| Docket Number | Project Name | Description | Applicant | Status |
| 13-68 | Minnesota Power proposes to construct approximately one mile of new 115 kV transmission line, approximately 0.3 miles of new 230 kV transmission line, and a replacement substation east of the city of Deer River in Itasca County. The Deer River Transmission Project would also rebuild approximately 0.9 miles of an existing 115 kV transmission line, and remove approximately 7.5 miles of existing 115 kV transmission line |
Minnesota Power |
•
Upcoming: Application accepted more |
|
| 13-216 | EDF Renewable Energy is applying for an LWECS permit in Pipestone and Murray counties through its Stoneray Power Partners, LLC subsidiary |
Stoneray Power Partners, LLC |
•
Upcoming: Application accepted more |
|
| 12-1337 | ITC Midwest, LLC (ITCM) proposes to construct a new 345 kV transmission line in Jackson, Martin, and Faribault County; to reroute several existing 161 kV lines; and to construct a new substation near the cities of Winnebago and Blue Earth. |
ITC Midwest LLC |
•
Upcoming: Application accepted more |
|
| 12-1151 | Xcel Energy proposes to replace an existing 115 kV transmission line with a new, double circuit 115 kV transmission line and to modify two existing substations in northeast Ramsey County |
Northern States Power dba Xcel Energy |
•
2013-04-23: Public meeting more |
|
| 12-1245 | Great River Energy proposes to rebuild a portion of the existing 69 kV transmission system and construct a new double-circuit 115 kV transmission line in Scott and Rice counties |
Great River Energy |
•
Upcoming: Application accepted more |
|
| 12-1123 | Minnesota Power proposes to construct a new, approximately 2.8-mile-long 115 kV HVTL from MP's existing 39 line in the city of Eveleth to MP's existing 37 line northwest of the city of Leonidas |
Minnesota Power |
•
2013-04-17: Scoping decision more |
|
| 12-401 | Xcel Energy proposes to upgrade the Chaska Area 69 kV transmission line to 115 kV capacity in in eastern Carver County and northern Scott County near and within the City of Chaska, and through Laketown, Dahlgren, and Jackson townships |
Great River Energy; Northern States Power dba Xcel Energy |
•
2013-03-25: Environmental document available more |
|
| 12-113 | The proposed project is intended to meet electrical needs in the Plymouth and Medina area. The proposal involves constructing a new substation, expanding another substation, and connecting the two substations with a 115 kilovolt transmission line. |
Xcel Energy and Great River Energy |
•
2013-03-06: Public hearing more |
|
| 11-948 | Xcel Energy proposes to upgrade the Scott-County-Bluff Creek-Westgate 69 kV transmission line to 115 kV capacity near the cities of Chanhassen, Shorewood, Excelsior, Deephaven, Greenwood, Minnetonka and Eden Prairie, |
Northern States Power dba Xcel Energy |
•
2013-05-16: Public hearing more |
|
| 12-126 | High Prairie Pipeline, LLC proposes to construct an underground crude oil pipeline from McKenzie County, North Dakota, to Clearbook, Minnesota, and associated facilities. Approximately 65 miles of the project are proposed to be located in Minnesota and the project is proposed to cross the Red River near Bygland, Minnesota |
High Prairie Pipeline, LLC |
•
Upcoming: Application accepted more |
|
| 11-795 | Xcel Energy proposes to replace approximately 4.6 miles of 115 kV transmission line between the Black Dog substation and Savage substation in Burnsville, Minnesota |
Xcel Energy |
•
2013-05-03: Permit issued more |
|
| 11-471 | Black Oak Wind, LLC, and Getty Wind, LLC, have jointly submitted a Certificate of Need Application for the proposed Black Oak Wind Farm and Getty Wind Project in Stearns County. The two projects are adjacent to one another and are located near Sauk Centre. The proposed Black Oak Wind Farm is a 42 MW project located in Ashley and Raymond townships . The Getty Wind Project is a 40 MW project located in Getty and Sauk Centre townships. |
Geronimo Wind Energy, LLC; Getty Wind Company, LLC; Geronimo Wind Energy, LLCBlack Oak Wind. LLC |
•
2012-06-26: Public hearing more |
|
| 11-867 | Great River Energy proposes to replace approximately 2.1 miles of existing 41.6 kV transmission line with 115 kV line and to update the existing Parkers Prairie substation in Otter Tail County, near the city of Parkers Prairie |
Great River Energy |
•
2012-08-28: Permit issued more |
|
| 11-863 | CWS application for a site permit for a 30 MW LWECS in Nobles County, south of Wilmont |
Community Wind South, LLC |
•
2012-12-15: Project built more |
|
| 11-608 | Ellerth Wind, LLC site permit application for the 98.9 MW for the Ellerth Windpark in Marshall County |
TCI Renewables |
•
2011-12-07: Application accepted more |
|
| 11-831 | Getty Wind Company, LLC, proposes to develop a 40 MW wind farm in Getty and Sauk Centre townships in Stearns County. |
Getty Wind Company, LLC |
•
2013-01-28: Permit issued more |
|
| 11-915 | Great River Energy and Minnesota Municipal Power Agency propose to construct a new 5.8-mile 115-kilovolt (kV) transmission line to serve Anoka Municipal Utilities� existing Enterprise Park Substation. The Project will also require modifications to Xcel Energy�s existing Crooked Lake Substation and the addition of a 115-kV transformer at AMU�s Enterprise Park Substation. |
Great River Energy |
•
2012-08-24: Permit issued more |
|
| 11-800 | Northern States Power Company (dba Xcel Energy), on behalf of CapX 2020 co-owners, has submitted a route permit application for a 30-mile, 161-kilovolt transmission line from the proposed North Rochester substation near Pine Island and Zumbrota, Minn., to the existing Chester substation east of Rochester, Minn |
Northern States Power |
•
2012-09-12: Permit issued more |
|
| 11-152 | Xcel Energy and Great River Energy (GRE) propose removing approximately eight miles of an existing GRE-owned 69 kilovolt (kV) overhead transmission line and constructing a new 115 kV overhead transmission in its place, constructing an additional eight-tenths of a mile of new 115 kV overhead transmission line, constructing a new substation, and modifying associated transmission facilities in the cities of Medina and Plymouth, Hennepin County, Minnesota |
Xcel Energy |
•
2012-07-31: Scoping decision more |
|
| 11-318 | Great River Energy and Minnesota Power propose to construct a new 3.8 mile 115 kV transmission line in Morrison County east of the city of Little Falls. The Project would also modify Minnesota Power's Little Falls Substation within the existing fenced area and expand Crow Wing Power's existing 34.5 kV Little Falls Substation by approximately 0.1 acres to accommodate the new 115 kV source. |
Great River Energy; Minnesota Power |
•
2012-03-26: Permit issued more |
|
| 11-223 | Xcel Energy Proposes to replace the existing 69 kV Orono Substation and construct approximately 0.6 miles of new 115 kV transmission line in the city of Orono in Hennepin County |
Xcel Energy |
•
2012-04-06: Permit issued more |
|
| 11-307 | Xcel Energy's proposed Black Dog Repowering Project to install natural gas-fired combined cycle electric generating technology to replace two existing units currently fueled by low-sulfur western coal |
Xcel Energy |
•
2012-12-10: Docket closed more |
|
| 11-195 | Proposed 44 megawatt Large Wind Energy Conversion System in Freeborn County |
Minnesota Municipal Power Agency (MMPA); Shell Rock Wind Farm, LLC |
•
2011-12-14: Permit issued more |
|
| 10-1307 | Great River Energy and Minnesota Power have submitted applications to the Minnesota Public Utilities Commission for a Certificate of Need and a Route Permit to construct the new Savanna 115 kilovolt (kV) Switching Station near Floodwood, Minnesota, and to rebuild approximately 37 total miles of existing 69 kV transmission line to 115 kV specifications |
Great River Energy; Minnesota Power |
•
2012-03-07: Permit issued more |
|
| 10-438 | Prairie Wind Energy, LLC is applying for a site permit and a certificate of need for an 100 MW LWECS near Parkers Prairie |
Prairie Wind Energy, LLC |
•
2012-03-19: Permit issued more |
|
| 10-1238 | Proposed 36 megawatt Large Wind Energy Conversion System in Faribault County |
Big Blue Wind Farm, LLC; Exergy Development Group of Idaho, LLC |
•
2012-12-15: Project built more |
|
| 10-1240 | 40 MW Wind Farm in Stearns County proposed by Black Oak Wind, LLC, a wholly-owned subsidiary of Geronimo Wind Energy |
Geronimo Wind Energy, LLC; Geronimo Wind Energy, LLCBlack Oak Wind. LLC |
•
2013-01-28: Permit issued more |
|
| 09-1390 | Certificate of Need: Approximately 2.8 miles of new 115 kilovolt (kV) transmission line and upgrade approximately 20.2 miles of 69 kV transmission line to 115 kV capacity (approximately 23 miles total) near the cities of Glencoe, Plato, Norwood Young America and Waconia located southwest of the Twin Cities metro area |
NSP, dba Xcel Energy |
•
2011-11-14: Certificate of Need issued more |
|
| 10-694 | The Hiawatha Project was designed to address the distribution system problems that exist in south Minneapolis. The Project consists of two new 115/13.8 kV distribution substations equipped with smart substation technologies, two 115 kV transmission lines and two new taps of the existing Elliot Park – Southtown 115 kV transmission line |
Xcel Energy |
•
2012-02-10: Certificate of Need issued more |
|
| 10-249 | Approximately 2.8 miles of new 115 kilovolt (kV) transmission line and upgrade approximately 20.2 miles of 69 kV transmission line to 115 kV capacity (approximately 23 miles total) near the cities of Glencoe, Plato, Norwood Young America and Waconia located southwest of the Twin Cities metro area |
Xcel Energy |
•
2011-11-14: Permit issued more |
|
| 09-1448 | Xcel Energy Application to construct a new 345 kV and a new 161kV transmission line from the Hampton Substation, through Rochester, to a proposed substation in La Crosse, Wis |
Xcel Energy |
•
2012-05-30: Permit issued more |
|
| 08-1233 | Proposed 78 Megawatt Large Wind Energy Conversion System in Goodhue County. |
Goodhue Wind, LLC |
•
2011-08-23: Permit issued more |
|
| 09-1056 | Xcel Energy and GRE Application to construct a new 345 kV HVTL between the new Quarry Substation near St. Cloud and a proposed Bison Substation in North Dakota |
Great River Energy; Xcel Energy |
•
2012-04-12: Permit Amended more |
|
| 09-512 | NPUC proposes to construct four 230 kV transmission lines and two 230 kV substations to supply electric power to the Essar Steel Minnesota project |
•
2010-08-03: Permit issued more |
||
| 09-38 | The Hiawatha Project was designed to address the distribution system problems that exist in south Minneapolis. The Project consists of two new 115/13.8 kV distribution substations equipped with smart substation technologies, two 115 kV transmission lines and two new taps of the existing Elliot Park – Southtown 115 kV transmission line |
•
2012-02-10: Permit issued more |
||
| 08-973 | Proposed 280 Megawatt Large Wind Energy Conversion System in Fillmore County. |
EcoEnergy; EcoHarmony West Wind, LLC |
•
2010-02-03: Permit issued more |
|
| 08-1474 | Proposed 345 kilovolt (kV) transmission line and associated facilities running from Brookings County, South Dakota, to Hampton, Minnesota |
•
2010-09-14: Permit Decision more |
||
Minor Alterations to Transmission Lines or Large Electric Power Generating Plants |
||||
A utility seeking a route permit for a transmission line that meets certain qualifications may elect to seek approval from a local unit of government. If local review is elected, a permit from the PUC is not required. This docket contains local review projects |
||||
Annual Hearing for the Energy Facility Permitting program |
NA |