This webpage contains information and documents related to the permitting of this project by the Minnesota Public Utilities Commission. Every project before the Commission has an electronic docket - an eDocket, a file folder for all of the project.s documents.
Documents for this project are listed below in the File Register, most recent documents first. To view the eDockets record for this project, click on the eDockets link below, or click on the eDockets tab in the File Register. A subset of the record, including key documents with descriptions, is available by clicking on the Energy Facilities tab in the File Register.
For more information about participating in the permitting of this project, click on the How to Participate tab, or contact the state permit manager or public advisor listed below.
Application accepted |
Public meeting |
Scoping decision |
Environmental document available |
Public hearing |
Permit issued |
Permit Amended |
Project built |
Docket closed |
On July 17, 2008, Great River Energy and Minnesota Power filed a route permit application with the Minnesota Public Utilities Commission (Commission) for the Southdale to Scearcyville 115 kV Transmission Line project under the alternative permitting process. The application was accepted as complete by the Commission on August 15, 2008.
Department of Commerce, Energy Facility Permitting (EFP) staff held a public information and environmental assessment scoping meeting on September 23, 2008, in Brainerd, Minnnesota. On October 7, 2008, EFP staff held a public focus group meeting in Baxter, Minnesota, to further solicit public input on the proposed route and route alternatives. The scoping decision for the environmental assessment was issued on October 22, 2008, and the environmental assessment was made available on January 6, 2009. A public hearing was conducted on January 22, 2009, with the hearing comment period ending February 6, 2009.
On April 9, 2009, the Commission issued a route permit to Great River Energy and Minnesota Power to construct approximately 9.3 miles of new 115 kV transmission line in Cass and Crow Wing counties, Minnesota. On Februray 2, 2012, the Commission issued a permit amendment for the project.
Construction was completed on July 2, 2012. The project was energized on July 12, 2012.
| Primary Documents | ||
| Date | Document | Description |
| Minor Alteration and Permit Amendment for the Southdale to Scearcyville 115 kV Transmission Line Project | document details | A permit amendment by the Commission for the Southdale to Scearcyville 115 kV transmission line project, including amended route permit maps |
|
| Route Permit for the Southdale to Scearcyville 115 kV Transmission Line Project | document details | The route permit issued by the Commission for the Southdale to Scearcyville 115 kV transmission line project, including route permit maps |
|
| Date | Document | Description |
| Minor Alteration and Permit Amendment for the Southdale to Scearcyville 115 kV Transmission Line Project | document details | A permit amendment by the Commission for the Southdale to Scearcyville 115 kV transmission line project, including amended route permit maps |
|
| EFP Comments and Recommendations on a Minor Alteration to the Southdale to Scearcyville 115 kV Transmission Line Project (1 MB) | document details | EFP staff has submitted comments and recommendations to the Commission concerning the requested route permit minor alterations. The minor alteration request will be considered by the Commission at the January 26, 2012, Agenda Meeting |
|
| Notice of Minor Alteration (1 MB) | document details | Great River Energy has applied to the Public Utilities Commission for two deviations from the permitted route of the Southdale to Scearcyville 115 kV transmission line project. Comments are being accepted through December 30, 2011 |
|
| Request for Minor Alteration (4.4 MB) | document details | Great River Energy has applied to the Public Utilities Commission for two deviations from the permitted route of the Southdale to Scearcyville 115 kV transmission line project |
|
| Route Permit for the Southdale to Scearcyville 115 kV Transmission Line Project | document details | The route permit issued by the Commission for the Southdale to Scearcyville 115 kV transmission line project, including route permit maps |
|
| Findings of Fact, Conclusions of Law, and Order issuing a transmission line route permit to Great River Energy and Minnesota Power (4.6 MB) | document details | Route permit to construct approximately nine and three-tenths miles of new 115 kV transmission line in Cass and Crow Wing counties, Minnesota |
|
| Staff Comments and Recommendations to the PUC for granting the route permit for the proposed Southdale to Scearcyville transmission line project (1.7 MB) | document details | OES Comments and Recommendations include proposed Findings of Fact and a proposed Route Permit for a Commission Order |
|
| Environmental Assessment | Southdale to Scearcyville Environmental Assessment |
|
| Southdale to Scearcyville Public Hearing Notice (890 KB) | document details | Notice detailing information on the public hearing to be held on January 22, 2009 on the Southdale to Scearcyville 115 kV transmission line route permit application |
|
| Public Comments on the Southdale to Scearcyville Scope (1 of 2) [5.2MB] | document details | Public comments submitted to the OES-EFP on the scope of the environmental assessment |
|
| Public Comments on the Scope (2 of 2) [6 MB] | document details | Public comments submitted to the OES-EFP on the scope of the environmental assessment |
|
| Scoping Decision Document (802 KB) | document details | Director of the OES Scoping Decision for the proposed Southdale to Scearcyville transmission line project environmental assessment |
|
| Notice of Southdate to Scearcyville Public Focus Group Meeting (37 KB) | document details | The notice of a public focus group meeting to discuss the state’s permitting process, proposed project specifics, public concerns, and suggested alternatives |
|
| Re-Notice of Application for a Route Permit and Public Information Meeting for the Southdale to Scearcyville 115 kV Transmission Line Project (299 KB) | document details | The Office of Energy Security has re-scheduled the Great River Energy and Minnesota Power Southdale to Scearcyville 115 kV Transmission Line Project public information and environmental assessment scoping meeting to September 23, 2008, at Cragun's Conference Center in Brainerd, Minnesota |
|
| Notice of Application for a Route Permit and Public Information Meeting for the Southdale to Scearcyville 115 kV Transmission Line Project (299 KB) | document details | The Office of Energy Security will conduct a public information and environmental assessment scoping meeting for the Great River Energy and Minnesota Power Southdale to Scearcyville 115 kV Transmission Line Project on September 9, 2008, at Cragun's Conference Center in Brainerd, Minnesota |
|
| Order accepting the Southdale to Scearcyville 115 kV Route Permit Application as Complete (1.4 MB) | document details | The Great River Energy and Minnesota Power Southdale to Scearcyville 115 kV High Voltage Transmission Line and Breaker Station Route Permit Application was accepted as complete by the Public Utilities Commission on August 15, 2008 |
|
| Comments & Recommendations of OES EFP staff on the proposed Southdale to Scearcyville 115 kV route permit application acceptance (349 KB) | document details | Application acceptance to be considered by PUC at the August 14, 2008, Commission Meeting |
|
| Application to the Minnesota Public Utilities Commission for Southdale to Scearcyville Route Permit | Application for alternative permitting process for a 115 kilovolt (kV) high voltage transmission line and new breaker station in Cross and Crow Wing counties |
|
| Date | Document | On Behalf Of | Description |
| 12/03/12 | 201212-81298-01 | GREAT RIVER ENERGY AND MINNESOTA POWER | COMPLIANCE FILING--STATUS REPORT AND COMPLAINT REPORT FOR NOVEMBER 2012 PLUS GPS COORDINATES AND AS-BUILTS FOR CLOSEOUT, SOUTHDALE TO SCEARCYVILLE 115 KV PROJECT |
| 11/07/12 | 201211-80463-01 | GREAT RIVER ENERGY AND MINNESOTA POWER | COMPLIANCE FILING--STATUS REPORT AMD COMPLAINT REPORT FOR OCTOBER, 2012, SOUTHDALE TO SCEARCYVILLE 115 KV PROJECT |
| 10/05/12 | 201210-79292-01 | GREAT RIVER ENERGY AND MINNESOTA POWER | COMPLIANCE FILING--STATUS REPORT AND COMPLAINT REPORT FOR SEPTEMBER, 2012, SOUTHDALE TO SCEARCYVILLE 115 KV PROJECT |
| 09/05/12 | 20129-78399-01 | GREAT RIVER ENERGY AND MN POWER | COMPLIANCE FILING--STATUS REPORT AND COMPLAINT REPORT FOR AUGUST 2012, SOUTHDALE TO SCEARCYVILLE 115 KV PROJECT |
| 08/03/12 | 20128-77565-01 | GREAT RIVER ENERGY AND MINNESOTA POWER | COMPLIANCE FILING--STATUS REPORT AND COMPLAINT REPORT FOR JULY 2012, SOUTHDALE TO SCEARCYVILLE 115 KV PROJECT |
| 07/10/12 | 20127-76621-01 | DOC EFP | COMPLIANCE FILING--ACKNOWLEDGEMENT OF RECEIPT - ENERGIZATION |
| 07/09/12 | 20127-76573-01 | GREAT RIVER ENERGY AND MINNESOTA POWER | COMPLIANCE FILING--STATUS REPORT AND COMPLAINT REPORT FOR JUNE 2012, NOTIFICATION OF ENERGIZATION SCHEDULE, SOUTHDALE TO SCEARCYVILLE 115 KV PROJECT |
| 06/04/12 | 20126-75336-01 | GREAT RIVER ENERGY AND MINNESOTA POWER | COMPLIANCE FILING--STATUS REPORT AND COMPLAINT REPORT FOR MAY 2012, SOUTHDALE TO SCEARCYVILLE 115 KV PROJECT |
| 05/02/12 | 20125-74415-01 | GREAT RIVER ENERGY AND MINNESOTA POWER | COMPLIANCE FILING--STATUS REPORT AND COMPLAINT REPORT FOR APRIL 2012, SOUTHDALE TO SCEARCYVILLE 115 KV PROJECT |
| 04/05/12 | 20124-73362-01 | GREAT RIVER ENERGY AND MINNESOTA POWER | COMPLIANCE FILING--STATUS REPORT AND COMPLAINT REPORT FOR MARCH 2012, SOUTHDALE TO SCEARCYVILLE 115 KV PROJECT |
| 04/05/12 | 20124-73364-03 | PUC | MINUTES--JANUARY 26, 2012 AGENDA MEETING |
| 03/02/12 | 20123-72155-01 | GREAT RIVER ENERGY | COMPLIANCE FILING--STATUS REPORT AND COMPLAINT REPORT FOR FEBRUARY 2012, SOUTHDALE TO SCEARCYVILLE 115 KV PROJECT |
| 02/13/12 | 20122-71448-01 | GREAT RIVER ENERGY | COMPLIANCE FILING--STATUS REPORT FOR JANUARY 2012 |
| 02/02/12 | 20122-70945-02 | PUC | ORDER--CERTIFICATE OF SERVICE AND SERVICE LIST |
| 02/02/12 | 20122-70945-01 | PUC | ORDER |
| 01/19/12 | 20121-70448-01 | DOC EFP | OTHER--COMPLIANCE FILING ACKNOWLEDGEMENT OF RECEIPT - DECEMBER 2011 |
| 01/18/12 | 20121-70394-01 | DOC EFP | BRIEFING PAPERS--COMMENTS AND RECOMMENDATIONS ON MINOR ALTERATION REQUEST |
| 01/13/12 | 20121-70355-04 | PUC | NOTICE OF COMMISSION MEETING--JANUARY 26, 2012 |
| 01/11/12 | 20121-70187-01 | GREAT RIVER ENERGY | COMPLIANCE FILING--STATUS REPORT FOR DECEMBER 2011 |
| 12/19/11 | 201112-69401-01 | DOC EFP | NOTICE--MINOR ALTERATION APPLICATION AND COMMENT PERIOD |
| 12/15/11 | 201112-69277-01 | PUC | LETTER--TO CAROL SCHMIDT - REVIEW OF COMPLIANCE FILING |
| 12/12/11 | 201112-69150-01 | GREAT RIVER ENERGY | OTHER--MINOR ALTERATION REQUEST FOR SCEARCYVILLE PROJECT |
| 12/08/11 | 201112-69090-01 | DOC EFP | REPLY COMMENTS--EFP RESPONSE TO PLAN AND PROFILE COMPLIANCE FILING |
| 11/22/11 | 201111-68575-01 | GREAT RIVER ENERGY | COMPLIANCE FILING |
| 05/12/10 | 20105-50364-01 | PUC | LETTER--COMPLIANCE APPROVAL |
| 05/10/10 | 20105-50266-01 | DOC OES | COMPLIANCE FILING--COMPLIANCE FILING - STRUCTURE DESIGN |
| 04/27/10 | 20104-49627-01 | GREAT RIVER ENERGY AND MINNESOTA POWER | COMPLIANCE FILING |
| 03/08/10 | 20105-50006-01 | DOC OES | LETTER--LETTER FROM MN HISTORICAL SOCIETY |
| 12/14/09 | 200912-45027-01 | PUC | PUBLIC COMMENT--WEEK ENDING 12-11-09 |
| 11/02/09 | 200911-43470-01 | PUC | PUBLIC COMMENT |
| 10/19/09 | 200910-43013-01 | PUC | PUBLIC COMMENT |
| 10/19/09 | 200910-43002-01 | GREAT RIVER ENERGY | COMPLIANCE FILING |
| 08/28/09 | 20098-41254-01 | GREAT RIVER ENERGY | OTHER--PLAN AND PROFILE, SWITCH STRUCTURE WORK |
| 08/28/09 | 20098-41254-02 | GREAT RIVER ENERGY | OTHER--FIELD REPRESENTATIVE NOTIFICATION |
| 07/29/09 | 20097-40268-02 | PUC | MINUTES--JULY 1, 2009 AGENDA MEETING |
| 07/07/09 | 20097-39363-01 | PUC | ORDER |
| 06/24/09 | 20096-38881-01 | DOC OES | COMMENTS--AND RECOMMENDATIONS |
| 06/19/09 | 20096-38725-01 | PUC | NOTICE OF COMMISSION MEETING--10 DAY NOTICE - JULY 1, 2009 |
| 06/08/09 | 20096-38315-01 | DOC OES | NOTICE--OF PERMIT AMENDMENT REQUEST |
| 06/02/09 | 20096-38127-01 | GREAT RIVER ENERGY | OTHER--REQUEST TO RETRACT 1 MAY 2009 REQUEST FOR A MINOR ALTERATION |
| 06/02/09 | 20096-38127-02 | GREAT RIVER ENERGY | OTHER--REQUEST FOR AN AMENDMENT OF PERMIT CONDITIONS |
| 05/04/09 | 20095-37140-15 | PUC | MINUTES--- MARCH 19, 2009 |
| 05/01/09 | 20095-37097-01 | GREAT RIVER ENERGY | OTHER--REQUEST FOR APPROVAL OF MINOR ALTERATION OF ROUTE PERMIT |
| 04/14/09 | 20094-36226-01 | PUC | NOTICE--OF PERMIT DECISION |
| 04/09/09 | 20094-36061-01 | PUC | ORDER--FINDINGS OF FACT, CONCLUSIONS OF LAW & ORDER ISSUING ROUTE PERMIT TO GREAT RIVER ENERGY & MINNESOTA POWER FOR SOUTHDALE TO SCEARCYVILLE 115 KV TRANSMISSION LINE & BREAKER STATION PROJECT |
| 03/19/09 | 5837516 | DOC OES | OTHER--ATTACHMENT 1-HANDOUT AT ORAL ARGUMENT |
| 03/17/09 | 5822610 | GREAT RIVER ENERGY | COMMENTS--AND PROPOSED FINDINGS |
| 03/17/09 | 5822617 | GREAT RIVER ENERGY | COMMENTS--AND PROPOSED FINDINGS - EXHIBIT C PART 1 |
| 03/17/09 | 5822615 | GREAT RIVER ENERGY | COMMENTS--AND PROPOSED FINDINGS - EXHIBIT B PART 2 |
| 03/17/09 | 5822618 | GREAT RIVER ENERGY | COMMENTS--AND PROPOSED FINDINGS - EXHIBIT C PART 2 |
| 03/17/09 | 5822620 | GREAT RIVER ENERGY | COMMENTS--AND PROPOSED FINDINGS |
| 03/17/09 | 5822611 | GREAT RIVER ENERGY | COMMENTS--AND PROPOSED FINDINGS - EXHIBIT A PART 1 |
| 03/17/09 | 5822613 | GREAT RIVER ENERGY | COMMENTS--AND PROPOSED FINDINGS - EXHIBIT A PART 3 |
| 03/17/09 | 5822621 | GREAT RIVER ENERGY | COMMENTS--AND PROPOSED FINDINGS - ATTACHMENT 3 |
| 03/17/09 | 5822612 | GREAT RIVER ENERGY | COMMENTS--AND PROPOSED FINDINGS - EXHIBIT A PART 2 |
| 03/17/09 | 5822616 | GREAT RIVER ENERGY | COMMENTS--AND PROPOSED FINDINGS - EXHIBIT B PART 3 |
| 03/17/09 | 5822614 | GREAT RIVER ENERGY | COMMENTS--AND PROPOSED FINDINGS - EXHIBIT B PART 1 |
| 03/17/09 | 5822619 | GREAT RIVER ENERGY | COMMENTS--AND PROPOSED FINDINGS - ATTACHMENT 3 |
| 03/11/09 | 5811182 | DOC OES | NOTICE--OF COMMISSION MTG AND AVAILABILITY OF PROPOSED ROUTE PERMIT |
| 03/11/09 | 5810958 | DOC OES | COMMENTS--AND RECOMMENDATIONS |
| 03/09/09 | 5804167 | COURT REPORTER | TRANSCRIPTS--1/22/09 BRIANERD PUBLIC HEARING |
| 03/06/09 | 5804036 | PUC | NOTICE--COMMISSION MEETING |
| 02/20/09 | 5774360 | OAH | ORDER--SUMMARY OF PUBLIC COMMENTS |
| 02/10/09 | 5763717 | OAH | COMMENTS--1013-20215 PUB COMMENT EXS 20-22 |
| 02/10/09 | 5763719 | OAH | COMMENTS--1013-20215 PUB COMMENT EXS 28-30 |
| 02/10/09 | 5763718 | OAH | COMMENTS--1013-20215 PUB COMMENT EXS 23-27 |
| 02/09/09 | 5762298 | OAH | COMMENTS--1013-20215 PUB EXS 12-19 |
| 02/09/09 | 5762297 | OAH | COMMENTS--1013-20215 GRE POST-HEARING COMMENTS |
| 02/06/09 | 5757629 | GREAT RIVER ENERGY | COMMENTS-- |
| 02/02/09 | 5733999 | OAH | EXHIBITS--PUBLIC COMMENTS EXHIBITS 8-11 |
| 02/02/09 | 5733996 | OAH | OTHER--HEARING REGISTER |
| 02/02/09 | 5733997 | OAH | EXHIBITS--PUBLIC COMMENTS EXHIBITS 1-7 |
| 01/16/09 | 5701726 | DOC OES | NOTICE--EQB MONITOR EA AND PUBLIC HEARING |
| 01/15/09 | 5701343 | BRAINERD DISPATCH | OTHER--AFFIDAVIT OF PUBLICATION |
| 01/06/09 | 5694123 | DOC OES | NOTICE--OF PUBLIC HEARING AND EA AVAILABILITY |
| 01/06/09 | 5696429 | DOC OES | OTHER--ENVIRONMENTAL ASSESSMENT |
| 11/07/08 | 5609765 | OES | DECISION--EAS DECISION - 3RD MAILING |
| 11/04/08 | 5601760 | OES | OTHER--EAS DECISION |
| 10/27/08 | 5587928 | OES | DECISION-- |
| 10/23/08 | 5587734 | OES | OTHER--ENVIRONMENTAL ASSESSMENT SCOPING DECISION |
| 10/22/08 | 5586884 | GREAT RIVER ENERGY | OTHER--CORRECTION TO TABLE 4-1 AND SUBSEQUENT REFERENCES |
| 10/22/08 | 5586842 | OES | OTHER--ENVIRONMENTAL ASSESSMENT SCOPING DECISION |
| 10/14/08 | 5562629 | GREAT RIVER ENERGY | NOTICE--OF PUBLIC COMMENT PERIOD TO REJECTED ROUTE E & F LANDOWNERS |
| 10/14/08 | 5562626 | GREAT RIVER ENERGY | NOTICE--OF PROJECT & NOTICE OF PUBLIC MEETING TO PROJECT AND GENERAL MAILING LIST |
| 10/14/08 | 5562628 | GREAT RIVER ENERGY | NOTICE--OF PROJECT AND NOTICE OF PUBLIC MEETING TO LEGAL NEWSPAPERS |
| 10/06/08 | 5551183 | PUC | OTHER--MINUTES - AUGUST 14, 2008 |
| 09/24/08 | 5701279 | VARIOUS PARTIES | COMMENTS--CORRECTED COMMENTS |
| 09/24/08 | 5587941 | VARIOUS PARTIES | COMMENTS--PART 1 OF 2 |
| 09/24/08 | 5587942 | VARIOUS PARTIES | COMMENTS--PART 2 OF 2 |
| 08/28/08 | 5471433 | VARIOUS PARTIES | COMMENTS-- |
| 08/27/08 | 5466915 | GREAT RIVER ENERGY AND MINNESOTA POWER | NOTICE--AFFIDAVIT OF SERVICE FOR NOTICE OF SUBMISSION & NOTICE OF PUBLIC MEETING |
| 08/27/08 | 5465644 | OES | NOTICE--AFFIDAVIT & SERVICE LIST OMITTED FROM 8/26 NOTICE |
| 08/26/08 | 5465503 | OES | NOTICE--REVISED NOTICE OF PUBLIC INFO MTG |
| 08/21/08 | 5457739 | OES | OTHER--LETTER TO TECH REPS |
| 08/19/08 | 5454390 | OES | NOTICE--OF APPLICATION FOR ROUTE PERMIT AND PUBLIC INFO MTG |
| 08/18/08 | 5439542 | BRIGGS AND MORGAN, P.A. | OTHER--ADDING LISA TO SERVICE LIST |
| 08/15/08 | 5436279 | PUC | ORDER-- |
| 08/06/08 | 5410943 | OES | COMMENTS--AND RECOMMENDATIONS |
| 08/01/08 | 5407964 | PUC | NOTICE--OF COMMISSION MEETING |
| 07/17/08 | 5361528 | GREAT RIVER ENERGY | INITIAL FILING--ROUTE PERMIT APPLICATION COVER LETTER |
| 07/17/08 | 5361530 | GREAT RIVER ENERGY | INITIAL FILING--ROUTE PERMIT APPLICATION |
| 06/18/08 | 5285531 | GREAT RIVER ENERGY AND MINNESOTA POWER | INITIAL FILING--NOTICE OF INTENT TO SUBMIT ROUTE PERMIT APPLICATION UNDER ALTERNATIVE PROCESS |