXHIBIT 162C - LARGE FORMAT MAP WITH INSETS |
| 11/02/10 | 201011-56115-01 | OAH | EXHIBITS - HEARING--EXHIBIT 161 - LARGE FORMAT MAP WITH INSETS |
| 11/02/10 | 201011-56115-02 | OAH | EXHIBITS - HEARING--EXHIBIT 162A - LARGE FORMAT MAP |
| 11/01/10 | 201011-56096-01 | GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | COMMENTS--LETTERS - USFWS TO GRE AND RESPONSE TO USFWS |
| 10/29/10 | 201010-55948-01 | OAH | PUBLIC COMMENT--VARIOUS COMMENTS |
| 10/29/10 | 201010-55992-02 | PUC | ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 10/29/10 | 201010-55992-01 | PUC | ORDER--DENYING RECONSIDERATION |
| 10/26/10 | 201010-55843-01 | DOC OES | LETTER--AND FACT SHEET |
| 10/26/10 | 201010-55830-01 | OAH | PUBLIC COMMENT--VARIOUS MAILED COMMENTS |
| 10/25/10 | 201010-55760-04 | COURT REPORTER | TRANSCRIPTS--TRANSCRIPT 10-05-10 BELLE PLAINE EVENING |
| 10/25/10 | 201010-55760-01 | COURT REPORTER | TRANSCRIPTS--TRANSCRIPT 10-4-10 LESEUER |
| 10/25/10 | 201010-55811-01 | PUC | PUBLIC COMMENT |
| 10/25/10 | 201010-55745-01 | OAH | PUBLIC COMMENT--VARIOUS EMAILED COMMENTS |
| 10/25/10 | 201010-55760-05 | COURT REPORTER | TRANSCRIPTS--TRANSCRIPT - EVIDENTIARY HEARING 10-6-10 |
| 10/25/10 | 201010-55746-01 | OAH | EXHIBITS - HEARING--EXHIBIT 414 |
| 10/25/10 | 201010-55760-03 | COURT REPORTER | TRANSCRIPTS--TRANSCRIPT - 10-05-10 BELLE PLAINE AFTERNOON |
| 10/25/10 | 201010-55760-02 | COURT REPORTER | TRANSCRIPTS--TRANSCRIPT - 10-04-10 ARLINGTON |
| 10/22/10 | 201010-55729-03 | OAH | EXHIBITS - HEARING--EXHIBIT 411 B |
| 10/22/10 | 201010-55730-02 | OAH | EXHIBITS - HEARING--EXHIBIT 422 |
| 10/22/10 | 201010-55727-05 | OAH | EXHIBITS - HEARING--EXHIBIT 406 |
| 10/22/10 | 201010-55727-04 | OAH | EXHIBITS - HEARING--EXHIBIT 405 - PART 2 |
| 10/22/10 | 201010-55729-05 | OAH | EXHIBITS - HEARING--EXHIBIT 413 |
| 10/22/10 | 201010-55727-06 | OAH | EXHIBITS - HEARING--EXHIBIT 407 A-C |
| 10/22/10 | 201010-55727-01 | OAH | EXHIBITS - HEARING--EXHIBIT 403 |
| 10/22/10 | 201010-55729-07 | OAH | EXHIBITS - HEARING--EXHIBIT 416 |
| 10/22/10 | 201010-55729-06 | OAH | EXHIBITS - HEARING--EXHIBIT 415 |
| 10/22/10 | 201010-55730-08 | OAH | EXHIBITS - HEARING--EXHIBIT 536 |
| 10/22/10 | 201010-55730-06 | OAH | EXHIBITS - HEARING--EXHIBIT 534 |
| 10/22/10 | 201010-55729-01 | OAH | EXHIBITS - HEARING--EXHIBIT 410 |
| 10/22/10 | 201010-55729-10 | OAH | EXHIBITS - HEARING--EXHIBIT 420 |
| 10/22/10 | 201010-55727-02 | OAH | EXHIBITS - HEARING--EXHIBIT 404 |
| 10/22/10 | 201010-55729-04 | OAH | EXHIBITS - HEARING--EXHIBIT 412 |
| 10/22/10 | 201010-55727-03 | OAH | EXHIBITS - HEARING--EXHIBIT 405 - PART 1 |
| 10/22/10 | 201010-55730-01 | OAH | EXHIBITS - HEARING--EXHIBIT 421 |
| 10/22/10 | 201010-55727-08 | OAH | EXHIBITS - HEARING--EXHIBIT 408 |
| 10/22/10 | 201010-55727-09 | OAH | EXHIBITS - HEARING--EXHIBIT 409 |
| 10/22/10 | 201010-55729-09 | OAH | EXHIBITS - HEARING--EXHIBIT 419 |
| 10/22/10 | 201010-55730-04 | OAH | EXHIBITS - HEARING--EXHIBIT 532 - TRADE SECRET VERSION |
| 10/22/10 | 201010-55730-03 | OAH | EXHIBITS - HEARING--EXHIBIT 532 - PUBLIC VERSION |
| 10/22/10 | 201010-55729-08 | OAH | EXHIBITS - HEARING--EXHIBIT 418 |
| 10/22/10 | 201010-55729-02 | OAH | EXHIBITS - HEARING--EXHIBIT 411 A |
| 10/22/10 | 201010-55730-05 | OAH | EXHIBITS - HEARING--EXHIBIT 533 |
| 10/22/10 | 201010-55727-07 | OAH | EXHIBITS - HEARING--EXHIBIT 407 D |
| 10/22/10 | 201010-55730-07 | OAH | EXHIBITS - HEARING--EXHIBIT 535 |
| 10/21/10 | 201010-55731-01 | OAH | PUBLIC COMMENT--DNR COMMENT |
| 10/20/10 | 201010-55650-01 | PUC | BRIEFING PAPERS--OCTOBER 28, 2010 AGENDA MEETING |
| 10/18/10 | 201010-55563-01 | OAH | ORDER--SECOND PREHEARING ORDER ON REMAND |
| 10/18/10 | 201010-55566-01 | PUC | PUBLIC COMMENT--PART 1 OF 2 |
| 10/18/10 | 201010-55543-01 | NOCAPX 2020 AND UNITED CITIZENS ACTION NETWORK | LETTER--RESPONSE TO APPLICANT COMMENT EXTENSION REQUEST |
| 10/18/10 | 201010-55567-01 | PUC | PUBLIC COMMENT--PART 2 OF 2 |
| 10/18/10 | 201010-55559-01 | DOC OES EFP | LETTER--OES EFP RESPONSE TO XCEL AND GRE REQUEST FOR EXTENSION |
| 10/18/10 | 201010-55587-01 | BRUCE MCKAY, P.E. | COMMENTS--AFFIDAVIT AND COMMENT OF BRUCE MCKAY P.E. |
| 10/15/10 | 201010-55477-01 | OAH | PUBLIC COMMENT--EMAILED COMMENTS |
| 10/15/10 | 201010-55518-02 | RANDY SCHROEDER, ET AL. | RECONSIDERATION--COVER LETTER AND CERTIFICATE OF SERVICE |
| 10/15/10 | 201010-55518-01 | RANDY SCHROEDER, ET AL. | RECONSIDERATION--AMENDED PETITION FOR RECONSIDERATION |
| 10/15/10 | 201010-55540-01 | APPLICANTS GREAT RIVER ENERGY AND NORTHERN STATES POWER | LETTER--LETTER AND PROPOSED AMENDMENT TO FIRST PREHEARING ORDER ON REMAND |
| 10/15/10 | 201010-55479-01 | PUC | NOTICE OF COMMISSION MEETING--OCTOBER 28, 2010 |
| 10/14/10 | 201010-55475-01 | APPLICANTS GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | OTHER--AFFIDAVIT OF MAILING OF PUBLIC HEARING TRANSCRIPTS |
| 10/11/10 | 201010-55357-01 | GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | RECONSIDERATION--RESPONSE TO PETITION FOR RECONSIDERATION OF THE ORDER GRANTING ROUTE PERMIT |
| 10/05/10 | 2330 | OAH | EXHIBITS - HEARING--EXHIBIT 412 |
| 10/05/10 | 2328 | OAH | EXHIBITS - HEARING--EXHIBIT 410 |
| 10/05/10 | 2337 | OAH | EXHIBITS - HEARING--EXHIBIT 420 A-C |
| 10/05/10 | 2338 | OAH | EXHIBITS - HEARING--EXHIBIT 421 |
| 10/05/10 | 2335 | OAH | EXHIBITS - HEARING--EXHIBIT 418 |
| 10/05/10 | 2333 | OAH | EXHIBITS - HEARING--EXHIBIT 415 |
| 10/05/10 | 2332 | OAH | EXHIBITS - HEARING--EXHIBIT 414 A-H |
| 10/05/10 | 1736 | OAH | EXHIBITS - HEARING--EXHIBIT 532 |
| 10/05/10 | 2329 | OAH | EXHIBITS - HEARING--EXHIBIT 411 |
| 10/05/10 | 2339 | OAH | EXHIBITS - HEARING--EXHIBIT 422 |
| 10/05/10 | 2331 | OAH | EXHIBITS - HEARING--EXHIBIT 413 |
| 10/05/10 | 2336 | OAH | EXHIBITS - HEARING--EXHIBIT 419 |
| 10/05/10 | 2334 | OAH | EXHIBITS - HEARING--EXHIBIT 416 |
| 10/04/10 | 2318 | OAH | EXHIBITS - HEARING--EXHIBIT 163 |
| 10/04/10 | 201010-55120-01 | NOCAPX2020 AND UNITED CITIZEN ACTION NETWORK | EXHIBITS - HEARING--TESTIMONY OF MICHAEL L ALBRECHT - EXHIBIT 1A - RESUME |
| 10/04/10 | 201010-55172-01 | RANDY SCHROEDER, ET AL. | RECONSIDERATION--COVER |
| 10/04/10 | 2322 | OAH | EXHIBITS - HEARING--EXHIBIT 405 |
| 10/04/10 | 201010-55172-02 | RANDY SCHROEDER, ET AL. | RECONSIDERATION--PETITION |
| 10/04/10 | 2314 | OAH | EXHIBITS - HEARING--EXHIBIT 162A |
| 10/04/10 | 2323 | OAH | EXHIBITS - HEARING--EXHIBIT 406 |
| 10/04/10 | 2324 | OAH | EXHIBITS - HEARING--EXHIBIT 407 A-D |
| 10/04/10 | 2315 | OAH | EXHIBITS - HEARING--EXHIBIT 162B |
| 10/04/10 | 201010-55117-01 | NOCAPX2020 AND UNITED CITIZEN ACTION NETWORK | PROTECTIVE AGREEMENT--LETTER AND EXECUTED NONDISCLOSURE AGREEMENT |
| 10/04/10 | 2309 | OAH | EXHIBITS - HEARING--EXHIBIT 528 |
| 10/04/10 | 201010-55129-01 | GREAT RIVER ENERGY ON BEHALF OF ITSELF AND NORTHERN STATES POWER COMPANY | PROTECTIVE AGREEMENT |
| 10/04/10 | 2320 | OAH | EXHIBITS - HEARING--EXHIBIT 403 |
| 10/04/10 | 201010-55118-01 | NOCAPX2020 AND UNITED CITIZEN ACTION NETWORK | LETTER--WITHDRAWAL OF SUBPOENA REQUESTS - DNR |
| 10/04/10 | 2317 | OAH | EXHIBITS - HEARING--EXHIBIT 162D |
| 10/04/10 | 1737 | OAH | EXHIBITS - HEARING--EXHIBITS 516-530 |
| 10/04/10 | 2313 | OAH | EXHIBITS - HEARING--EXHIBIT 161 |
| 10/04/10 | 2312 | OAH | EXHIBITS - HEARING--EXHIBIT 531 |
| 10/04/10 | 2327 | OAH | EXHIBITS - HEARING--EXHIBIT 409 |
| 10/04/10 | 2310 | OAH | EXHIBITS - HEARING--EXHIBIT 529 |
| 10/04/10 | 2319 | OAH | EXHIBITS - HEARING--EXHIBIT 164 |
| 10/04/10 | 2311 | OAH | EXHIBITS - HEARING--EXHIBIT 530 |
| 10/04/10 | 2316 | OAH | EXHIBITS - HEARING--EXHIBIT 162C |
| 10/04/10 | 1737 | OAH | EXHIBITS - HEARING--EXHIBITS 516-530 |
| 10/04/10 | 2321 | OAH | EXHIBITS - HEARING--EXHIBIT 404 |
| 10/04/10 | 2326 | OAH | EXHIBITS - HEARING--EXHIBIT 408 |
| 10/04/10 | 1738 | OAH | EXHIBITS - HEARING--EXHIBIT 527 |
| 10/01/10 | 201010-55109-01 | OAH | ORDER--PROTECTIVE ORDER |
| 10/01/10 | 201010-55109-02 | OAH | ORDER--COVER LETTER AND SERVICE LIST |
| 10/01/10 | 201010-55096-01 | DOC OES EFP | LETTER--PROPOSED PROTECTIVE ORDER & LTR TO LUIS |
| 09/30/10 | 20109-55018-01 | DOC OES | NOTICE--NOTICE OF PUBLIC HEARING REMAND PUBLICATION_AFFIDAVIT |
| 09/30/10 | 20109-55052-01 | DOC OES | NOTICE--MAILED NOTICE OF PUBLIC HEARING_AFFIDAVIT |
| 09/29/10 | 20109-54928-01 | NOCAPX 2020 AND UNITED CITIZENS ACTION NETWORK | LETTER--RESPONSE TO MOES OBJECTION |
| 09/29/10 | 20109-54935-02 | OAG/DNR | LETTER--LETTER TO JUDGE |
| 09/29/10 | 20109-54944-01 | NOCAPX 2020 AND UNITED CITIZENS ACTION NETWORK | LETTER---RESPONSE TO DNR LETTER |
| 09/29/10 | 20109-54935-01 | OAG/DNR | LETTER--SERVICE LETTER, SERVICE LIST AND AFFIDAVIT OF SERVICE |
| 09/28/10 | 20109-54919-01 | DOC OES EFP | MOTION--OES EFP LETTER TO JUDGE LUIS |
| 09/28/10 | 20109-54890-01 | NOCAPX 2020 AND UNITED CITIZENS ACTION NETWORK | LETTER--WITHDRAWAL OF SUBPOENA OF SEYKORA MNDOT |
| 09/27/10 | 20109-54821-01 | NOCAPX 2020 AND UNITED CITIZENS ACTION NETWORK | OTHER--COVER LETTER AND SUBPOENA REQUESTS |
| 09/24/10 | 20109-54807-01 | PUC | PUBLIC COMMENT |
| 09/24/10 | 20109-54786-01 | NOCAPX 2020 AND U-CAN | EXHIBITS - HEARING--PROPOSED WITNESS AND EXHIBIT LIST |
| 09/23/10 | 20109-54732-01 | GREAT RIVER ENERGY AND XCEL ENERGY | OTHER--APPLICANTS WITNESS AND EXHIBIT LISTS |
| 09/21/10 | 20109-54660-01 | GREAT RIVER ENERGY AND ON BEHALF OF APPLICANT NORTHERN STATES POWER COMPANY | TESTIMONY--CORRECTED PAGE 18 OF LESHER REMAND TESTIMONY |
| 09/20/10 | 20109-54610-01 | STATE REPRESENTATIVE PAUL TORKELSON | LETTER |
| 09/15/10 | 20109-54479-01 | PUC | NOTICE--AVAILABILITY OF FINAL ORDER |
| 09/14/10 | 20109-54429-01 | PUC | ORDER--GRANTING ROUTE PERMIT |
| 09/14/10 | 20109-54422-01 | BROWN COUNTY BOARD OF COMMISSIONERS | LETTER |
| 09/14/10 | 20109-54429-02 | PUC | ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 09/10/10 | 20109-54353-07 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--EXHIBIT MLA-7B2B1 UNDERGROUND ESTIMATE ST CLOUD MONTICELLO RIVER CROSSING |
| 09/10/10 | 20109-54342-01 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--DIRECT TESTIMONY OF MICHAEL ALBRECHT |
| 09/10/10 | 20109-54353-06 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--EXHIBIT MLA-7B2A UNDERGROUND ESTIMATE ST CLOUD MONTICELLO RIVER CROSSING |
| 09/10/10 | 20109-54338-01 | GREAT RIVER ENERGY AND ON BEHALF OF CO-APPLICANT NORTHERN STATES POWER COMPANY | TESTIMONY--FILING LETTER, CERTIFICATE OF SERVICE FOR REMAND TESTIMONY AND SCHEDULES OF DANIEL LESHER AND KEVIN LENNON |
| 09/10/10 | 20109-54353-03 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--EXHIBIT MLA-8B1 UNDERGROUND ESTIMATE ALMA RIVER CROSSING |
| 09/10/10 | 20109-54353-09 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--EXHIBIT MSK-3 DUANE KAMRATH LETTER JAN 4 2010 |
| 09/10/10 | 20109-54342-04 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--EXHIBIT MLA-4 CAPX MAY 13 LETTER TO USFWS - EAGLE NEST SURVEY |
| 09/10/10 | 20109-54338-06 | GREAT RIVER ENERGY AND ON BEHALF OF CO-APPLICANT NORTHERN STATES POWER COMPANY | TESTIMONY--LESHER SCHEDULES 4-11, FILE 5 OF 5 |
| 09/10/10 | 20109-54356-01 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--MSK-1 TESTIMONY OF MARK AND SHIRLEY KATZENMEYER |
| 09/10/10 | 20109-54342-06 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--MLA-6 UNDERGROUND ESTIMATE HWY 70 |
| 09/10/10 | 20109-54353-08 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--EXHIBIT MSK-2 MYRICK ROUTE POORKER SCHED 50 |
| 09/10/10 | 20109-54342-03 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--EXHIBIT MLA-3 DNR LETTERS |
| 09/10/10 | 20109-54342-05 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--MLA-5 UNDERGROUND RIVER CROSSING ESTIMATE OCTOBER 30 2009 |
| 09/10/10 | 20109-54356-04 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--EXHIBIT MSK-4 CITY OF LESUEUR LETTER JUNE 2 2010 |
| 09/10/10 | 20109-54331-01 | DOC OES | NOTICE--NOTICE OF PUBLIC HEARING |
| 09/10/10 | 20109-54353-02 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--EXHIBIT MLA-7B1 UNDERGROUND ESTIMATE ST CLOUD MONTICELLO |
| 09/10/10 | 20109-54338-02 | GREAT RIVER ENERGY AND ON BEHALF OF CO-APPLICANT NORTHERN STATES POWER COMPANY | TESTIMONY--DANIEL LESHER REMAND DIRECT TESTIMONY AND SCHEDULES 1-2 FILE 1 OF 5 |
| 09/10/10 | 20109-54356-02 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--EXHIBIT MSK-2 MYRICK ALTERNATIVE POORKER SCHED 50 |
| 09/10/10 | 20109-54353-05 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--EXHIBIT MLA-11 BELLE PLAINE MAP FROM USFWSLETTER TO APPLICANTS FEB 8 2010 |
| 09/10/10 | 20109-54338-05 | GREAT RIVER ENERGY AND ON BEHALF OF CO-APPLICANT NORTHERN STATES POWER COMPANY | TESTIMONY--LESHER SCHEDULE 3, PART 3 OF 3, FILE 4 OF 5 |
| 09/10/10 | 20109-54353-04 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--EXHIBIT MLA-8B2 UNDERGROUND ESTIMATE ALMA RIVER CROSSING |
| 09/10/10 | 20109-54342-02 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--EXHIBIT MLA-2 - USFWS CORRESPONDENCE |
| 09/10/10 | 20109-54353-10 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--EXHIBIT MSK-4 CITY OF LESUEUR LETTER JAN 2 2010 |
| 09/10/10 | 20109-54338-03 | GREAT RIVER ENERGY AND ON BEHALF OF CO-APPLICANT NORTHERN STATES POWER COMPANY | TESTIMONY--LESHER SCHEDULE 3, PART 1 OF 3, FILE 2 OF 5 |
| 09/10/10 | 20109-54353-01 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--MLA-8A UNDERGROUND ESTIMATE ALMA RIVER CROSSING |
| 09/10/10 | 20109-54356-03 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--EXHIBIT MSK-3 KAMRATH LETTER JUNE 4 2010 |
| 09/10/10 | 20109-54342-08 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--MLA-10 AERIAL PHOTO FROM DNR WITH EAGLE NEST |
| 09/10/10 | 20109-54338-04 | GREAT RIVER ENERGY AND ON BEHALF OF CO-APPLICANT NORTHERN STATES POWER COMPANY | TESTIMONY--LESHER SCHEDULE 3, PART 2 OF 3, FILE 3 OF 5 |
| 09/10/10 | 20109-54342-07 | NOCAPX2020 AND UNITED CITIZENS ACTION NETWORK | TESTIMONY--MLA-9 LETTERS FROM NONGAME DNR |
| 09/10/10 | 20109-54338-07 | GREAT RIVER ENERGY AND ON BEHALF OF CO-APPLICANT NORTHERN STATES POWER COMPANY | TESTIMONY--KEVIN LENNON REMAND DIRECT TESTIMONY AND SCHEDULES 1-2 |
| 09/07/10 | 20109-54171-05 | COURT REPORTER | TRANSCRIPTS--EVIDENTIARY HEARING - VOLUME 3 ST PAUL |
| 09/07/10 | 20109-54169-09 | COURT REPORTER | TRANSCRIPTS--PUBLIC HEARING HENDERSON - AFTERNOON - 12-7-09 |
| 09/07/10 | 20109-54169-01 | COURT REPORTER | TRANSCRIPTS--PUBLIC HEARING GRANITE FALLS - AFTERNOON - 11-30-09 |
| 09/07/10 | 20109-54170-02 | COURT REPORTER | TRANSCRIPTS--PUBLIC HEARING LONSDALE - EVENING - 12-8-09 |
| 09/07/10 | 20109-54171-08 | COURT REPORTER | TRANSCRIPTS--PUC PROCEEDINGS ON 7-15-10 ST PAUL |
| 09/07/10 | 20109-54171-06 | COURT REPORTER | TRANSCRIPTS--EVIDENTIARY HEARING - VOLUME 4 ST PAUL |
| 09/07/10 | 20109-54170-04 | COURT REPORTER | TRANSCRIPTS--PUBLIC HEARING LAKEVILLE - EVENING - 12-10-09 |
| 09/07/10 | 20109-54170-07 | COURT REPORTER | TRANSCRIPTS--PUBLIC HEARING NEW PRAGUE - AFTERNOON - 12-28-09 |
| 09/07/10 | 20109-54171-09 | COURT REPORTER | TRANSCRIPTS--PREHEARING CONFERENCE ON REMAND ON 8-16-10 ST PAUL |
| 09/07/10 | 20109-54169-05 | COURT REPORTER | TRANSCRIPTS--PUBLIC HEARING REDWOOD FALLS - AFTERNOON - 12-2-09 |
| 09/07/10 | 20109-54169-03 | COURT REPORTER | TRANSCRIPTS--PUBLIC HEARING MARSHALL - AFTERNOON - 12-1-09 |
| 09/07/10 | 20109-54171-03 | COURT REPORTER | TRANSCRIPTS--EVIDENTIARY HEARING - VOLUME 2A ST PAUL |
| 09/07/10 | 20109-54170-03 | COURT REPORTER | TRANSCRIPTS--PUBLIC HEARING LAKEVILLE - AFTERNOON - 12-10-09 |
| 09/07/10 | 20109-54170-05 | COURT REPORTER | TRANSCRIPTS--PUBLIC HEARING LAKEVILLE - PART 1 OF 2 - 12-11-09 |
| 09/07/10 | 20109-54169-10 | COURT REPORTER | TRANSCRIPTS--PUBLIC HEARING HENDERSON - EVENING - 12-7-09 |
| 09/07/10 | 20109-54169-08 | COURT REPORTER | TRANSCRIPTS--PUBLIC HEARING WINTHROP - EVENING - 12-3-09 |
| 09/07/10 | 20109-54169-07 | COURT REPORTER | TRANSCRIPTS--PUBLIC HEARING WINTHROP - AFTERNOON - 12-3-09 |
| 09/07/10 | 20109-54171-02 | COURT REPORTER | TRANSCRIPTS--EVIDENTIARY HEARING - VOLUME 1BST PAUL |
| 09/07/10 | 20109-54169-04 | COURT REPORTER | TRANSCRIPTS--PUBLIC HEARING MARSHALL - EVENING - 12-1-09 |
| 09/07/10 | 20109-54170-01 | COURT REPORTER | TRANSCRIPTS--PUBLIC HEARING LONSDALE - AFTERNOON - 12-8-09 |
| 09/07/10 | 20109-54198-01 | PUC | PUBLIC COMMENT |
| 09/07/10 | 20109-54171-01 | COURT REPORTER | TRANSCRIPTS--EVIDENTIARY HEARING - VOLUME 1A ST PAUL |
| 09/07/10 | 20109-54169-02 | COURT REPORTER | TRANSCRIPTS--PUBLIC HEARING GRANITE FALLS - EVENING - 11-30-09 |
| 09/07/10 | 20109-54169-06 | COURT REPORTER | TRANSCRIPTS--PUBLIC HEARING REDWOOD FALLS - EVENING - 12-2-09 |
| 09/07/10 | 20109-54171-04 | COURT REPORTER | TRANSCRIPTS--EVIDENTIARY HEARING - VOLUME 2B ST PAUL |
| 09/07/10 | 20109-54171-07 | COURT REPORTER | TRANSCRIPTS--PUC PROCEEDINGS ON 7-13-10 ST PAUL |
| 09/07/10 | 20109-54170-08 | COURT REPORTER | TRANSCRIPTS--PUBLIC HEARING NEW PRAGUE - EVENING - 12-28-09 |
| 09/07/10 | 20109-54170-06 | COURT REPORTER | TRANSCRIPTS--PUBLIC HEARING LAKEVILLE - PART 2 OF 2 - 12-11-09 |
| 08/18/10 | 20108-53615-01 | OAH | ORDER--FIRST PREHEARING ORDER ON REMAND |
| 08/13/10 | 20108-53494-01 | PUC | MINUTES--JULY 15, 2010 AGENDA MEETING |
| 08/12/10 | 20108-53449-01 | OAH | NOTICE--NOTICE OF PREHEARING CONFERENCE ON AUGUST 16, 2010 |
| 07/27/10 | 20107-52970-01 | PUC | ORDER--REMANDING TO OFFICE OF ADMINISTRATIVE HEARINGS |
| 07/19/10 | 20107-52715-01 | PUC | PUBLIC COMMENT--7-19-2010 |
| 07/15/10 | 20107-52599-01 | ROBERT & PATRICIA JOHNSON | LETTER--PERMIT CONDITIONS |
| 07/14/10 | 20107-52573-01 | GREAT RIVER ENERGY AND XCEL ENERGY | LETTER |
| 07/14/10 | 20107-52547-01 | PUC | HANDOUT - COMMISSION--JULY 13, 2010 MEETING - PUBLIC COMMENT EXHIBITS |
| 07/14/10 | 20107-52578-01 | DOC OES | BRIEFING PAPERS--SECOND ERRATA TO PROPOSED ROUTE PERMIT 071410 |
| 07/13/10 | 20107-52533-01 | DOC OES | HANDOUT - COMMISSION--OES EFP CHANGES AND ADDITIONS TO PROPOSED ROUTE PERMIT A AND B |
| 07/08/10 | 20107-52378-01 | DOC OES | BRIEFING PAPERS--ERRATA TO OES BRIEFING PAPERS |
| 07/06/10 | 20107-52304-01 | PUC | PUBLIC COMMENT |
| 07/02/10 | 20107-52220-01 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - SD TO LYON - 1 OF 6 |
| 07/02/10 | 20107-52223-01 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - CEDAR MTN TO HELENA - 1 OF 7 |
| 07/02/10 | 20107-52220-05 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - SD TO LYON - 5 OF 6 |
| 07/02/10 | 20107-52224-01 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - HELENA TO LK MARION - 1 OF 2 |
| 07/02/10 | 20107-52222-03 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - LYON TO CEDAR MTN - 3 OF 5 |
| 07/02/10 | 20107-52221-02 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - LYON TO MN VALLEY - 2 OF 4 |
| 07/02/10 | 20107-52220-04 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - SD TO LYON - 4 OF 6 |
| 07/02/10 | 20107-52221-01 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - LYON TO MN VALLEY - 1 OF 4 |
| 07/02/10 | 20107-52224-03 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - LK MARION TO HAMPTON - 1 OF 2 |
| 07/02/10 | 20107-52224-04 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - LK MARION TO HAMPTON - 2 OF 2 |
| 07/02/10 | 20107-52223-05 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - CEDAR MTN TO HELENA - 5 OF 7 |
| 07/02/10 | 20107-52220-02 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - SD TO LYON - 2 OF 6 |
| 07/02/10 | 20107-52222-01 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - LYON TO CEDAR MTN - 1 OF 5 |
| 07/02/10 | 20107-52221-04 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - LYON TO MN VALLEY - 4 OF 4 |
| 07/02/10 | 20107-52222-04 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - LYON TO CEDAR MTN - 4 OF 5 |
| 07/02/10 | 20107-52223-03 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - CEDAR MTN TO HELENA - 3 OF 7 |
| 07/02/10 | 20107-52221-03 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - LYON TO MN VALLEY - 3 OF 4 |
| 07/02/10 | 20107-52223-04 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - CEDAR MTN TO HELENA - 4 OF 7 |
| 07/02/10 | 20107-52224-02 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - HELENA TO LK MARION - 2 OF 2 |
| 07/02/10 | 20107-52222-02 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - LYON TO CEDAR MTN - 2 OF 5 |
| 07/02/10 | 20107-52245-01 | DOC OES | BRIEFING PAPERS--REVISED - OES RECOMMENDATIONS, FINDINGS, AND PERMIT |
| 07/02/10 | 20107-52220-03 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - SD TO LYON - 3 OF 6 |
| 07/02/10 | 20107-52222-05 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - LYON TO CEDAR MTN - 5 OF 5 |
| 07/02/10 | 20107-52223-07 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - CEDAR MTN TO HELENA - 7 OF 7 |
| 07/02/10 | 20107-52220-06 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - SD TO LYON - 6 OF 6 |
| 07/02/10 | 20107-52223-06 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - CEDAR MTN TO HELENA - 6 OF 7 |
| 07/02/10 | 20107-52223-02 | DOC OES | BRIEFING PAPERS--ROUTE MAPS - CEDAR MTN TO HELENA - 2 OF 7 |
| 07/02/10 | 20107-52219-01 | DOC OES | BRIEFING PAPERS--OES RECOMMEDATIONS, FINDINGS, AND PERMIT |
| 07/01/10 | 20107-52197-02 | PUC | NOTICE OF COMMISSION MEETING--JULY 13 AND 15 AGENDA MEETING |
| 07/01/10 | 20107-52190-01 | GREAT RIVER ENERGY AND XCEL ENERGY | LETTER |
| 06/21/10 | 20106-51812-01 | PUC | PUBLIC COMMENT--PC 08-1474 |
| 06/15/10 | 20106-51560-02 | DOC OES | LETTER--LETTER FROM USFWS-2 061110 |
| 06/15/10 | 20106-51560-01 | DOC OES | LETTER--LETTER FROM USFWS 061110 |
| 06/14/10 | 20106-51501-01 | PUC | PUBLIC COMMENT |
| 05/26/10 | 20105-50836-01 | GREAT RIVER ENERGY AND ON BEHALF OF CO-APPLICANT NORTHERN STATES POWER COMPANY | LETTER--CORRECTED LETTER TO USFWS SUBMISSION FILED 5-24-2010 |
| 05/24/10 | 20105-50722-01 | GREAT RIVER ENERGY AND ON BEHALF OF ITS CO-APPLICANT NORTHERN STATES POWER COMPANY | OTHER--RESPONSE TO NOCAPX2020 AND UCAN MOTION |
| 05/24/10 | 20105-50749-07 | GREAT RIVER ENERGY & CO-APPLICANT NORTHERN STATES POWER COMPANY | OTHER--ATTACHMENT 10 PART 2 OF 3 |
| 05/24/10 | 20105-50749-09 | GREAT RIVER ENERGY AND CO-APPLICANT NORTHERN STATES POWER COMPANY | OTHER--ATTACHMENTS 13-14, CERT OF SERVICE AND SERVICE LIST |
| 05/24/10 | 20105-50749-05 | GREAT RIVER ENERGY AND CO-APPLICANT NORTHERN STATES POWER COMPANY | OTHER--ATTACHMENT 9 PART 3 OF 4 |
| 05/24/10 | 20105-50749-03 | GREAT RIVER ENERGY AND CO-APPLICANT NORTHERN STATES POWER COMPANY | OTHER--ATTACHMENTS 7-8, ATTACHMENT 9 PART 1 OF 4 |
| 05/24/10 | 20105-50749-01 | GREAT RIVER ENERGY AND CO-APPLICANT NORTHERN STATES POWER COMPANY | OTHER--SUBMISSION LTR TO USFWS ATTACHMENT 1 ATTACHMENT 2 PART 1 OF 2 |
| 05/24/10 | 20105-50749-04 | GREAT RIVER ENERGY AND CO-APPLICANT NORTHERN STATES POWER COMPANY | OTHER--ATTACHMENT 9 PART 2 OF 4 |
| 05/24/10 | 20105-50749-06 | GREAT RIVER ENERGY AND CO-APPLICANT NORTHERN STATES POWER COMPANY | OTHER--ATTACHMENT 9, ATTACHMENT 10 PART 1 OF 3 |
| 05/24/10 | 20105-50749-02 | GREAT RIVER ENERGY AND CO-APPLICANT NORTHERN STATES POWER COMPANY | OTHER--ATTACHMENT 2 PART 2 OF 2, ATTACHMENTS 3-6 |
| 05/24/10 | 20105-50749-08 | GREAT RIVER ENERGY AND CO-APPLICANT NORTHERN STATES POWER COMPANY | OTHER--ATTACHMENT 10 PART 3 OF 3, ATTACHMENTS 11-12 |
| 05/20/10 | 20105-50653-01 | NOCAPX 2020 AND UNITED CITIZENS ACTION NETWORK | MOTION--TO SUSPEND PROCEEDINGS |
| 05/19/10 | 20105-50597-01 | R. & P. JOHNSON | OTHER--CHANGE IN TIMING LETTER APPLICANTS NOTICE AND COST RECOVERY ORDER RE PROJECT DELAY |
| 05/10/10 | 20105-50297-01 | PUC | PUBLIC COMMENT |
| 05/07/10 | 20105-50259-01 | NOCAPX 2020 & U-CAN | OTHER--EXCEPTIONS TO ALJ RECOMMENDATION OF NOCAPX AND U-CAN FORMAT PROBLEMS |
| 05/07/10 | 20105-50252-01 | KATZENMEYER | LETTER--KATZENMEYER EXCEPTIONS TO RECOMMENDATION OF ALJ |
| 05/07/10 | 20105-50262-01 | NOCAPX 2020 & U-CAN | OTHER--NOCAPX UCAN EXCEPTIONS CORRECTED |
| 05/07/10 | 20105-50185-01 | BIMEDA | OTHER--EXCEPTIONS TO FINDINGS OF FACT, CONCLUSION AND RECOMMENDATIONS |
| 05/06/10 | 20105-50164-01 | OAH | OTHER--CERTIFICATE OF CONTESTED CASE RECORD AND HEARING RECORD |
| 05/05/10 | 20105-50105-01 | OAH | OTHER--HEARING EXHIBIT LIST |
| 05/04/10 | 20105-50069-02 | OAH | EXHIBITS - HEARING--EXHIBIT 236 - ERATUM PAGE 16 TO MACDONAGH DIRECT - EX 201 |
| 05/04/10 | 20105-50069-01 | OAH | EXHIBITS - HEARING--EXHIBIT 235 - ERATUM PAGE 12 TO MACDONAGH DIRECT - EX 201 |
| 05/03/10 | 20105-50033-01 | PUC | PUBLIC COMMENT |
| 04/30/10 | 20104-49902-01 | OAH | OTHER--AMENDMENTS TO FINDINGS OF FACT, CONCLUSIONS, AND RECOMMENDATION |
| 04/27/10 | 20104-49641-01 | OAH | COMMENTS--AFFIDAVIT OF STEPHEN COMAN ON BEHALF OF RES PYROTECHNICS - SERVED BY EMAIL ON MARCH 3 BUT NOT EFILED |
| 04/27/10 | 20104-49641-02 | OAH | COMMENTS--MARCH 9 COMMENT OF RES PYROTECHNICS - SERVED BY EMAIL BUT NOT EFILED |
| 04/22/10 | 20104-49479-01 | OAH | LETTER--OAH FILING LETTER |
| 04/22/10 | 20104-49478-01 | OAH | ORDER--CAPX 2020 FINDINGS OF FACT CONCLUSIONS AND RECOMMENDATION |
| 04/01/10 | 20104-48694-01 | OAH | LETTER--ALJ - EMAIL ADMITTING DOCUMENTS AND CLOSING HEARING RECORD |
| 03/19/10 | 20103-48168-01 | R. & P. JOHNSON | LETTER--RESPONDING TO PROPOSED SUPPLEMENTAL FINDINGS |
| 03/16/10 | 20103-48089-01 | DOC OES EFP | COMMENTS--OES EFP FINAL POST HEARING COMMENTS |
| 03/16/10 | 20103-48066-01 | R. & P. JOHNSON | REPLY BRIEF--LETTER R. & P. JOHNSON |
| 03/16/10 | 20103-48066-02 | R. & P. JOHNSON | REPLY BRIEF--R. & P. JOHNSON |
| 03/16/10 | 20103-48090-03 | GREAT RIVER ENERGY AND ON BEHALF OF NORTHERN STATES POWER COMPANY | REPLY BRIEF |
| 03/16/10 | 20103-48090-02 | GREAT RIVER ENERGY AND ON BEHALF OF NORTHERN STATES POWER COMPANY | REPLY BRIEF--FILING LETTER |
| 03/16/10 | 20103-48090-01 | GREAT RIVER ENERGY AND ON BEHALF OF NORTHERN STATES POWER COMPANY | REPLY BRIEF--SUPPLEMENTAL FINDINGS OF FACT, MODIFIED CONCLUSIONS OF LAW, AND RECOMMENDATION |
| 03/12/10 | 20103-47972-01 | NOCAPX 2020 & UNITED CITIZENS ACTION NETWORK | REPLY BRIEF |
| 03/08/10 | 20103-47818-01 | DOC OES | COMMENTS--POST-HEARING BRIEF |
| 03/08/10 | 20103-47819-01 | NOCAPX 2020 & U-CAN | OTHER--NOCAPX & U-CAN PROPOSED FINDINGS COMPLETE WITH FORMAT PROBLEMS |
| 03/08/10 | 20103-47786-01 | R. & P. JOHNSON | OTHER--COVER LETTER - PROPOSED FINDINGS & CONCLUSIONS |
| 03/08/10 | 20103-47786-02 | R. & P. JOHNSON | OTHER--PROPOSED FINDINGS OF FACT, CONCLUSIONS OF LAW |
| 03/07/10 | 20103-47782-02 | COURT REPORTER | TRANSCRIPTS--TELEPHONE CONFERENCE ON 12/30/2009 TELEPHONICALLY |
| 03/07/10 | 20103-47782-01 | COURT REPORTER | TRANSCRIPTS--PREHEARING CONFERENCE ON 11/24/2009 TELEPHONICALLY |
| 02/25/10 | 20102-47454-02 | DOC OES | NOTICE--NOTICE OF AVAILABILITY OF FEIS - EQB MONITOR |
| 02/25/10 | 20102-47461-01 | OAH | COMMENTS--LATE COMMENT OF RES PYROTECHNICS ADMITTED TO THE RECORD BY ALJ |
| 02/25/10 | 20102-47460-01 | OAH | ORDER--ORDER ON MOTION TO STRIKE AND ADMITTING LATE-FILED COMMENT TO THE RECORD |
| 02/25/10 | 20102-47454-01 | DOC OES | NOTICE--NOTICE OF AVAILABILITY OF FEIS - NEWSPAPERS |
| 02/22/10 | 20102-47327-01 | GREAT RIVER ENERGY AND XCEL ENERGY | REPLY BRIEF--RESPONSE TO MOTIONS |
| 02/17/10 | 20102-47108-01 | DOC OES | LETTER--POST-HEARING BRIEF OES |
| 02/17/10 | 20102-47143-01 | OAH | LETTER--ALJ EMAIL ADJUSTING DEADLINES |
| 02/16/10 | 20102-47092-03 | NORTHERN STATES POWER COMPANY AND GREAT RIVER ENERGY | BRIEF--3 OF 3 |
| 02/16/10 | 20102-47080-02 | R. & P. JOHNSON | BRIEF--LETTER POST-HEARING BRIEF R. & P. JOHNSON |
| 02/16/10 | 20102-47095-03 | NORTHERN STATES POWER COMPANY AND GREAT RIVER ENERGY | BRIEF--ATTACHMENT 2 -PT 3 OF 3 |
| 02/16/10 | 20102-47095-05 | NORTHERN STATES POWER COMPANY AND GREAT RIVER ENERGY | BRIEF--ATTACHMENT 2 -PT 1 OF 3 |
| 02/16/10 | 20102-47095-08 | NORTHERN STATES POWER COMPANY AND GREAT RIVER ENERGY | BRIEF--ATTACHMENT 6 |
| 02/16/10 | 20102-47092-02 | NORTHERN STATES POWER COMPANY AND GREAT RIVER ENERGY | BRIEF--2 OF 3 |
| 02/16/10 | 20102-47095-06 | NORTHERN STATES POWER COMPANY AND GREAT RIVER ENERGY | BRIEF--ATTACHMENT 1 |
| 02/16/10 | 20102-47095-01 | NORTHERN STATES POWER COMPANY AND GREAT RIVER ENERGY | BRIEF--ATTACHMENT 7 |
| 02/16/10 | 20102-47095-02 | NORTHERN STATES POWER COMPANY AND GREAT RIVER ENERGY | BRIEF--ATTACHMENT 4 |
| 02/16/10 | 20102-47092-01 | NORTHERN STATES POWER COMPANY AND GREAT RIVER ENERGY | BRIEF--1 OF 3 |
| 02/16/10 | 20102-47069-01 | NOCAPX 2020 & UNITED CITIZENS ACTION NETWORK | MOTION--MOTION TO STRIKE APPLICANTS 2/8/10 "COMMENT" |
| 02/16/10 | 20102-47095-09 | NORTHERN STATES POWER COMPANY AND GREAT RIVER ENERGY | BRIEF--ATTACHMENT 2-PT 2 OF 3 |
| 02/16/10 | 20102-47095-04 | NORTHERN STATES POWER COMPANY AND GREAT RIVER ENERGY | BRIEF--ATTACHMENT 5 |
| 02/16/10 | 20102-47095-07 | NORTHERN STATES POWER COMPANY AND GREAT RIVER ENERGY | BRIEF--ATTACHMENT 3 |
| 02/16/10 | 20102-47080-01 | R. & P. JOHNSON | BRIEF--POST-HEARING BRIEF R. & P. JOHNSON |
| 02/16/10 | 20102-47105-01 | NOCAPX & U-CAN INITIAL BRIEF | BRIEF--INITIAL BRIEF |
| 02/12/10 | 20102-47014-01 | OAH | COMMENTS--TWO PUBLIC COMMENTS |
| 02/10/10 | 20102-46952-03 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS |
| 02/10/10 | 20102-46952-04 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS |
| 02/10/10 | 20102-46952-02 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS |
| 02/10/10 | 20102-46952-01 | OAH | COMMENTS--MN DNR COMMENTS |
| 02/09/10 | 20102-46903-01 | US FISH & WILDLIFE SERVICE | COMMENTS |
| 02/08/10 | 20102-46898-04 | APPLICANTS GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | COMMENTS--ATTACHMENT 1-3 OF 3 |
| 02/08/10 | 20102-46900-04 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS |
| 02/08/10 | 20102-46900-05 | OAH | COMMENTS--HELMBERGER PUBLIC COMMENTS PART 1 OF 2 |
| 02/08/10 | 20102-46900-06 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS |
| 02/08/10 | 20102-46898-02 | APPLICANTS GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | COMMENTS--ATTACHMENT 2-PARALLEL TO ROW, 1 OF 2 |
| 02/08/10 | 20102-46900-02 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS |
| 02/08/10 | 20102-46898-03 | APPLICANTS GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | COMMENTS--ATTACHMENT 5-REPORT |
| 02/08/10 | 20102-46898-01 | APPLICANTS GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | COMMENTS--ATTACHMENT 3-CROSS ROW |
| 02/08/10 | 20102-46900-07 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS |
| 02/08/10 | 20102-46898-06 | APPLICANTS GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | COMMENTS--ATTACHMENT 2-PARALLEL TO ROW, 2 OF 2 |
| 02/08/10 | 20102-46898-07 | APPLICANTS GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | COMMENTS--ATTACHMENT 1-NARROWED CORRIDOR MAPS, 1 OF 3 |
| 02/08/10 | 20102-46900-01 | OAH | COMMENTS--HELMBERGER PUBLIC COMMENTS PART 1 OF 2 |
| 02/08/10 | 20102-46898-09 | APPLICANTS GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | COMMENTS--ATTACHMENT 1-2 OF 3 |
| 02/08/10 | 20102-46898-05 | APPLICANTS GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | COMMENTS--LETTER |
| 02/08/10 | 20102-46900-03 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS |
| 02/08/10 | 20102-46898-08 | APPLICANTS GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | COMMENTS--ATTACHMENT 4-BIRDS EYE VIEW |
| 02/05/10 | 20102-46839-01 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS |
| 02/05/10 | 20102-46797-01 | DOC OES | OTHER--LETTER AND FEIS TO LIBRARIES |
| 02/04/10 | 20102-46790-01 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS |
| 02/02/10 | 20102-46701-01 | OAH | PUBLIC COMMENT--VARIOUS PUBLIC COMMENTS |
| 01/29/10 | 20101-46568-02 | OAH | COMMENTS--BIMEDA COMMENT LETTER AND ATTACHMENT A AND ATTACHMENTS F-J |
| 01/29/10 | 20101-46568-03 | OAH | COMMENTS--BIMEDA COMMENT ATTACHMENTS B AND C |
| 01/29/10 | 20101-46568-01 | OAH | COMMENTS--BIMEDA COMMENT ATTACHMENTS D AND E |
| 01/29/10 | 20101-46593-01 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS |
| 01/28/10 | 20101-46510-01 | DOC OES | NOTICE--OF AVAILABILITY OF FINAL EIS |
| 01/27/10 | 20101-46485-01 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS |
| 01/27/10 | 20101-46484-01 | OAH | LETTER--PUBLIC COMMENT DEADLINE FEBRUARY 8 - OTHER DEADLINES SET |
| 01/26/10 | 20101-46444-05 | DOC OES | REPORT--5 - FINAL EIS - ORAL COMMENTS |
| 01/26/10 | 20101-46444-02 | DOC OES | REPORT--2 - FINAL EIS - WRITTEN COMMENTS 1 OF 3 |
| 01/26/10 | 20101-46444-01 | DOC OES | REPORT--3 - FINAL EIS - WRITTEN COMMENTS 2 OF 3 |
| 01/26/10 | 20101-46445-03 | DOC OES | REPORT--9 - FINAL EIS - APPENDIX D TO G |
| 01/26/10 | 20101-46445-01 | DOC OES | REPORT--8 - FINAL EIS - APPENDIX C |
| 01/26/10 | 20101-46444-04 | DOC OES | REPORT--4 - FINAL EIS - WRITTEN COMMENTS 3 OF 3 |
| 01/26/10 | 20101-46433-03 | OAH | COMMENTS--KRUGER COMMENTS |
| 01/26/10 | 20101-46433-01 | OAH | COMMENTS--HOWARD - MAJESTIC HILLS RANCH |
| 01/26/10 | 20101-46444-03 | DOC OES | REPORT--1 - FINAL EIS - INTRODUCTION |
| 01/26/10 | 20101-46445-02 | DOC OES | REPORT--6 - FINAL EIS - APPENDIX A |
| 01/26/10 | 20101-46445-04 | DOC OES | REPORT--7 - FINAL EIS - APPENDIX B |
| 01/26/10 | 20101-46433-02 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS |
| 01/25/10 | 20101-46381-01 | OAH | COMMENTS--JANUARY 25 PUBLIC COMMENTS |
| 01/22/10 | 20101-46295-01 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS |
| 01/22/10 | 20101-46263-03 | OAH | COMMENTS--OTTO EMAIL COMMENT |
| 01/22/10 | 20101-46263-02 | OAH | COMMENTS--VARIOUS EMAIL COMMENTS |
| 01/22/10 | 20101-46263-04 | OAH | COMMENTS--BALFANY EMAIL COMMENT |
| 01/22/10 | 20101-46263-01 | OAH | COMMENTS--VARIOUS EMAIL COMMENTS |
| 01/21/10 | 20101-46218-01 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS |
| 01/21/10 | 20101-46252-01 | GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | OTHER--AFFIDAVIT OF SERVICE-TRANSCRIPTS FROM PUBLIC & EVIDENTIARY HEARINGS MAILED TO LE SUEUR PUBLIC LIBRARY |
| 01/21/10 | 20101-46243-01 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS |
| 01/21/10 | 20101-46243-02 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS |
| 01/20/10 | 20101-46213-01 | OAH | LETTER--EXTENSION OF PUBLIC COMMENT DEADLINE TO FEBRUARY 8 |
| 01/20/10 | 20101-46178-04 | OAH | EXHIBITS - HEARING--EXHIBIT 381 |
| 01/20/10 | 20101-46178-01 | OAH | EXHIBITS - HEARING--EXHIBIT 387 |
| 01/20/10 | 20101-46179-01 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS |
| 01/20/10 | 20101-46178-02 | OAH | EXHIBITS - HEARING--EXHIBIT 388A |
| 01/20/10 | 20101-46183-01 | OAH | EXHIBITS - HEARING--EXHIBITS 121 AND 122 |
| 01/20/10 | 20101-46178-03 | OAH | EXHIBITS - HEARING--EXHIBIT 383 |
| 01/19/10 | 20101-46105-02 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS 3 |
| 01/19/10 | 20101-46105-01 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS 1 |
| 01/19/10 | 20101-46155-01 | APPLICANT GREAT RIVER ENERGY | LETTER--ADDITIONAL INFORMATION REGARDING THE CROSSOVER ROUTE AND THE MYRICK ALIGNMENT ALTERNATIVE |
| 01/19/10 | 20101-46105-03 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS 2 |
| 01/15/10 | 20101-46013-02 | OAH | EXHIBITS - HEARING--EXHIBIT 384 |
| 01/15/10 | 20101-46052-01 | OAH | LETTER--PUBLIC COMMENT DEADLINE EXTENDED - OTHER DEADLINES SET |
| 01/15/10 | 20101-46013-01 | OAH | EXHIBITS - HEARING--EXHIBIT 393A |
| 01/15/10 | 20101-46010-01 | DOC OES | NOTICE--NOTICE PUBLIC HEARING NEWSPAPER PUBLICATION AFFIDAVITS |
| 01/15/10 | 20101-46008-01 | DOC OES | OTHER--OES ATF MEMORANDUM |
| 01/15/10 | 20101-46019-01 | GREAT RIVER ENERGY & NORTHERN STATES POWER COMPANY | OTHER--AFFIDAVIT OF SERVICE - TRANSCRIPTS FROM PUBLIC & EVIDENTIARY HEARINGS MAILED TO LIBRARIES IN PROJECT CORRIDOR |
| 01/14/10 | 20101-45968-07 | OAH | EXHIBITS - HEARING--EXHIBIT 115 |
| 01/14/10 | 20101-45968-02 | OAH | EXHIBITS - HEARING--EXHIBIT 120 |
| 01/14/10 | 20101-45968-06 | OAH | EXHIBITS - HEARING--EXHIBIT 116 |
| 01/14/10 | 20101-45968-01 | OAH | EXHIBITS - HEARING--EXHIBIT 304 |
| 01/14/10 | 20101-45968-03 | OAH | EXHIBITS - HEARING--EXHIBIT 119 |
| 01/14/10 | 20101-45968-04 | OAH | EXHIBITS - HEARING--EXHIBIT 118 |
| 01/14/10 | 20101-45968-05 | OAH | EXHIBITS - HEARING--EXHIBIT 117 |
| 01/13/10 | 20101-45926-01 | OAH | EXHIBITS - HEARING--EXHIBIT 110 |
| 01/13/10 | 20101-45926-05 | OAH | EXHIBITS - HEARING--EXHIBIT 111 |
| 01/13/10 | 20101-45926-04 | OAH | EXHIBITS - HEARING--EXHIBIT 112 |
| 01/13/10 | 20101-45926-03 | OAH | EXHIBITS - HEARING--EXHIBIT 340 |
| 01/13/10 | 20101-45927-01 | OAH | COMMENTS--VARIOUS COMMENTS |
| 01/13/10 | 20101-45926-02 | OAH | EXHIBITS - HEARING--EXHIBIT 341 |
| 01/12/10 | 20101-45900-05 | OAH | EXHIBITS - HEARING--EXHIBIT 382A-D |
| 01/12/10 | 20101-45900-04 | OAH | EXHIBITS - HEARING--EXHIBIT 306 |
| 01/12/10 | 20101-45902-05 | OAH | EXHIBITS - HEARING--EXHIBIT 401 |
| 01/12/10 | 20101-45900-03 | OAH | EXHIBITS - HEARING--EXHIBIT 318 |
| 01/12/10 | 20101-45900-10 | OAH | EXHIBITS - HEARING--EXHIBIT 389A |
| 01/12/10 | 20101-45901-06 | OAH | EXHIBITS - HEARING--EXHIBIT 395A |
| 01/12/10 | 20101-45901-05 | OAH | EXHIBITS - HEARING--EXHIBIT 395B |
| 01/12/10 | 20101-45900-01 | OAH | EXHIBITS - HEARING--EXHIBIT 385 |
| 01/12/10 | 20101-45900-08 | OAH | EXHIBITS - HEARING--EXHIBIT 373A-N |
| 01/12/10 | 20101-45901-02 | OAH | EXHIBITS - HEARING--EXHIBIT 391 |
| 01/12/10 | 20101-45901-04 | OAH | EXHIBITS - HEARING--EXHIBIT 395C |
| 01/12/10 | 20101-45902-04 | OAH | EXHIBITS - HEARING--EXHIBIT 402 |
| 01/12/10 | 20101-45902-06 | OAH | EXHIBITS - HEARING--EXHIBIT 400 |
| 01/12/10 | 20101-45900-07 | OAH | EXHIBITS - HEARING--EXHIBIT 305 |
| 01/12/10 | 20101-45900-09 | OAH | EXHIBITS - HEARING--EXHIBIT 372 |
| 01/12/10 | 20101-45901-03 | OAH | EXHIBITS - HEARING--EXHIBIT 395D |
| 01/12/10 | 20101-45902-02 | OAH | EXHIBITS - HEARING--EXHIBIT 399 - PART 1 OF 3 |
| 01/12/10 | 20101-45902-03 | OAH | EXHIBITS - HEARING--EXHIBIT 399 - PART 2 OF 3 |
| 01/12/10 | 20101-45901-07 | OAH | EXHIBITS - HEARING--EXHIBIT 390 |
| 01/12/10 | 20101-45900-06 | OAH | EXHIBITS - HEARING--EXHIBIT 303 |
| 01/12/10 | 20101-45913-01 | OAH | EXHIBITS - HEARING--EXHIBIT 378 |
| 01/12/10 | 20101-45900-02 | OAH | EXHIBITS - HEARING--EXHIBIT 371A |
| 01/12/10 | 20101-45902-01 | OAH | EXHIBITS - HEARING--EXHIBIT 399 - PART 3 OF 3 |
| 01/12/10 | 20101-45901-01 | OAH | EXHIBITS - HEARING--EXHIBIT 398 |
| 01/11/10 | 20101-45860-05 | OAH | EXHIBITS - HEARING--EXHIBIT 307F |
| 01/11/10 | 20101-45863-09 | OAH | EXHIBITS - HEARING--EXHIBIT 325 |
| 01/11/10 | 20101-45827-01 | OAH | EXHIBITS - HEARING--EXHIBIT 201C |
| 01/11/10 | 20101-45827-04 | OAH | EXHIBITS - HEARING--EXHIBIT 201B |
| 01/11/10 | 20101-45826-03 | OAH | EXHIBITS - HEARING--EXHIBIT 134 |
| 01/11/10 | 20101-45847-01 | PUC | PUBLIC COMMENT--08-1474 - E - 1-11-2010 |
| 01/11/10 | 20101-45862-04 | OAH | EXHIBITS - HEARING--EXHIBIT 322 |
| 01/11/10 | 20101-45826-05 | OAH | EXHIBITS - HEARING--EXHIBIT 135 |
| 01/11/10 | 20101-45863-01 | OAH | EXHIBITS - HEARING--EXHIBIT 339 |
| 01/11/10 | 20101-45825-08 | OAH | EXHIBITS - HEARING--EXHIBIT 113 |
| 01/11/10 | 20101-45863-08 | OAH | EXHIBITS - HEARING--EXHIBIT 326 |
| 01/11/10 | 20101-45830-03 | OAH | EXHIBITS - HEARING--EXHIBIT 202A - PART 1 |
| 01/11/10 | 20101-45862-10 | OAH | EXHIBITS - HEARING--EXHIBIT 309A |
| 01/11/10 | 20101-45863-03 | OAH | EXHIBITS - HEARING--EXHIBIT 336 |
| 01/11/10 | 20101-45828-01 | OAH | EXHIBITS - HEARING--EXHIBIT 389 |
| 01/11/10 | 20101-45830-02 | OAH | EXHIBITS - HEARING--EXHIBIT 202A - PART 2 |
| 01/11/10 | 20101-45863-04 | OAH | EXHIBITS - HEARING--EXHIBIT 335 |
| 01/11/10 | 20101-45827-07 | OAH | EXHIBITS - HEARING--EXHIBIT 201A |
| 01/11/10 | 20101-45827-05 | OAH | EXHIBITS - HEARING--EXHIBIT 371B |
| 01/11/10 | 20101-45828-03 | OAH | EXHIBITS - HEARING--EXHIBIT 388B |
| 01/11/10 | 20101-45860-07 | OAH | EXHIBITS - HEARING--EXHIBIT 307D |
| 01/11/10 | 20101-45862-06 | OAH | EXHIBITS - HEARING--EXHIBIT 320 |
| 01/11/10 | 20101-45827-02 | OAH | EXHIBITS - HEARING--EXHIBIT 203A |
| 01/11/10 | 20101-45825-07 | OAH | EXHIBITS - HEARING--EXHIBIT 124 |
| 01/11/10 | 20101-45860-10 | OAH | EXHIBITS - HEARING--EXHIBIT 307A |
| 01/11/10 | 20101-45862-07 | OAH | EXHIBITS - HEARING--EXHIBIT 319 |
| 01/11/10 | 20101-45826-01 | OAH | EXHIBITS - HEARING--EXHIBIT 132 |
| 01/11/10 | 20101-45862-09 | OAH | EXHIBITS - HEARING--EXHIBIT 310 |
| 01/11/10 | 20101-45828-02 | OAH | EXHIBITS - HEARING--EXHIBIT 374 |
| 01/11/10 | 20101-45860-04 | OAH | EXHIBITS - HEARING--EXHIBIT 307G |
| 01/11/10 | 20101-45828-05 | OAH | EXHIBITS - HEARING--EXHIBIT 386 |
| 01/11/10 | 20101-45825-06 | OAH | EXHIBITS - HEARING--EXHIBIT 127 |
| 01/11/10 | 20101-45826-07 | OAH | EXHIBITS - HEARING--EXHIBIT 130 |
| 01/11/10 | 20101-45862-02 | OAH | EXHIBITS - HEARING--EXHIBIT 323 |
| 01/11/10 | 20101-45830-04 | OAH | EXHIBITS - HEARING--EXHIBIT 372A - PART 2 |
| 01/11/10 | 20101-45828-04 | OAH | EXHIBITS - HEARING--EXHIBIT 380 |
| 01/11/10 | 20101-45825-09 | OAH | EXHIBITS - HEARING--EXHIBIT 125 |
| 01/11/10 | 20101-45825-03 | OAH | EXHIBITS - HEARING--EXHIBIT 114 |
| 01/11/10 | 20101-45863-07 | OAH | EXHIBITS - HEARING--EXHIBIT 327 |
| 01/11/10 | 20101-45862-05 | OAH | EXHIBITS - HEARING--EXHIBIT 321 |
| 01/11/10 | 20101-45862-01 | OAH | EXHIBITS - HEARING--EXHIBIT 324 |
| 01/11/10 | 20101-45828-06 | OAH | EXHIBITS - HEARING--EXHIBIT 376 |
| 01/11/10 | 20101-45863-06 | OAH | EXHIBITS - HEARING--EXHIBIT 328 |
| 01/11/10 | 20101-45828-09 | OAH | EXHIBITS - HEARING--EXHIBIT 375 |
| 01/11/10 | 20101-45829-03 | OAH | EXHIBITS - HEARING--EXHIBIT 397 |
| 01/11/10 | 20101-45827-03 | OAH | EXHIBITS - HEARING--EXHIBIT 314 |
| 01/11/10 | 20101-45863-02 | OAH | EXHIBITS - HEARING--EXHIBIT 337 |
| 01/11/10 | 20101-45829-04 | OAH | EXHIBITS - HEARING--EXHIBIT 515 |
| 01/11/10 | 20101-45862-08 | OAH | EXHIBITS - HEARING--EXHIBIT 313 |
| 01/11/10 | 20101-45825-10 | OAH | EXHIBITS - HEARING--EXHIBIT 126 |
| 01/11/10 | 20101-45864-04 | OAH | EXHIBITS - HEARING--EXHIBIT 367 |
| 01/11/10 | 20101-45825-02 | OAH | EXHIBITS - HEARING--EXHIBIT 128 |
| 01/11/10 | 20101-45864-02 | OAH | EXHIBITS - HEARING--EXHIBIT 368 |
| 01/11/10 | 20101-45825-01 | OAH | EXHIBITS - HEARING--EXHIBIT 101 |
| 01/11/10 | 20101-45829-05 | OAH | EXHIBITS - HEARING--EXHIBIT 392 |
| 01/11/10 | 20101-45860-09 | OAH | EXHIBITS - HEARING--EXHIBIT 307B |
| 01/11/10 | 20101-45860-02 | OAH | EXHIBITS - HEARING--EXHIBIT 307H |
| 01/11/10 | 20101-45829-02 | OAH | EXHIBITS - HEARING--EXHIBIT 396 |
| 01/11/10 | 20101-45828-08 | OAH | EXHIBITS - HEARING--EXHIBIT 378A-C |
| 01/11/10 | 20101-45860-08 | OAH | EXHIBITS - HEARING--EXHIBIT 307C |
| 01/11/10 | 20101-45830-06 | OAH | EXHIBITS - HEARING--EXHIBIT 329 - PART 2 |
| 01/11/10 | 20101-45860-03 | OAH | EXHIBITS - HEARING--EXHIBIT 307 |
| 01/11/10 | 20101-45862-03 | OAH | EXHIBITS - HEARING--EXHIBIT 307J |
| 01/11/10 | 20101-45827-06 | OAH | EXHIBITS - HEARING--EXHIBIT 371C |
| 01/11/10 | 20101-45826-02 | OAH | EXHIBITS - HEARING--EXHIBIT 133 |
| 01/11/10 | 20101-45826-04 | OAH | EXHIBITS - HEARING--EXHIBIT 131 |
| 01/11/10 | 20101-45825-05 | OAH | EXHIBITS - HEARING--EXHIBIT 123 |
| 01/11/10 | 20101-45830-01 | OAH | EXHIBITS - HEARING--EXHIBIT 329 - PART 1 |
| 01/11/10 | 20101-45828-07 | OAH | EXHIBITS - HEARING--EXHIBIT 377 |
| 01/11/10 | 20101-45860-06 | OAH | EXHIBITS - HEARING--EXHIBIT 307E |
| 01/11/10 | 20101-45824-01 | OAH | PUBLIC COMMENT--VARIOUS PUBLIC COMMENTS |
| 01/11/10 | 20101-45829-01 | OAH | EXHIBITS - HEARING--EXHIBIT 393 |
| 01/11/10 | 20101-45830-05 | OAH | EXHIBITS - HEARING--EXHIBIT 372A - PART 1 |
| 01/11/10 | 20101-45864-01 | OAH | EXHIBITS - HEARING--EXHIBIT 369 |
| 01/11/10 | 20101-45863-05 | OAH | EXHIBITS - HEARING--EXHIBIT 334 |
| 01/11/10 | 20101-45826-06 | OAH | EXHIBITS - HEARING--EXHIBIT 136 |
| 01/11/10 | 20101-45825-04 | OAH | EXHIBITS - HEARING--EXHIBIT 129 |
| 01/11/10 | 20101-45860-01 | OAH | EXHIBITS - HEARING--EXHIBIT 307I |
| 01/11/10 | 20101-45864-03 | OAH | EXHIBITS - HEARING--EXHIBIT 370 |
| 01/07/10 | 20101-45767-05 | OAH | EXHIBITS - HEARING--EXHIBIT 224 |
| 01/07/10 | 20101-45768-02 | OAH | EXHIBITS - HEARING--EXHIBIT 230 |
| 01/07/10 | 20101-45768-04 | OAH | EXHIBITS - HEARING--EXHIBIT 232 |
| 01/07/10 | 20101-45768-05 | OAH | EXHIBITS - HEARING--EXHIBIT 234 |
| 01/07/10 | 20101-45767-07 | OAH | EXHIBITS - HEARING--EXHIBIT 225 |
| 01/07/10 | 20101-45767-03 | OAH | EXHIBITS - HEARING--EXHIBIT 221 |
| 01/07/10 | 20101-45768-03 | OAH | EXHIBITS - HEARING--EXHIBIT 233 |
| 01/07/10 | 20101-45768-01 | OAH | EXHIBITS - HEARING--EXHIBIT 231 |
| 01/07/10 | 20101-45767-08 | OAH | EXHIBITS - HEARING--EXHIBIT 220 |
| 01/07/10 | 20101-45767-01 | OAH | EXHIBITS - HEARING--EXHIBIT 219 |
| 01/07/10 | 20101-45767-02 | OAH | EXHIBITS - HEARING--EXHIBIT 229 |
| 01/07/10 | 20101-45767-06 | OAH | EXHIBITS - HEARING--EXHIBIT 228 |
| 01/07/10 | 20101-45763-01 | APPLICANT GREAT RIVER ENERGY | LETTER--REGARDING UNDERGOUND CABLE AND EXHIBITS 159A-159G |
| 01/07/10 | 20101-45767-09 | OAH | EXHIBITS - HEARING--EXHIBIT 226 |
| 01/07/10 | 20101-45767-04 | OAH | EXHIBITS - HEARING--EXHIBIT 229A |
| 01/07/10 | 20101-45767-10 | OAH | EXHIBITS - HEARING--EXHIBIT 227 |
| 01/06/10 | 20101-45732-10 | OAH | EXHIBITS - HEARING--EXHIBIT 508 |
| 01/06/10 | 20101-45733-03 | OAH | EXHIBITS - HEARING--EXHIBIT 332 |
| 01/06/10 | 20101-45731-06 | OAH | EXHIBITS - HEARING--EXHIBIT 150 |
| 01/06/10 | 20101-45731-09 | OAH | EXHIBITS - HEARING--EXHIBIT 152 |
| 01/06/10 | 20101-45733-07 | OAH | EXHIBITS - HEARING--EXHIBIT 222 |
| 01/06/10 | 20101-45731-04 | OAH | EXHIBITS - HEARING--EXHIBIT 149 |
| 01/06/10 | 20101-45733-01 | OAH | EXHIBITS - HEARING--EXHIBIT 331 |
| 01/06/10 | 20101-45734-01 | OAH | EXHIBITS - HEARING--EXHIBIT 513 |
| 01/06/10 | 20101-45734-04 | OAH | EXHIBITS - HEARING--EXHIBIT 333 |
| 01/06/10 | 20101-45732-08 | OAH | EXHIBITS - HEARING--EXHIBIT 505 |
| 01/06/10 | 20101-45732-03 | OAH | EXHIBITS - HEARING--EXHIBIT 514 |
| 01/06/10 | 20101-45730-01 | OAH | EXHIBITS - HEARING--EXHIBIT 144 |
| 01/06/10 | 20101-45731-03 | OAH | EXHIBITS - HEARING--EXHIBIT 155 |
| 01/06/10 | 20101-45734-03 | OAH | EXHIBITS - HEARING--EXHIBIT 338 |
| 01/06/10 | 20101-45731-02 | OAH | EXHIBITS - HEARING--EXHIBIT 148 |
| 01/06/10 | 20101-45733-05 | OAH | EXHIBITS - HEARING--EXHIBIT 330 |
| 01/06/10 | 20101-45733-08 | OAH | EXHIBITS - HEARING--EXHIBIT 316 |
| 01/06/10 | 20101-45730-02 | OAH | EXHIBITS - HEARING--EXHIBIT 145 |
| 01/06/10 | 20101-45734-05 | OAH | EXHIBITS - HEARING--EXHIBIT 512 |
| 01/06/10 | 20101-45730-08 | OAH | EXHIBITS - HEARING--EXHIBIT 142 |
| 01/06/10 | 20101-45730-05 | OAH | EXHIBITS - HEARING--EXHIBIT 42 |
| 01/06/10 | 20101-45730-06 | OAH | EXHIBITS - HEARING--EXHIBIT 41 |
| 01/06/10 | 20101-45732-02 | OAH | EXHIBITS - HEARING--EXHIBIT 506 |
| 01/06/10 | 20101-45731-08 | OAH | EXHIBITS - HEARING--EXHIBIT 151 |
| 01/06/10 | 20101-45732-09 | OAH | EXHIBITS - HEARING--EXHIBIT 511 |
| 01/06/10 | 20101-45734-02 | OAH | EXHIBITS - HEARING--EXHIBIT 515 |
| 01/06/10 | 20101-45735-01 | OAH | COMMENTS--PUBLIC COMMENTS |
| 01/06/10 | 20101-45732-05 | OAH | EXHIBITS - HEARING--EXHIBIT 510 |
| 01/06/10 | 20101-45730-10 | OAH | EXHIBITS - HEARING--EXHIBIT 40 |
| 01/06/10 | 20101-45731-01 | OAH | EXHIBITS - HEARING--EXHIBIT 154 |
| 01/06/10 | 20101-45731-05 | OAH | EXHIBITS - HEARING--EXHIBIT 153 |
| 01/06/10 | 20101-45732-01 | OAH | EXHIBITS - HEARING--EXHIBIT 507 |
| 01/06/10 | 20101-45730-03 | OAH | EXHIBITS - HEARING--EXHIBIT 143 |
| 01/06/10 | 20101-45731-07 | OAH | EXHIBITS - HEARING--EXHIBIT 147 |
| 01/06/10 | 20101-45732-04 | OAH | EXHIBITS - HEARING--EXHIBIT 157 |
| 01/06/10 | 20101-45730-04 | OAH | EXHIBITS - HEARING--EXHIBIT 138 |
| 01/06/10 | 20101-45731-10 | OAH | EXHIBITS - HEARING--EXHIBIT 146 |
| 01/06/10 | 20101-45733-02 | OAH | EXHIBITS - HEARING--EXHIBIT 223 |
| 01/06/10 | 20101-45732-07 | OAH | EXHIBITS - HEARING--EXHIBIT 156 |
| 01/06/10 | 20101-45733-09 | OAH | EXHIBITS - HEARING--EXHIBIT 317 |
| 01/06/10 | 20101-45730-07 | OAH | EXHIBITS - HEARING--EXHIBIT 139 |
| 01/06/10 | 20101-45730-09 | OAH | EXHIBITS - HEARING--EXHIBIT 21A |
| 01/06/10 | 20101-45732-06 | OAH | EXHIBITS - HEARING--EXHIBIT 509 |
| 01/06/10 | 20101-45733-10 | OAH | EXHIBITS - HEARING--EXHIBIT 158 |
| 01/06/10 | 20101-45733-06 | OAH | EXHIBITS - HEARING--EXHIBIT 315 |
| 01/06/10 | 20101-45733-04 | OAH | EXHIBITS - HEARING--EXHIBIT 312 |
| 12/31/09 | 200912-45546-01 | OAH | COMMENTS--STRAUB COMMENT |
| 12/31/09 | 200912-45546-02 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS A |
| 12/31/09 | 200912-45546-03 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS B |
| 12/30/09 | 200912-45505-01 | GREAT RIVER ENERGY & NORTHERN STATES POWER COMPANY | OTHER--AFFIDAVIT OF NOTICE-ALTERNATIVE ALIGNMENT NEAR LE SUEUR, MN |
| 12/29/09 | 200912-45443-06 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS - BRAUCHER AND HENNEN |
| 12/29/09 | 200912-45443-01 | OAH | COMMENTS--PUBLIC COMMENT - CITY OF HAMPTON |
| 12/29/09 | 200912-45443-04 | OAH | COMMENTS--VARIOUS PUBLIC COMMENT - P-Z |
| 12/29/09 | 200912-45443-03 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS - A-D |
| 12/29/09 | 200912-45476-01 | APPLICANTS GREAT RIVER ENERGY AND XCEL ENERGY | LETTER--PROPOSED SCHEDULE FOR CONSIDERATION |
| 12/29/09 | 200912-45443-07 | OAH | COMMENTS--MCKINNON COMMENT |
| 12/29/09 | 200912-45443-02 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS - MAILED-FAXED |
| 12/29/09 | 200912-45478-01 | GREAT RIVER ENERGY & NORTHERN STATES POWER COMPANY | OTHER--REVISED CONFIRMATION OF NOTICE-AFFIDAVIT OF MAILING-NEW PRAGUE PUBLIC MEETING |
| 12/29/09 | 200912-45443-05 | OAH | COMMENTS--VARIOUS PUBLIC COMMENTS - H-O |
| 12/28/09 | 200912-45411-01 | OAH | LETTER--RES SPECIALTY PYROTECHNICS LETTER TO JUDGE LUIS WITH EXPERT COMMENT |
| 12/28/09 | 200912-45439-01 | APPLICANT GREAT RIVER ENERGY | LETTER--REG |
| 12/23/09 | 200912-45356-01 | GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | OTHER--CONFIRMATION OF NOTICE - AFFIDAVIT OF MAILING - NEW PRAGUE PUBLIC MTG |
| 12/22/09 | 200912-45333-01 | COURT REPORTER | EXHIBITS - HEARING--EVIDENTIARY HEARING - OES EX 43, PART II OF III |
| 12/22/09 | 200912-45333-03 | COURT REPORTER | EXHIBITS - HEARING--EVIDENTIARY HEARING - OES EX 43, PART III OF III |
| 12/22/09 | 200912-45333-02 | COURT REPORTER | EXHIBITS - HEARING--EVIDENTIARY HEARING - OES EX 43, PART I OF III |
| 12/22/09 | 200912-45330-01 | OAH | LETTER--ALJ DENIAL OF SUBPOENA REQUEST |
| 12/21/09 | 200912-45270-07 | OAH | EXHIBITS - HEARING--EXHIBIT 344 |
| 12/21/09 | 200912-45270-03 | OAH | EXHIBITS - HEARING--EXHIBIT 309 |
| 12/21/09 | 200912-45275-05 | OAH | EXHIBITS - HEARING--EXHIBIT 357 |
| 12/21/09 | 200912-45266-04 | OAH | EXHIBITS - HEARING--EXHIBIT 211 |
| 12/21/09 | 200912-45268-09 | OAH | EXHIBITS - HEARING--EXHIBIT 213 |
| 12/21/09 | 200912-45268-07 | OAH | EXHIBITS - HEARING--EXHIBIT 215 |
| 12/21/09 | 200912-45270-08 | OAH | EXHIBITS - HEARING--EXHIBIT 343 |
| 12/21/09 | 200912-45298-02 | OAH | EXHIBITS - HEARING--EXHIBIT 363 - PART 1 |
| 12/21/09 | 200912-45270-02 | OAH | EXHIBITS - HEARING--EXHIBIT 348 |
| 12/21/09 | 200912-45252-01 | DOC OES | NOTICE--NOTICE PUBLIC HEARING NEWSPAPER PUBLICATION AFFIDAVITS |
| 12/21/09 | 200912-45292-02 | OAH | EXHIBITS - HEARING--EXHIBIT 366 - PART 2 OF 2 |
| 12/21/09 | 200912-45275-10 | OAH | EXHIBITS - HEARING--EXHIBIT 352 |
| 12/21/09 | 200912-45266-07 | OAH | EXHIBITS - HEARING--EXHIBIT 209 |
| 12/21/09 | 200912-45283-04 | OAH | EXHIBITS - HEARING--EXHIBIT 360 |
| 12/21/09 | 200912-45275-03 | OAH | EXHIBITS - HEARING--EXHIBIT 358 |
| 12/21/09 | 200912-45266-08 | OAH | EXHIBITS - HEARING--EXHIBIT 210 |
| 12/21/09 | 200912-45283-03 | OAH | EXHIBITS - HEARING--EXHIBIT 361 |
| 12/21/09 | 200912-45270-04 | OAH | EXHIBITS - HEARING--EXHIBIT 347 |
| 12/21/09 | 200912-45283-01 | OAH | EXHIBITS - HEARING--EXHIBIT 364 A THROUGH E |
| 12/21/09 | 200912-45268-04 | OAH | EXHIBITS - HEARING--EXHIBIT 218 |
| 12/21/09 | 200912-45266-06 | OAH | EXHIBITS - HEARING--EXHIBIT 202 |
| 12/21/09 | 200912-45266-03 | OAH | EXHIBITS - HEARING--EXHIBIT 206 |
| 12/21/09 | 200912-45270-10 | OAH | EXHIBITS - HEARING--EXHIBIT 311 |
| 12/21/09 | 200912-45270-09 | OAH | EXHIBITS - HEARING--EXHIBIT 342 |
| 12/21/09 | 200912-45268-08 | OAH | EXHIBITS - HEARING--EXHIBIT 214 |
| 12/21/09 | 200912-45298-01 | OAH | EXHIBITS - HEARING--EXHIBIT 363 - PART 2 OF 2 |
| 12/21/09 | 200912-45268-03 | OAH | EXHIBITS - HEARING--EXHIBIT 301 |
| 12/21/09 | 200912-45275-02 | OAH | EXHIBITS - HEARING--EXHIBIT 359 |
| 12/21/09 | 200912-45270-01 | OAH | EXHIBITS - HEARING--EXHIBIT 349 |
| 12/21/09 | 200912-45268-10 | OAH | EXHIBITS - HEARING--EXHIBIT 212 |
| 12/21/09 | 200912-45268-06 | OAH | EXHIBITS - HEARING--EXHIBIT 216 |
| 12/21/09 | 200912-45266-09 | OAH | EXHIBITS - HEARING--EXHIBIT 203 |
| 12/21/09 | 200912-45268-05 | OAH | EXHIBITS - HEARING--EXHIBIT 217 |
| 12/21/09 | 200912-45275-07 | OAH | EXHIBITS - HEARING--EXHIBIT 355 |
| 12/21/09 | 200912-45266-01 | OAH | EXHIBITS - HEARING--EXHIBIT 204 |
| 12/21/09 | 200912-45275-06 | OAH | EXHIBITS - HEARING--EXHIBIT 356 |
| 12/21/09 | 200912-45266-10 | OAH | EXHIBITS - HEARING--EXHIBIT 205 |
| 12/21/09 | 200912-45266-05 | OAH | EXHIBITS - HEARING--EXHIBIT 207 |
| 12/21/09 | 200912-45270-05 | OAH | EXHIBITS - HEARING--EXHIBIT 346 |
| 12/21/09 | 200912-45270-06 | OAH | EXHIBITS - HEARING--EXHIBIT 345 |
| 12/21/09 | 200912-45275-09 | OAH | EXHIBITS - HEARING--EXHIBIT 353 |
| 12/21/09 | 200912-45275-04 | OAH | EXHIBITS - HEARING--EXHIBIT 350 |
| 12/21/09 | 200912-45283-05 | OAH | EXHIBITS - HEARING--EXHIBIT 366 A |
| 12/21/09 | 200912-45268-01 | OAH | EXHIBITS - HEARING--EXHIBIT 308 |
| 12/21/09 | 200912-45275-08 | OAH | EXHIBITS - HEARING--EXHIBIT 354 |
| 12/21/09 | 200912-45275-01 | OAH | EXHIBITS - HEARING--EXHIBIT 351 |
| 12/21/09 | 200912-45292-01 | OAH | EXHIBITS - HEARING--EXHIBIT 366 - PART 1 OF 2 |
| 12/21/09 | 200912-45283-06 | OAH | EXHIBITS - HEARING--EXHIBIT 365 |
| 12/21/09 | 200912-45268-02 | OAH | EXHIBITS - HEARING--EXHIBIT 302 |
| 12/21/09 | 200912-45283-02 | OAH | EXHIBITS - HEARING--EXHIBIT 362 |
| 12/21/09 | 200912-45266-02 | OAH | EXHIBITS - HEARING--EXHIBIT 208 |
| 12/16/09 | 200912-45089-01 | APPLICANTS GREAT RIVER ENERGY AND XCEL ENERGY | TESTIMONY--POORKER SUPPLEMENTAL TESTIMONY, SCHEDULE 50 |
| 12/15/09 | 200912-45040-02 | APPLICANTS GREAT RIVER ENERGY AND XCEL ENERGY | TESTIMONY--POORKER SUPPLEMENTAL TESTIMONY PART 1 OF 2 |
| 12/15/09 | 200912-45040-03 | APPLICANTS GREAT RIVER ENERGY AND XCEL ENERGY | TESTIMONY--POORKER SUPPLEMENTAL TESTIMONY PART 2 OF 2 |
| 12/15/09 | 200912-45040-04 | APPLICANTS GREAT RIVER ENERGY AND XCEL ENERGY | TESTIMONY--SUPPLEMENTAL TESTIMONY FILING LETTER, CERTIFICATE OF SERVICE AND OFFICIAL SERVICE LIST |
| 12/15/09 | 200912-45040-01 | APPLICANTS GREAT RIVER ENERGY AND XCEL ENERGY | TESTIMONY--LENNON SUPPLEMENTAL TESTIMONY |
| 12/11/09 | 8913 | OAH | EXHIBITS - HEARING--EXHIBIT 366A |
| 12/10/09 | 200912-44891-01 | COURT REPORTER | TRANSCRIPTS--PUC PROCEEDINGS ON 1/27/2009 STAFF BRIEFING ST PAUL |
| 12/03/09 | 200912-44674-01 | GREAT RIVER ENERGY AND NORTHERN STATES POWER COMPANY | OTHER--CONFIRMATION OF NOTICE - AFFIDAVIT OF MAILING |
| 12/03/09 | 200912-44682-01 | GREAT RIVER ENERGY AND NORTHERN STATES POWER | OTHER--SUPPLEMENT TO 200912-44674 - AFFIDAVIT OF SERVICE |
| 11/25/09 | 200911-44467-01 | DOC OES | NOTICE--DRAFT EIS MEETING NEWSPAPER PUBLICATION AFFIDAVITS |
| 11/25/09 | 200911-44444-01 | DOC OES | NOTICE--EQB MONITOR NOTICE OF DEIS AVAILABILITY AND MEETINGS |
| 11/25/09 | 200911-44433-01 | DOC OES | NOTICE--NOTICE IN EQB MONITOR |
| 11/25/09 | 200911-44462-01 | OAH | LETTER--ALJ SUMMARY OF PREHEARING CONFERENCE |
| 11/25/09 | 200911-44460-01 | DOC OES | NOTICE--NEWSPAPER NOTICE OF SCOPING MEETINGS |
| 11/20/09 | 200911-44291-08 | GREAT RIVER ENERGY | REBUTTAL--TESTIMONY, WITNESS AND EXHIBIT LISTS SERVICE LETTER |
| 11/20/09 | 200911-44291-03 | GREAT RIVER ENERGY | REBUTTAL--RASMUSSEN |
| 11/20/09 | 200911-44291-06 | GREAT RIVER ENERGY | REBUTTAL--POORKER REBUTTAL & SCHEDULES 33-37, 1 OF 2 |
| 11/20/09 | 200911-44291-04 | GREAT RIVER ENERGY | REBUTTAL--APPLICANT WITNESS LIST |
| 11/20/09 | 200911-44291-02 | GREAT RIVER ENERGY | REBUTTAL--APPLICANT EXHIBIT LIST |
| 11/20/09 | 200911-44291-05 | GREAT RIVER ENERGY | REBUTTAL--POORKER REBUTTAL SCHEDULES 38-41, 2 OF 2 |
| 11/20/09 | 200911-44291-07 | GREAT RIVER ENERGY | REBUTTAL--LENNON REBUTTAL TESTIMONY |
| 11/20/09 | 200911-44291-01 | GREAT RIVER ENERGY | REBUTTAL--VALBERG REBUTTAL & SCHEDULES |
| 11/17/09 | 200911-44119-01 | NORTHERN STATES POWER COMPANY AND GREAT RIVER ENERGY | LETTER |
| 11/17/09 | 200911-44135-01 | DOC OES EFP | LETTER |
| 11/16/09 | 200911-44105-01 | R. & P. JOHNSON | LETTER |
| 11/16/09 | 200911-44063-01 | NORTHERN STATES POWER COMPANY AND GREAT RIVER ENERGY | LETTER |
| 11/10/09 | 200911-43853-01 | NORTHERN STATES POWER COMPANY AND GREAT RIVER ENERGY | LETTER--EXEMPTION FROM MINNESOTA RULE 1405.2000 AND ORDER POINT 4 OF THE SECOND PREHEARING ORDER |
| 11/09/09 | 200911-43764-01 | DOC OES | NOTICE--NOTICE OF PUBLIC HEARING - ADDITIONAL |
| 11/09/09 | 200911-43801-03 | R. & P. JOHNSON | TESTIMONY--MACDONAGH DIRECT |
| 11/09/09 | 200911-43801-01 | R. & P. JOHNSON | TESTIMONY--CARPENTER DIRECT |
| 11/09/09 | 200911-43801-02 | R. & P. JOHNSON | TESTIMONY--COVER |
| 11/06/09 | 200911-43696-01 | DOC OES | NOTICE--OF PUBLIC HEARING - REVISED |
| 11/06/09 | 200911-43707-01 | DOC OES | NOTICE--OF NORTH-SOUTH ROUTE SEGMENTS |
| 11/06/09 | 200911-43697-01 | DOC OES | NOTICE--OF PUBLIC HEARING - REVISED - ADDITIONAL SERVICE LIST |
| 11/06/09 | 200911-43699-01 | DOC OES | NOTICE--EMAILED NOTICE OF PUBLIC HEARING |
| 10/28/09 | 200910-43305-01 | DOC OES | OTHER--NOTICE OF SERVICE OF DRAFT EIS TO PUBLIC LIBRARIES |
| 10/28/09 | 200910-43306-01 | DOC OES | OTHER--CERTIFICATE OF SERVICE OF DRAFT EIS TO AGENCIES AND OTHERS |
| 10/28/09 | 200910-43307-01 | XCEL ENERGY AND GREAT RIVER ENERGY | OTHER--MAILING OF APPLICANTS |
| 10/22/09 | 200910-43149-01 | DOC OES | NOTICE--OF DRAFT EIS AND PUBLIC INFO MTGS - EMAIL RESENDS |
| 10/21/09 | 200910-43111-06 | DOC OES | REPORT--DRAFT EIS PART 2 - 8 OF 10 |
| 10/21/09 | 200910-43112-04 | DOC OES | REPORT--DRAFT EIS PART 3 - 2 OF 9 |
| 10/21/09 | 200910-43110-09 | DOC OES | REPORT--DRAFT EIS PART 1 - 2 OF 10 |
| 10/21/09 | 200910-43110-05 | DOC OES | REPORT--DRAFT EIS PART 1 - 7 OF 10 |
| 10/21/09 | 200910-43110-08 | DOC OES | REPORT--DRAFT EIS PART 1 - 1 OF 10 |
| 10/21/09 | 200910-43112-02 | DOC OES | REPORT--DRAFT EIS PART 3 - 8 OF 9 |
| 10/21/09 | 200910-43110-07 | DOC OES | REPORT--DRAFT EIS PART 1 - 10 OF 10 |
| 10/21/09 | 200910-43110-02 | DOC OES | REPORT--DRAFT EIS PART 1 - 8 OF 10 |
| 10/21/09 | 200910-43133-01 | DOC OES | NOTICE--OF PUBLIC INFORMATION MEETINGS - EMAIL LIST |
| 10/21/09 | 200910-43111-05 | DOC OES | REPORT--DRAFT EIS PART 2 - 4 OF 10 |
| 10/21/09 | 200910-43110-03 | DOC OES | REPORT--DRAFT EIS PART 1 - 4 OF 10 |
| 10/21/09 | 200910-43111-10 | DOC OES | REPORT--DRAFT EIS PART 2 - 9 OF 10 |
| 10/21/09 | 200910-43110-06 | DOC OES | REPORT--DRAFT EIS PART 1 - 3 OF 10 |
| 10/21/09 | 200910-43112-07 | DOC OES | REPORT--DRAFT EIS PART 3 - 3 OF 9 |
| 10/21/09 | 200910-43110-10 | DOC OES | REPORT--DRAFT EIS PART 1 - 9 OF 10 |
| 10/21/09 | 200910-43111-07 | DOC OES | REPORT--DRAFT EIS PART 2 - 2 OF 10 |
| 10/21/09 | 200910-43112-09 | DOC OES | REPORT--DRAFT EIS PART 3 - 9 OF 9 |
| 10/21/09 | 200910-43111-03 | DOC OES | REPORT--DRAFT EIS PART 2 - 6 OF 10 |
| 10/21/09 | 200910-43111-02 | DOC OES | REPORT--DRAFT EIS PART 2 - 10 OF 10 |
| 10/21/09 | 200910-43110-04 | DOC OES | REPORT--DRAFT EIS PART 1 - 5 OF 10 |
| 10/21/09 | 200910-43111-08 | DOC OES | REPORT--DRAFT EIS PART 2 - 5 OF 10 |
| 10/21/09 | 200910-43110-01 | DOC OES | REPORT--DRAFT EIS PART 1 - 6 OF 10 |
| 10/21/09 | 200910-43112-05 | DOC OES | REPORT--DRAFT EIS PART 3 - 1 OF 9 |
| 10/21/09 | 200910-43112-01 | DOC OES | REPORT--DRAFT EIS PART 3 - 4 OF 9 |
| 10/21/09 | 200910-43111-01 | DOC OES | REPORT--DRAFT EIS PART 2 - 3 OF 10 |
| 10/21/09 | 200910-43112-03 | DOC OES | REPORT--DRAFT EIS PART 3 - 5 OF 9 |
| 10/21/09 | 200910-43111-04 | DOC OES | REPORT--DRAFT EIS PART 2 - 7 OF 10 |
| 10/21/09 | 200910-43112-06 | DOC OES | REPORT--DRAFT EIS PART 3 - 6 OF 9 |
| 10/21/09 | 200910-43111-09 | DOC OES | REPORT--DRAFT EIS PART 2 - 2 OF 10 |
| 10/21/09 | 200910-43112-08 | DOC OES | REPORT--DRAFT EIS PART 3 - 7 OF 9 |
| 10/20/09 | 200910-43042-01 | DOC OES | NOTICE--OF PUBLIC INFORMATION MEETINGS |
| 10/15/09 | 200910-42905-01 | DOC OES | NOTICE--NOTICE TO LEGISLATORS |
| 10/13/09 | 200910-42792-09 | APPLICANTS GREAT RIVER ENERGY AND XCEL ENERGY | TESTIMONY--POORKER DIRECT TESTIMONY PART 2 OF 6 |
| 10/13/09 | 200910-42792-04 | APPLICANTS GREAT RIVER ENERGY AND XCEL ENERGY | TESTIMONY--RASMUSSEN DIRECT TESTIMONY AND SCHEDULE |
| 10/13/09 | 200910-42792-06 | APPLICANTS GREAT RIVER ENERGY AND XCEL ENERGY | TESTIMONY--LENNON DIRECT TESTIMONY AND SCHEDULES |
| 10/13/09 | 200910-42792-08 | APPLICANTS GREAT RIVER ENERGY AND XCEL ENERGY | TESTIMONY--POORKER DIRECT TESTIMONY PART 5 OF 6 |
| 10/13/09 | 200910-42792-02 | APPLICANTS GREAT RIVER ENERGY AND XCEL ENERGY | TESTIMONY--DR. VALBERG DIRECT TESTIMONY AND SCHEDULES |
| 10/13/09 | 200910-42792-01 | APPLICANTS GREAT RIVER ENERGY AND XCEL ENERGY | TESTIMONY--POORKER DIRECT TESTIMONY PART 6 OF 6 |
| 10/13/09 | 200910-42792-07 | APPLICANTS GREAT RIVER ENERGY AND XCEL ENERGY | TESTIMONY--POORKER DIRECT TESTIMONY PART 1 OF 6 |
| 10/13/09 | 200910-42792-10 | APPLICANTS GREAT RIVER ENERGY AND XCEL ENERGY | TESTIMONY--POORKER DIRECT TESTIMONY PART 3 OF 6 |
| 10/13/09 | 200910-42792-05 | APPLICANTS GREAT RIVER ENERGY AND XCEL ENERGY | TESTIMONY--DIRECT TESTIMONY FILING LETTER, CERTIFICATE OF SERVICE AND OFFICIAL SERVICE LIST |
| 10/13/09 | 200910-42792-03 | APPLICANTS GREAT RIVER ENERGY AND XCEL ENERGY | TESTIMONY--POORKER DIRECT TESTIMONY PART 4 OF 6 |
| 10/11/09 | 200910-42692-01 | COURT REPORTER | TRANSCRIPTS--PREHEARING - 9/1/09 ADMIN HEARINGS - 3:00 PM |
| 09/29/09 | 20099-42281-01 | DOC OES | NOTICE--LANDOWNER NOTIFICATION LETTER |
| 09/21/09 | 20099-42038-01 | PUC | PUBLIC COMMENT--OUT OF COMMENT PERIOD |
| 09/11/09 | 20099-41712-01 | OAH | ORDER--SECOND PREHEARING ORDER |
| 08/03/09 | 20098-40378-01 | BRIGGS AND MORGAN, P.A. | REQUEST TO UPDATE SERVICE LIST--ADD HERRING, REMOVE BIESTEK |
| 07/30/09 | 20097-39312-01 | DOC OES | NOTICE--OF SCOPING DECISION |
| 07/07/09 | 20097-39384-01 | DOC OES | NOTICE--OF SCOPING DECISION |
| 06/30/09 | 20096-39096-01 | DOC OES | NOTICE--NOTICE OF SCOPING DECISION |
| 06/30/09 | 20096-39100-01 | DOC OES | OTHER--EIS SCOPING DECISION |